[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268834":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1268834,856,1,"单选题","隐蔽工程的验收应由施工单位做好自检记录，在隐蔽验收日提前（ ）h通知相关单位验收。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","12",false,{"key":16,"text":17,"correct":14},"B","24",{"key":19,"text":20,"correct":14},"C","36",{"key":22,"text":23,"correct":24},"D","48",true,"隐蔽工程的验收应由施工单位做好自检记录，在隐蔽验收日提前48h通知相关单位验收。",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)专业管理实务 岗位知识","建筑工程",0]