[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268970":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1268970,856,2,"多选题","给水排水管道安装完毕后，应进行管道功能性试验。 给水管道必须水压试验合格，并网运行前进行（ ），经检验水质达到标准后，方可允许并网通水投人运行。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","冲洗",true,{"key":16,"text":17,"correct":18},"B","吹扫",false,{"key":20,"text":21,"correct":14},"C","消毒",{"key":23,"text":24,"correct":18},"D","检查",{"key":26,"text":27,"correct":18},"E","化验","AC","给水管道必须水压试验合格，并网运行前进行冲洗消毒，经检验水质达到标准后，方可允许并网通水投人运行。",{"id":6,"name":31,"category":32,"favorite":33},"(市政质量)专业管理实务 岗位知识","建筑工程",0]