[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268900":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1268900,856,1,"单选题","水池应按设计要求进行满水试验和（ ），并由试验（检测）单位出具试验（检测）报告。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","水压试验",false,{"key":16,"text":17,"correct":14},"B","闭水试验",{"key":19,"text":20,"correct":14},"C","闭气试验",{"key":22,"text":23,"correct":24},"D","气密性试验",true,"水池应按设计要进行满水试验和气密性试验，并由试验（检测）单位出具试验（检测）报告。",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)专业管理实务 岗位知识","建筑工程",0]