[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268861":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1268861,856,1,"单选题","路面与平石、路缘石衔接不顺的预防处理方法不包括（ ）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","各层结构在路边的高程未严格控制",false,{"key":16,"text":17,"correct":18},"B","铺筑沥青混合料面层时，依据平石高程找平",true,{"key":20,"text":21,"correct":14},"C","边缘部位摊铺高的基准线应以平石面作依据，如发现有偏离平石面的现象，应及时纠正",{"key":23,"text":24,"correct":14},"D","对油路面与平石间小的偏差和毛茬，应由专人进行仔细修整","路面与平石、路缘石衔接不顺的预防处理方法包括：各层结构在路边的高程未严格控制；边缘部位摊铺高的基准线应以平石面作依据，如发现有偏离平石面的现象，应及时纠正；对油路面与平石间小的偏差和毛茬，应由专人进行仔细修整",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)专业管理实务 岗位知识","建筑工程",0]