[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268746":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1268746,856,1,"单选题","路基压实度的控制，压实应先轻后重、先慢后快、均匀一致，压路机最快速度不宜超过（ ）km\u002Fh。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","1",false,{"key":16,"text":17,"correct":14},"B","2",{"key":19,"text":20,"correct":14},"C","3",{"key":22,"text":23,"correct":24},"D","4",true,"路基压实度的控制，压实应先轻后重、先慢后快、均匀一致，压路机最快速度不宜超过4km\u002Fh。",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)专业管理实务 岗位知识","建筑工程",0]