[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268713":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1268713,856,1,"单选题","沥青混合料面层不得在雨、雪天气及环境最高温度低于（ ）℃时施工。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","-5",false,{"key":16,"text":17,"correct":14},"B","-",{"key":19,"text":20,"correct":14},"C","3",{"key":22,"text":23,"correct":24},"D","5",true,"沥青混合料面层不得在雨、雪天气及环境最高温度低于5℃时施工。",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)专业管理实务 岗位知识","建筑工程",0]