[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268664":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1268664,856,1,"单选题","以下不属于质量计划的编制要求有（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","材料、设备、机械、劳务及实验等采购控制",false,{"key":16,"text":17,"correct":14},"B","施工工艺过程的控制",{"key":19,"text":20,"correct":14},"C","搬运、存储、包装、成品保护和交付过程的控制",{"key":22,"text":23,"correct":24},"D","质量管理体系的设置",true,"质量管理体系的设置属于施工项目质量计划编制的方法。",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)专业管理实务 岗位知识","建筑工程",0]