[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268952":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1268952,856,2,"多选题","要求（ ）等必须做可追溯性记录，质量计划要对其可追溯性范围、程序、标识、所需记录及如何控制和分发这些记录等内容做出规定。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","隐蔽工程",true,{"key":16,"text":17,"correct":14},"B","分项分部工程质量验评",{"key":19,"text":20,"correct":21},"C","单位工程",false,{"key":23,"text":24,"correct":21},"D","临时工程",{"key":26,"text":27,"correct":14},"E","特殊要求的工程","ABE","要对其可追溯性范围、程序、标识、所需记录及如何控制和分发这些记录等内容做出规定。坐标控制点、标高控制点、编号、沉降观察点、安全标志、标牌等是工程重要标识记录，质量计划要对这些标识的准确性控制措施、记录等内容作规定。",{"id":6,"name":31,"category":32,"favorite":33},"(市政质量)专业管理实务 岗位知识","建筑工程",0]