[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268946":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1268946,856,1,"单选题","工程建设中拟采用的新技术、新工艺、新材料，不符合现行强制性标准规定的，应当由拟采用单位提请（ ）组织专题技术论证，报批准标准的建设行政主管部门或者国务院有关主管部门审定。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","监理单位",false,{"key":16,"text":17,"correct":18},"B","建设单位",true,{"key":20,"text":21,"correct":14},"C","质监站",{"key":23,"text":24,"correct":14},"D","设计单位","工程建设中拟采用的新技术、新工艺、新材料，不符合现行强制性标准规定的，应当由拟采用单位提请建设单位组织专题技术论证，报批准标准的建设行政主管部门或者国务院有关主管部门审定。",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)专业管理实务 岗位知识","建筑工程",0]