[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268852":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1268852,856,1,"单选题","路基施工工艺过程质量控制点不包含（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","宽度",false,{"key":16,"text":17,"correct":18},"B","放坡、测量",true,{"key":20,"text":21,"correct":14},"C","压实度",{"key":23,"text":24,"correct":14},"D","中线高程","路基施工工艺过程质量控制点包含1.宽度；2.压实度；3.中线高程。",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)专业管理实务 岗位知识","建筑工程",0]