[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1269007":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},1269007,856,2,"多选题","倒虹管及涵洞试验内容包括（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","地基承载力",true,{"key":16,"text":17,"correct":14},"B","混凝土、砂浆强度",{"key":19,"text":20,"correct":14},"C","原材料",{"key":22,"text":23,"correct":14},"D","倒虹管闭水试验",{"key":25,"text":26,"correct":14},"E","回填压实度","ABCDE","倒虹管及涵洞试验内容包括地基承载力；混凝土、砂浆强度；原材料；倒虹管闭水试验；回填压实度。",{"id":6,"name":30,"category":31,"favorite":32},"(市政质量)专业管理实务 岗位知识","建筑工程",0]