[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268867":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1268867,856,1,"单选题","后张法施工压浆不饱满的原因分析不包括（ ）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","压浆时锚具处预应力筋间隙漏浆",false,{"key":16,"text":17,"correct":14},"B","压浆时，孔道未清净，有残留物或积水",{"key":19,"text":20,"correct":14},"C","水泥浆泌水率偏大",{"key":22,"text":23,"correct":24},"D","压浆时大气温度较低",true,"后张法施工压浆不饱满的原因：压浆时锚具处预应力筋间隙漏浆；压浆时，孔道未清净，有残留物或积水；水泥浆泌水率偏大",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)专业管理实务 岗位知识","建筑工程",0]