[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-855-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":609},{"id":5,"name":6,"category":7,"favorite":8},855,"(市政质量)基础知识","建筑工程",0,9,50,1355,[13,34,46,58,70,82,94,106,118,127,139,150,158,170,182,194,206,217,229,241,251,263,275,287,299,311,323,335,347,359,371,383,395,407,419,431,443,455,467,479,491,503,515,527,537,549,561,573,585,597],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1267697,1,"单选题","以下哪项是以整个构筑物为对象，而规定人工、机械与材料的耗用量及其费用标准（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","概算定额",false,{"key":24,"text":25,"correct":22},"B","施工定额",{"key":27,"text":28,"correct":22},"C","预算定额",{"key":30,"text":31,"correct":32},"D","概算指标",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1267698,"电力电缆主要为城市输送电能，按其功能可分为动力电缆、（ ）、电车电缆等。",[38,40,42,44],{"key":20,"text":39,"correct":22},"军用电缆",{"key":24,"text":41,"correct":22},"工业电缆",{"key":27,"text":43,"correct":32},"照明电缆",{"key":30,"text":45,"correct":22},"民用电缆",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1267699,"承插式球墨铸铁管采用推人式柔性接口，其施工程序包含：①下管；②上胶圈；③撞口；④检查；⑤清理插口外表面、刷润滑剂；⑥清理承口和胶圈等六个步骤，施工先后顺序排列正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"⑥②①⑤③④",{"key":24,"text":53,"correct":22},"⑥②⑤①③④",{"key":27,"text":55,"correct":32},"①⑥②⑤③④",{"key":30,"text":57,"correct":22},"①⑤⑥②③④",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},1267700,"市政管道施工时，一般应根据管道材质、（ ）和地基条件确定管道基础形式。",[62,64,66,68],{"key":20,"text":63,"correct":22},"管道种类",{"key":24,"text":65,"correct":22},"地下水埋深",{"key":27,"text":67,"correct":22},"管道埋深",{"key":30,"text":69,"correct":32},"接口形式",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},1267701,"截流井的位置应根据（ ）、合流管渠位置、溢流管下游水位高度和周围环境等因素确定。",[74,76,78,80],{"key":20,"text":75,"correct":32},"污水截流干管位置",{"key":24,"text":77,"correct":22},"交汇位置",{"key":27,"text":79,"correct":22},"水力大小",{"key":30,"text":81,"correct":22},"排水能力",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1267702,"下管时，起重机一般沿沟槽开行，距槽边至少应有（ ）以上的安全距离，以免槽壁坍塌。",[86,88,90,92],{"key":20,"text":87,"correct":22},"0.8m",{"key":24,"text":89,"correct":32},"1m",{"key":27,"text":91,"correct":22},"1.5m",{"key":30,"text":93,"correct":22},"2m",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1267703,"管道沟槽的深度按基础的形式和埋深分别计算，枕基的计算方法是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"原地面高程减设计管道基础底面高程",{"key":24,"text":101,"correct":32},"原地面高程减设计管道基础底面高程加管壁厚度",{"key":27,"text":103,"correct":22},"原地面高程减设计管道基础底面高程加垫层厚度",{"key":30,"text":105,"correct":22},"原地面高程减设计管道基础底面高程减管壁厚度",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1267704,"可隔绝易爆、易燃气体进人排水管渠，使排水管渠在进人可能遇火的场地时不致引起爆炸、火灾的检查井称为（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"换气井",{"key":24,"text":113,"correct":22},"消能井",{"key":27,"text":115,"correct":32},"水封井",{"key":30,"text":117,"correct":22},"截流井",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":30,"analysis":33},1267705,"使用国有资金投资的建设工程发承包，必须采用（ ）计价。",[122,123,124,125],{"key":20,"text":25,"correct":22},{"key":24,"text":28,"correct":22},{"key":27,"text":21,"correct":22},{"key":30,"text":126,"correct":32},"工程量清单",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":27,"analysis":33},1267706,"以下支撑形式中，（ ）适用于土质较差、有地下水，且挖土深度较大的情况。",[131,133,135,137],{"key":20,"text":132,"correct":22},"断续式水平支撑",{"key":24,"text":134,"correct":22},"连续式水平支撑",{"key":27,"text":136,"correct":32},"垂直支撑",{"key":30,"text":138,"correct":22},"井字支撑",{"id":140,"libraryId":5,"type":15,"typeLabel":16,"stem":141,"options":142,"answer":24,"analysis":33},1267707,"为降低检查井造价，缩小井盖尺寸，井筒直径一般比工作室小，但为了工人检修出人安全与方便，其直径不应小于（ ）。",[143,145,147,148],{"key":20,"text":144,"correct":22},"0.6m",{"key":24,"text":146,"correct":32},"0.7m",{"key":27,"text":87,"correct":22},{"key":30,"text":149,"correct":22},"0.9m",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":24,"analysis":33},1267708,"以下哪项既是企业编制施工组织设计的依据，又是企业编制施工作业计划的依据（ ）。",[154,155,156,157],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":32},{"key":27,"text":28,"correct":22},{"key":30,"text":31,"correct":22},{"id":159,"libraryId":5,"type":15,"typeLabel":16,"stem":160,"options":161,"answer":30,"analysis":33},1267709,"排水管渠遇到河流、山涧、洼地或地下构筑物等障碍物时，不能按原有的坡度埋设，而是应按下凹的折线方式从障碍物下通过，这种管道称为（ ）。",[162,164,166,168],{"key":20,"text":163,"correct":22},"沉淀管",{"key":24,"text":165,"correct":22},"转向管",{"key":27,"text":167,"correct":22},"引流管",{"key":30,"text":169,"correct":32},"倒虹管",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":24,"analysis":33},1267710,"改良沥青混合料生产温度应根据改良沥青品种、黏度、气候条件、铺装层的厚度确定，通常较普通沥青混合料的正常生产温度提高（ ）。",[174,176,178,180],{"key":20,"text":175,"correct":22},"5-10℃",{"key":24,"text":177,"correct":32},"10-20℃",{"key":27,"text":179,"correct":22},"20-25℃",{"key":30,"text":181,"correct":22},"25-30℃",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":30,"analysis":33},1267711,"小导管注浆时，适用于卵石地层的浆液是（ ）。",[186,188,190,192],{"key":20,"text":187,"correct":22},"石灰砂浆",{"key":24,"text":189,"correct":22},"改性水玻璃浆",{"key":27,"text":191,"correct":22},"水泥一水玻璃双液浆",{"key":30,"text":193,"correct":32},"水泥浆或水泥砂浆",{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":30,"analysis":33},1267712,"沉井用水枪冲土下沉，施工设备不包括（ ）。",[198,200,202,204],{"key":20,"text":199,"correct":22},"高压水泵",{"key":24,"text":201,"correct":22},"吸泥器",{"key":27,"text":203,"correct":22},"供水管路",{"key":30,"text":205,"correct":32},"多瓣抓斗",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":24,"analysis":33},1267713,"燃气管道穿越不通航河流河底时，根据水流冲刷条件确定管道至规划河底的覆土厚度不应小于（ ）。",[210,212,214,215],{"key":20,"text":211,"correct":22},"0.3m",{"key":24,"text":213,"correct":32},"0.5m",{"key":27,"text":87,"correct":22},{"key":30,"text":216,"correct":22},"1.0m",{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":27,"analysis":33},1267714,"关于给排水工程中圆井砌筑，下列表述错误的是（ ）。",[221,223,225,227],{"key":20,"text":222,"correct":22},"砌块应垂直砌筑，上下砌块应错缝砌筑",{"key":24,"text":224,"correct":22},"圆井砌筑时应同时安装踏步",{"key":27,"text":226,"correct":32},"砌块逐层砌筑收口时，偏心收口的每层收进不应大于30mm",{"key":30,"text":228,"correct":22},"内外井壁应采用水泥砂浆勾缝",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":24,"analysis":33},1267715,"已灌注混凝土强度水平施工缝处不应低于（ ）MPa，垂直施工缝处不应低于MPa，选项正确的是。",[233,235,237,239],{"key":20,"text":234,"correct":22},"1.2；2.0",{"key":24,"text":236,"correct":32},"1.2;2.5",{"key":27,"text":238,"correct":22},"1.5;2.0",{"key":30,"text":240,"correct":22},"1.5;2.5",{"id":242,"libraryId":5,"type":15,"typeLabel":16,"stem":243,"options":244,"answer":30,"analysis":33},1267716,"小导管注浆，浆液宜采用（ ）。",[245,246,248,250],{"key":20,"text":187,"correct":22},{"key":24,"text":247,"correct":22},"混合砂浆",{"key":27,"text":249,"correct":22},"环氧砂浆",{"key":30,"text":193,"correct":32},{"id":252,"libraryId":5,"type":15,"typeLabel":16,"stem":253,"options":254,"answer":20,"analysis":33},1267717,"水池施工中，橡胶止水带的接头方法是（ ）。",[255,257,259,261],{"key":20,"text":256,"correct":32},"热接",{"key":24,"text":258,"correct":22},"搭接",{"key":27,"text":260,"correct":22},"粘接",{"key":30,"text":262,"correct":22},"叠接",{"id":264,"libraryId":5,"type":15,"typeLabel":16,"stem":265,"options":266,"answer":24,"analysis":33},1267718,"分节制作沉井，设计无要求时，混凝土强度应达到设计强度等级（ ）%后，方可拆除模板或浇筑后一节混凝土。",[267,269,271,273],{"key":20,"text":268,"correct":22},"65",{"key":24,"text":270,"correct":32},"75",{"key":27,"text":272,"correct":22},"85",{"key":30,"text":274,"correct":22},"95",{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":30,"analysis":33},1267719,"垃圾填满场泥质防水层施工技术的核心是（ ）。",[279,281,283,285],{"key":20,"text":280,"correct":22},"选择防渗层的土源",{"key":24,"text":282,"correct":22},"现场摊铺、压实",{"key":27,"text":284,"correct":22},"选择抗渗配比",{"key":30,"text":286,"correct":32},"膨润土拌合土层施上",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":27,"analysis":33},1267720,"张拉台座应具有足够的（ ）和（ ），下列答案正确的是（ ）。",[291,293,295,297],{"key":20,"text":292,"correct":22},"韧度、刚度",{"key":24,"text":294,"correct":22},"韧度、强度",{"key":27,"text":296,"correct":32},"刚度、强度",{"key":30,"text":298,"correct":22},"抗度、强度",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":30,"analysis":33},1267721,"目前基坑围护结构类型可归为6类，SMW工法属于（ ）中的一种。",[303,305,307,309],{"key":20,"text":304,"correct":22},"柱列式W",{"key":24,"text":306,"correct":22},"自立式水泥土挡墙",{"key":27,"text":308,"correct":22},"板桩式",{"key":30,"text":310,"correct":32},"组合式",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":24,"analysis":33},1267722,"除设计有要求外，压力管道水压试验的管段长度不宜大于（ ）。",[315,317,319,321],{"key":20,"text":316,"correct":22},"0.5km",{"key":24,"text":318,"correct":32},"1.0km",{"key":27,"text":320,"correct":22},"1.5km",{"key":30,"text":322,"correct":22},"2.0km",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":24,"analysis":33},1267723,"刚性挡土墙静止不动，墙背土层未受任何干扰，此时，作用在墙上的水平压应力称为（ ）。",[327,329,331,333],{"key":20,"text":328,"correct":22},"水平土压力",{"key":24,"text":330,"correct":32},"静止土压力",{"key":27,"text":332,"correct":22},"主动土压力",{"key":30,"text":334,"correct":22},"被动土压力",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":24,"analysis":33},1267724,"按热力管网系统的形式来说，直接消耗一次热媒，中间设备极少，但一次热媒补充量大的是（ ）。",[339,341,343,345],{"key":20,"text":340,"correct":22},"闭式系统",{"key":24,"text":342,"correct":32},"开式系统",{"key":27,"text":344,"correct":22},"蒸汽系统盘",{"key":30,"text":346,"correct":22},"凝水系统",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":30,"analysis":33},1267725,"注浆施工应根据土质条件选择注浆法，在黏土层中宜采用（ ）。",[351,353,355,357],{"key":20,"text":352,"correct":22},"小导管注浆法",{"key":24,"text":354,"correct":22},"高压喷射注浆法",{"key":27,"text":356,"correct":22},"渗入注浆法",{"key":30,"text":358,"correct":32},"劈裂或电动硅化注浆法",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":30,"analysis":33},1267726,"下列有关钢筋骨架制作与组装的规定说法不正确的是（ ）。",[363,365,367,369],{"key":20,"text":364,"correct":22},"钢筋骨架的焊接应在坚固的工作台上进行",{"key":24,"text":366,"correct":22},"组装时应按设计的图纸放大样.放样时应考虑骨架预拱度",{"key":27,"text":368,"correct":22},"组装时应采取控制焊接局部变形措施",{"key":30,"text":370,"correct":32},"骨架接长焊接时.不同直径钢筋的中心线可以不在同一平面上",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":20,"analysis":33},1267727,"在起吊桥梁构件时，吊绳与构件夹角应大于（ ）。",[375,377,379,381],{"key":20,"text":376,"correct":32},"60°",{"key":24,"text":378,"correct":22},"75°",{"key":27,"text":380,"correct":22},"45°",{"key":30,"text":382,"correct":22},"30°",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":24,"analysis":33},1267728,"管道水压主试验阶段要停止注水补压稳定（ ）min后，压力下降不超过所允许压力下降数值时，将试压力降至工作压力并保持恒压30min。",[387,389,391,393],{"key":20,"text":388,"correct":22},"10",{"key":24,"text":390,"correct":32},"15",{"key":27,"text":392,"correct":22},"20",{"key":30,"text":394,"correct":22},"25",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":20,"analysis":33},1267729,"隧道围岩开挖施工中，决定盾构法隧道施工成败的关键是（ ）。",[399,401,403,405],{"key":20,"text":400,"correct":32},"选型盾构设备",{"key":24,"text":402,"correct":22},"查明地质条件",{"key":27,"text":404,"correct":22},"盾构的性能与质量",{"key":30,"text":406,"correct":22},"盾构的控制方法",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":20,"analysis":33},1267730,"适用于水深3m以内，水流流速1.5m\u002Fs以内，河床土质渗水较小时的围堰是（ ）。",[411,413,415,417],{"key":20,"text":412,"correct":32},"土袋围堰",{"key":24,"text":414,"correct":22},"钢板桩围堰",{"key":27,"text":416,"correct":22},"套箱围堰",{"key":30,"text":418,"correct":22},"钢筋混凝土板桩围堰",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":20,"analysis":33},1267731,"沉井下沉在终沉时，每（ ）小时测一次，严格控制超沉，沉井封底前自沉速率应小于10mm\u002F8h。",[423,425,427,429],{"key":20,"text":424,"correct":32},"1",{"key":24,"text":426,"correct":22},"2",{"key":27,"text":428,"correct":22},"3",{"key":30,"text":430,"correct":22},"4",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":20,"analysis":33},1267732,"在下列管理中，属于总包单位劳务管理基础的是（ ）。",[435,437,439,441],{"key":20,"text":436,"correct":32},"劳务实名制管理",{"key":24,"text":438,"correct":22},"劳务合同制管理",{"key":27,"text":440,"correct":22},"劳务安全教育培训管理",{"key":30,"text":442,"correct":22},"劳务人员现场考勤、标识管理",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":30,"analysis":33},1267733,"根据《地下铁道工程施工及验收规范》的有关规定，隧道采用钻爆法施工时，必须事先编制爆破方案，在实施前还需履行的程序是（ ）。",[447,449,451,453],{"key":20,"text":448,"correct":22},"报业主批准，并经城市主管部门同意",{"key":24,"text":450,"correct":22},"报监理批准，并经公安部门同意",{"key":27,"text":452,"correct":22},"报上级公司批准，并经城市主管部门同意",{"key":30,"text":454,"correct":32},"报城市主管部门批准，并经公安部门同意",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":30,"analysis":33},1267734,"以下对垃圾填埋场施工技术描述错误的是（ ）。",[459,461,463,465],{"key":20,"text":460,"correct":22},"掺加膨胀土的拌合土层是泥质防水层的技术核心",{"key":24,"text":462,"correct":22},"膨胀土的检测项目是掺加量和渗水试验",{"key":27,"text":464,"correct":22},"土工合成材料膨润土垫（GCL）施工必须在平整土地上进行",{"key":30,"text":466,"correct":32},"HDPE膜不得在夏季施工",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":27,"analysis":33},1267735,"（ ）是借助螺旋缠绕机，将PVC或PE等塑料制成的、带连锁边的加筋条带缠绕在旧管壁上形成一条连续的管状内衬层。",[471,473,475,477],{"key":20,"text":472,"correct":22},"内衬法",{"key":24,"text":474,"correct":22},"喷涂法",{"key":27,"text":476,"correct":32},"缠绕法",{"key":30,"text":478,"correct":22},"外衬法",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":24,"analysis":33},1267736,"锚具进行外观检查时，从每批锚具中抽取（ ），且不少于10套。",[483,485,487,489],{"key":20,"text":484,"correct":22},"5%",{"key":24,"text":486,"correct":32},"10%",{"key":27,"text":488,"correct":22},"15%",{"key":30,"text":490,"correct":22},"20%",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":20,"analysis":33},1267737,"土质路基的压实原则是（ ）。",[495,497,499,501],{"key":20,"text":496,"correct":32},"先轻后重、先静后振、先低后高、先慢后快，轮迹重叠",{"key":24,"text":498,"correct":22},"先重后轻、先静后振、先低后高、先慢后快，轮迹重叠",{"key":27,"text":500,"correct":22},"先轻后重、先静后振、先高后低、先慢后快，轮迹重叠",{"key":30,"text":502,"correct":22},"先轻后重、先静后振、先低后高、先快后慢，轮迹重叠",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":27,"analysis":33},1267738,"高压旋喷桩加固体的有效直径或范围应根据（ ）确定。",[507,509,511,513],{"key":20,"text":508,"correct":22},"理论数据",{"key":24,"text":510,"correct":22},"试验室数据",{"key":27,"text":512,"correct":32},"现场试验",{"key":30,"text":514,"correct":22},"环境条件",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":20,"analysis":33},1267739,"依靠墙体自重抵抗墙后土体侧向推力，目前城镇道路常用的挡土墙结构形式是（ ）。",[519,521,523,525],{"key":20,"text":520,"correct":32},"重力式挡土墙",{"key":24,"text":522,"correct":22},"衡重式挡土墙",{"key":27,"text":524,"correct":22},"悬臂式挡土墙",{"key":30,"text":526,"correct":22},"扶壁式挡土墙",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":30,"analysis":33},1267740,"小导管注浆施工应根据土质条件选择注浆法，在淤泥质软土层中宜采用（ ）。",[531,532,534,536],{"key":20,"text":356,"correct":22},{"key":24,"text":533,"correct":22},"劈裂注浆法",{"key":27,"text":535,"correct":22},"电动硅化注浆法",{"key":30,"text":354,"correct":32},{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":20,"analysis":33},1267741,"提出索赔时，要有正当的索赔理由，且有索赔事件发生时的。",[541,543,545,547],{"key":20,"text":542,"correct":32},"记录资料",{"key":24,"text":544,"correct":22},"现场照片",{"key":27,"text":546,"correct":22},"工期延误",{"key":30,"text":548,"correct":22},"有效证据",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":27,"analysis":33},1267742,"泥混凝土面层振捣密实工序中，振动器的振动顺序正确的是（ ）。",[553,555,557,559],{"key":20,"text":554,"correct":22},"插入式振捣器一振动梁一平板式振动器一无缝钢管滚杆提浆赶浆",{"key":24,"text":556,"correct":22},"振动梁一平板式振动器一插入式振捣器一无缝钢管滚杆提浆赶浆",{"key":27,"text":558,"correct":32},"插入式振捣器一平板式振动器一振动梁一无缝钢管滚杆提浆赶浆·",{"key":30,"text":560,"correct":22},"振动梁一插入式振捣器一平板式振动器一无缝钢管滚杆提浆赶浆",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":24,"analysis":33},1267743,"现浇混凝土墩台混凝土分层分段对称浇筑时，各段的浇筑应到距模板上缘（ ）mm处为止。",[565,567,569,571],{"key":20,"text":566,"correct":22},"50～100",{"key":24,"text":568,"correct":32},"100～150",{"key":27,"text":570,"correct":22},"150～200",{"key":30,"text":572,"correct":22},"0～50",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":20,"analysis":33},1267744,"下列建设维修项目中，不属于城市燃气工程的是（ ）。",[577,579,581,583],{"key":20,"text":578,"correct":32},"长输管线建设",{"key":24,"text":580,"correct":22},"汽车加气站建设",{"key":27,"text":582,"correct":22},"气源建设与维修",{"key":30,"text":584,"correct":22},"压缩天然气站维修",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":20,"analysis":33},1267745,"下列不属于竣工图基本要求的是（ ）。",[589,591,593,595],{"key":20,"text":590,"correct":32},"竣工测量应以工程施工中有效的测量控制网点为依据进行测量.控制点被破坏时，应在保证测细部点的精确度下进行恢复",{"key":24,"text":592,"correct":22},"市政公用工程竣工图应包括与施工（及设计变更）相对应的全部图纸及根据工程竣工情况需要补充的图纸",{"key":27,"text":594,"correct":22},"各专业竣工图应符合规范标准以及合同文件规定",{"key":30,"text":596,"correct":22},"竣工总图汇编完成后，应经原设计及施工单位技术负责人审核、会签",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":30,"analysis":33},1267746,"SMA沥青混合料面层施工时，不宜采用（ ）碾压。",[601,603,605,607],{"key":20,"text":602,"correct":22},"小型振动压路机",{"key":24,"text":604,"correct":22},"钢筒式压路机",{"key":27,"text":606,"correct":22},"振动压路机",{"key":30,"text":608,"correct":32},"轮胎压路机",[610,613,616,619,622,625],{"id":15,"name":611,"category":7,"favorite":612},"领导干部任职前廉政法规知识测试题",92,{"id":614,"name":615,"category":7,"favorite":15},595,"建筑结构与设备",{"id":617,"name":618,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":620,"name":621,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":623,"name":624,"category":7,"favorite":8},534,"BIM工程师",{"id":626,"name":624,"category":7,"favorite":8},535]