[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268965":3},{"question":4,"library":29},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":27,"analysis":28},1268965,856,2,"多选题","施工阶段质量控制要做到施工项目有方案、质量预控有对策、技术措施有交底、材料配制使用有试验、工序交接有检查、（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","隐蔽工程有验收",true,{"key":16,"text":17,"correct":14},"B","成品保护有措施",{"key":19,"text":20,"correct":14},"C","行使质量一票否决",{"key":22,"text":23,"correct":14},"D","设计变更有手续",{"key":25,"text":26,"correct":14},"E","质量文件有档案","ABCDE","施工阶段质量控制要做到施工项目有方案、质量预控有对策、技术措施有交底、材料配制使用有试验、工序交接有检查、隐蔽工程有验收、成品保护有措施、行使质量一票否决、设计变更有手续、质量文件有档案。",{"id":6,"name":30,"category":31,"favorite":32},"(市政质量)专业管理实务 岗位知识","建筑工程",0]