[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1269010":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1269010,856,2,"多选题","对灰土地基、砂和砂石地基、土工合成材料地基、粉煤灰地基、强夯地基、注浆地基、预压地基，其竣工后的地基强度或承载力必须达到设计要求的标准。频率应满足下列要求（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","每单位工程不应少于1点",false,{"key":16,"text":17,"correct":18},"B","1000㎡以上工程，每100㎡至少应有1点",true,{"key":20,"text":21,"correct":18},"C","3000㎡以上工程，每300㎡至少应有1点",{"key":23,"text":24,"correct":18},"D","每一独立基础下至少应有1点",{"key":26,"text":27,"correct":14},"E","基槽每50延米应有1点","BCD","对灰土地基、砂和砂石地基、土工合成材料地基、粉煤灰地基、强夯地基、注浆地基、预压地基，其竣工后的地基强度或承载力必须达到设计要求的标准。频率应满足每单位工程不应少于3点，1000㎡以上工程，每100㎡至少应有1点53000㎡以上工程，每300㎡至少应有1点。每一独立基础下至少应有1点，基槽每20延米应有1点。",{"id":6,"name":31,"category":32,"favorite":33},"(市政质量)专业管理实务 岗位知识","建筑工程",0]