[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268940":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1268940,856,1,"单选题","分部工程应由（ ）组织施工单位项目负责人和项目技术、质量负责人进行验收。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","建设单位负责人",false,{"key":16,"text":17,"correct":14},"B","建设单位项目负责人",{"key":19,"text":20,"correct":21},"C","总监理工程师",true,{"key":23,"text":24,"correct":14},"D","专业监理工程师","分部工程应由总监理工程师组织施工单位项目负责人和项目技术负责人等进行验收。",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)专业管理实务 岗位知识","建筑工程",0]