[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268697":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1268697,856,1,"单选题","工程项目完工后，施工单位应自行组织有关人员进行检验，并将资料与自检结果，报（ ）申请验收.",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","建设单位",false,{"key":16,"text":17,"correct":14},"B","设计单位",{"key":19,"text":20,"correct":21},"C","监理单位",true,{"key":23,"text":24,"correct":14},"D","监督站","施工项目完工后，施工单位应自行组织有关人员进行检验，并将资料与自检结果，报监理单位申请验收。",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)专业管理实务 岗位知识","建筑工程",0]