[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268691":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1268691,856,1,"单选题","下列不属于城镇桥梁预应力工程质量控制点的是。（ ）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","预埋管道位置、尺寸、连接等检查",false,{"key":16,"text":17,"correct":14},"B","张拉程序、张拉控制应力、伸长率、持荷时间控制",{"key":19,"text":20,"correct":14},"C","张拉设备、预应力筋、锚夹具检（试）验试验",{"key":22,"text":23,"correct":24},"D","焊接工艺评定",true,"桥梁预应力工程质量控制点包括：预埋管道位置、尺寸、连接等检查；张拉程序、张拉控制应力、伸长率、持荷时间控制；张拉设备、预应力筋、锚夹具检（试）验试验。",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)专业管理实务 岗位知识","建筑工程",0]