[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268926":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1268926,856,1,"单选题","分项工程应由（ ）组织施工单位项目专业技术负责人等进行验收。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","建设单位负责人",false,{"key":16,"text":17,"correct":14},"B","建设单位项目负责人",{"key":19,"text":20,"correct":14},"C","总监理工程师",{"key":22,"text":23,"correct":24},"D","专业监理工程师",true,"分项工程应由专业监理工程师组织施工单位项目专业技术负责人等进行验收。",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)专业管理实务 岗位知识","建筑工程",0]