[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268880":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1268880,856,1,"单选题","空心板梁预制过程中芯模上浮的预防措施不包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","若采用胶囊做内模，应用定位箍筋与主筋联系加以固定，并应对称平衡地进行浇筑",false,{"key":16,"text":17,"correct":18},"B","加设通长钢带，在顶部每隔2m采用一道压杠压住钢带，防止上浮",true,{"key":20,"text":21,"correct":14},"C","当采用空心内模时，应与主筋相连或压重（压杠），防止上浮",{"key":23,"text":24,"correct":14},"D","分两层浇筑，先浇筑底板混凝土","空心板梁预制过程中芯模上浮的预防措施：若采用胶囊做内模，应用定位箍筋与主筋联系加以固定，并应对称平衡地进行浇筑；当采用空心内模时，应与主筋相连或压重（压杠），防止上浮；分两层浇筑，先浇筑底板混凝土",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)专业管理实务 岗位知识","建筑工程",0]