[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-855-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":609},{"id":5,"name":6,"category":7,"favorite":8},855,"(市政质量)基础知识","建筑工程",0,7,50,1355,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,381,393,405,417,426,438,450,462,474,486,498,510,521,533,544,556,568,579,590,599],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1267596,1,"单选题","石灰粉煤灰稳定砂砾施工工艺流程为（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","拌合、运输→摊铺与整形→碾压成型→养护",true,{"key":24,"text":25,"correct":26},"B","摊铺与整形→养护→拌合、运输→碾压成型",false,{"key":28,"text":29,"correct":26},"C","拌合、运输→碾压成型→摊铺与整形→养护",{"key":31,"text":32,"correct":26},"D","摊铺与整形→拌合、运输→碾压成型→养护","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1267597,"下列不属于现浇混凝土护壁的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":26},"等厚度护壁",{"key":24,"text":41,"correct":22},"不等厚度护壁",{"key":28,"text":43,"correct":26},"外齿式护壁",{"key":31,"text":45,"correct":26},"内齿式护壁",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1267598,"下列不属于路基基本类型的有（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"路基",{"key":24,"text":53,"correct":26},"路堑",{"key":28,"text":55,"correct":26},"半填半挖路基",{"key":31,"text":57,"correct":26},"不填不挖路基",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1267599,"由于（ ）很薄，一般不起提高强度作用，其主要作用是抵抗行车的磨耗、增强防水性、提高平整度以及改善路面的行车条件。",[62,64,66,68],{"key":20,"text":63,"correct":26},"乳化沥青层",{"key":24,"text":65,"correct":26},"沥青碎石层",{"key":28,"text":67,"correct":22},"沥青表面处治层",{"key":31,"text":69,"correct":26},"环氧沥青层",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1267600,"护筒埋设方法适于旱地或水中的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":26},"下埋式",{"key":24,"text":77,"correct":22},"上埋式",{"key":28,"text":79,"correct":26},"下沉式",{"key":31,"text":81,"correct":26},"上浮式",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1267601,"人工开挖沟槽的深度超过3.0m时，分层开挖的每层深度不宜超过（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"1.0m",{"key":24,"text":89,"correct":22},"2.0m",{"key":28,"text":91,"correct":26},"3.0m",{"key":31,"text":93,"correct":26},"5.0m",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1267602,"水泥粉煤灰碎石桩的施工工艺流程为（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"桩位测量→桩机就位→钻进成孔→混凝土浇筑→移机→检测→褥垫层施工",{"key":24,"text":101,"correct":26},"桩机就位→桩位测量→钻进成孔→混凝土浇筑→移机→检测→褥垫层施工",{"key":28,"text":103,"correct":26},"桩位测量→桩机就位→钻进成孔→移机→混凝土浇筑→检测→褥垫层施工",{"key":31,"text":105,"correct":26},"桩机就位→桩位测量→钻进成孔→移机→混凝土浇筑→检测→褥垫层施工",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},1267603,"城市道路直线度不宜设置过长，长直线上的纵坡一般应小于（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"1%",{"key":24,"text":113,"correct":26},"2%",{"key":28,"text":115,"correct":22},"3%",{"key":31,"text":117,"correct":26},"4%",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},1267604,"为了（ ），路面表面做成中间高两边低的拱形，称之为路拱。",[122,124,126,128],{"key":20,"text":123,"correct":26},"迅速排除路面上的尘土",{"key":24,"text":125,"correct":26},"降低路面噪声",{"key":28,"text":127,"correct":22},"迅速排除路面上的雨水",{"key":31,"text":129,"correct":26},"增强路面抗弯能力",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1267605,"真空预压的施工顺序一般为（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"设置竖向排水体→铺设排水垫层→埋设滤管→开挖边沟→铺膜、填沟、安装射流泵等→试抽→抽真空、预压",{"key":24,"text":137,"correct":26},"铺设排水垫层→设置竖向排水体→开挖边沟→埋设滤管→铺膜、填沟、安装射流泵等→试抽→抽真空、预压",{"key":28,"text":139,"correct":22},"铺设排水垫层→设置竖向排水体→埋设滤管→开挖边沟→铺膜、填沟、安装射流泵等→试抽→抽真空、预压",{"key":31,"text":141,"correct":26},"铺设排水垫层→设置竖向排水体→埋设滤管→开挖边沟→试抽→铺膜、填沟、安装射流泵等→抽真空、预压",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},1267606,"半刚性基层用水泥应符合国家技术标准的要求，初凝时间应大于（ ）h，终凝时间应在6h以上。",[146,148,150,152],{"key":20,"text":147,"correct":26},"2",{"key":24,"text":149,"correct":26},"3",{"key":28,"text":151,"correct":22},"4",{"key":31,"text":153,"correct":26},"5",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},1267607,"浆砌块石基础石料一般以（ ）为宜。",[158,160,162,164],{"key":20,"text":159,"correct":26},"石灰岩",{"key":24,"text":161,"correct":22},"花岗岩",{"key":28,"text":163,"correct":26},"页岩",{"key":31,"text":165,"correct":26},"玄武岩",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1267608,"下列不属于城镇道路组成部分的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"机动车道、人行道",{"key":24,"text":173,"correct":26},"分隔带、排水设施",{"key":28,"text":175,"correct":26},"交通设施、街面设施",{"key":31,"text":177,"correct":22},"横截沟、伸缩缝",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1267609,"对地基进行预先加载，使地基土加速固结的地基处理方法是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"堆载预压",{"key":24,"text":185,"correct":26},"真空预压",{"key":28,"text":187,"correct":26},"软土预压",{"key":31,"text":189,"correct":26},"真空-堆载联合预压",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},1267610,"某公司中标修建城市新建道路工程，全长5km，双向六车道，其结构从下至上为20cm厚12%石灰土底基层，38cm厚水泥稳定碎石基层，8cm厚粗粒式沥青混合料底面层，6cm厚中粒式沥青混合料中面层，4cm厚细粒式沥青混合料表面层。 该新建道路采用的路面属于（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":26},"刚性路面",{"key":24,"text":197,"correct":26},"半刚性路面",{"key":28,"text":199,"correct":22},"柔性路面",{"key":31,"text":201,"correct":26},"透水性路面",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},1267611,"道路基层应具有（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"较高的强度、稳定性和耐久性，且要求抗裂性和抗冲刷性好",{"key":24,"text":209,"correct":26},"较高的整体稳定性、稳定性和耐久性，且要求抗冰冻稳定性好",{"key":28,"text":211,"correct":26},"较高的刚度、水稳定性和耐久性，且要求要求抗裂性好",{"key":31,"text":213,"correct":26},"较高的整体稳定性、稳定性和耐久性，且要求抗冲刷性好",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},1267612,"位于面层之下，底基层或垫层之上，沥青路面结构层中的主要承重层是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":26},"面层",{"key":24,"text":221,"correct":22},"基层",{"key":28,"text":223,"correct":26},"底基层",{"key":31,"text":225,"correct":26},"垫层",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},1267613,"拱桥在竖向荷载作用下，构件受力以（ ）为主。",[230,232,234,236],{"key":20,"text":231,"correct":26},"受拉",{"key":24,"text":233,"correct":22},"受压",{"key":28,"text":235,"correct":26},"受剪",{"key":31,"text":237,"correct":26},"受弯",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},1267614,"验算模板、支架和拱架的抗倾覆稳定时，各施工阶段的稳定系数均不得小于（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":26},"1.0",{"key":24,"text":245,"correct":26},"1.2",{"key":28,"text":247,"correct":22},"1.3",{"key":31,"text":249,"correct":26},"1.5",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},1267615,"桥梁设计荷载采用永久、可变和偶然三种作用，（ ）属于桥梁设计中采用的偶然作用。",[254,256,258,260],{"key":20,"text":255,"correct":26},"混凝土收缩及徐变影响力",{"key":24,"text":257,"correct":22},"地震作用",{"key":28,"text":259,"correct":26},"汽车冲击力",{"key":31,"text":261,"correct":26},"流水压力",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},1267616,"移动模架施工工艺流程为（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"移动模架组装→移动模架预压→预压结果评价→模板调整→绑扎钢筋→浇筑混凝土→预应力张拉、压浆→移动模板架过孔",{"key":24,"text":269,"correct":26},"移动模架组装→模板调整→绑扎钢筋→移动模架预压→预压结果评价→浇筑混凝土→预应力张拉、压浆→移动模板架过孔",{"key":28,"text":271,"correct":26},"移动模架组装→绑扎钢筋→移动模架预压→预压结果评价→模板调整→浇筑混凝土→预应力张拉、压浆→移动模板架过孔",{"key":31,"text":273,"correct":26},"移动模架组装→模板调整→移动模架预压→预压结果评价→绑扎钢筋→浇筑混凝土→预应力张拉、压浆→移动模板架过孔",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":31,"analysis":33},1267617,"（ ）桥型不是按照跨越障碍物的性质来分类。",[278,280,282,284],{"key":20,"text":279,"correct":26},"跨河桥",{"key":24,"text":281,"correct":26},"高架桥",{"key":28,"text":283,"correct":26},"立交桥",{"key":31,"text":285,"correct":22},"悬索桥",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":20,"analysis":33},1267618,"悬索桥在竖向荷载作用下，主缆以受（ ）为主。",[290,292,294,296],{"key":20,"text":291,"correct":22},"拉",{"key":24,"text":293,"correct":26},"压",{"key":28,"text":295,"correct":26},"弯",{"key":31,"text":297,"correct":26},"剪",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},1267619,"在河岸或水中修筑墩台时，为防止河水由基坑顶面浸人基坑，需要修筑围堰，围堰占用过水的断面不应超过原河床流水断面的（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":26},"20%",{"key":24,"text":305,"correct":22},"30%",{"key":28,"text":307,"correct":26},"40",{"key":31,"text":309,"correct":26},"50%",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},1267620,"（ ）不是按照力学体系分类。",[314,316,318,320],{"key":20,"text":315,"correct":26},"梁式桥",{"key":24,"text":317,"correct":22},"预应力混凝土桥",{"key":28,"text":319,"correct":26},"拱式桥",{"key":31,"text":321,"correct":26},"刚架桥",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":24,"analysis":33},1267621,"混凝土强度、弹性模量符合设计要求是才能放松预应力筋。当日平均气温不低于20℃时，龄期不小于（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":26},"3d",{"key":24,"text":329,"correct":22},"5d",{"key":28,"text":331,"correct":26},"7d",{"key":31,"text":333,"correct":26},"28d",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":28,"analysis":33},1267622,"张拉设备的校准期不得超过半年，且不得超过（ ）次张拉作业。",[338,340,342,344],{"key":20,"text":339,"correct":26},"50",{"key":24,"text":341,"correct":26},"100",{"key":28,"text":343,"correct":22},"200",{"key":31,"text":345,"correct":26},"300",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":20,"analysis":33},1267623,"适用于地基承载力较低、台身较高、跨径较大的梁桥，应采用（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"埋置式桥台",{"key":24,"text":353,"correct":26},"轻型桥台",{"key":28,"text":355,"correct":26},"薄壁轻型桥台",{"key":31,"text":357,"correct":26},"支撑梁型桥台",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":28,"analysis":33},1267624,"装配式预应力混凝土简支箱型梁桥跨径要求是（ ）m。",[362,364,366,368],{"key":20,"text":363,"correct":26},"10~16",{"key":24,"text":365,"correct":26},"18~25",{"key":28,"text":367,"correct":22},"25~50",{"key":31,"text":369,"correct":26},"50~100",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},1267625,"后张法预应力施工中，当梁体混凝土的强度达到设计强度的（ ）以上时，方可进行穿束张拉。",[374,375,377,379],{"key":20,"text":309,"correct":26},{"key":24,"text":376,"correct":22},"75%",{"key":28,"text":378,"correct":26},"90%",{"key":31,"text":380,"correct":26},"100%",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":31,"analysis":33},1267626,"桥面伸缩缝施工工艺流程为（ ）。",[385,387,389,391],{"key":20,"text":386,"correct":26},"进场验收→测量放线→切缝→预留槽施工→清槽→安装就位→焊接固定→浇筑混凝土→养护",{"key":24,"text":388,"correct":26},"进场验收→测量放线→切缝→预留槽施工→清槽→焊接固定→安装就位→浇筑混凝土→养护",{"key":28,"text":390,"correct":26},"进场验收→预留槽施工→测量放线→切缝→清槽→焊接固定→安装就位→浇筑混凝土→养护",{"key":31,"text":392,"correct":22},"进场验收→预留槽施工→测量放线→切缝→清槽→安装就位→焊接固定→浇筑混凝土→养护",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":20,"analysis":33},1267627,"模板工程在（ ）的施工中非常重要，它是保证桥墩施工精度的基础，同时在施工过程中受力复杂多变，必须保证其有足够的强度和刚度。",[397,399,401,403],{"key":20,"text":398,"correct":22},"桥墩",{"key":24,"text":400,"correct":26},"桥梁",{"key":28,"text":402,"correct":26},"桥柱",{"key":31,"text":404,"correct":26},"桥面",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":24,"analysis":33},1267628,"在清孔排渣时，必须注意保持（ ），防止坍孔。",[409,411,413,415],{"key":20,"text":410,"correct":26},"孔口位置",{"key":24,"text":412,"correct":22},"孔内水头",{"key":28,"text":414,"correct":26},"孔壁高度",{"key":31,"text":416,"correct":26},"孔壁厚度",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":28,"analysis":33},1267629,"后张预应力构件孔道压浆强度应符合设计要求或不低于设计强度的（ ）。",[421,422,424,425],{"key":20,"text":309,"correct":26},{"key":24,"text":423,"correct":26},"65%",{"key":28,"text":376,"correct":22},{"key":31,"text":378,"correct":26},{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":28,"analysis":33},1267630,"由于沉井自重大，刃脚面尺寸较小，故铺砂垫层后，应在刃脚处对称地满铺（ ）。",[430,432,434,436],{"key":20,"text":431,"correct":26},"石块",{"key":24,"text":433,"correct":26},"砖块",{"key":28,"text":435,"correct":22},"枕木",{"key":31,"text":437,"correct":26},"混凝土块",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":24,"analysis":33},1267631,"沉井结构中起到防水、挡土和利用自重下沉作用的部分是（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":26},"隔墙",{"key":24,"text":445,"correct":22},"井壁",{"key":28,"text":447,"correct":26},"刃脚",{"key":31,"text":449,"correct":26},"井底",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":28,"analysis":33},1267632,"下列各项中，不属于架桥机的是（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":26},"单导梁",{"key":24,"text":457,"correct":26},"双导梁",{"key":28,"text":459,"correct":22},"多导梁",{"key":31,"text":461,"correct":26},"斜拉式",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},1267633,"同一孔桥跨结构相邻两支座（ ）之间的水平距离是计算跨径。",[466,468,470,472],{"key":20,"text":467,"correct":26},"外边线",{"key":24,"text":469,"correct":22},"中心",{"key":28,"text":471,"correct":26},"内边线",{"key":31,"text":473,"correct":26},"周长",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":28,"analysis":33},1267634,"下列不属于桥梁附属结构的是（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":26},"护坡",{"key":24,"text":481,"correct":26},"导流堤",{"key":28,"text":483,"correct":22},"桥台",{"key":31,"text":485,"correct":26},"挡土墙",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":31,"analysis":33},1267635,"钻孔灌注桩成桩方式中，不属于泥浆护壁成孔桩的是（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":26},"冲抓钻",{"key":24,"text":493,"correct":26},"冲击钻",{"key":28,"text":495,"correct":26},"旋挖钻",{"key":31,"text":497,"correct":22},"长螺旋钻",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":20,"analysis":33},1267636,"板式橡胶支座一般工艺流程主要包括（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":22},"支座垫石凿毛清理、测量放线、找平修补、环氧砂浆拌制、支座安装等",{"key":24,"text":505,"correct":26},"测量放线、支座垫石凿毛清理、环氧砂浆拌制、找平修补、支座安装等",{"key":28,"text":507,"correct":26},"支座垫石凿毛清理、测量放线、环氧砂浆拌制、找平修补、支座安装等",{"key":31,"text":509,"correct":26},"测量放线、支座垫石凿毛清理、找平修补、环氧砂浆拌制、支座安装等",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":28,"analysis":33},1267637,"（ ）不属于桥梁上部结构。",[514,516,518,519],{"key":20,"text":515,"correct":26},"混凝土梁",{"key":24,"text":517,"correct":26},"拱",{"key":28,"text":398,"correct":22},{"key":31,"text":520,"correct":26},"悬索",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":31,"analysis":33},1267638,"灌注水下混凝土过程中，每次拆除导管后应保持下端被埋置深度不得小于（ ）m。",[525,527,529,531],{"key":20,"text":526,"correct":26},"0.5",{"key":24,"text":528,"correct":26},"0.6",{"key":28,"text":530,"correct":26},"0.8",{"key":31,"text":532,"correct":22},"1",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":20,"analysis":33},1267639,"桥梁的分类可以按结构体系及其受力特点划分，承重结构主要是以抗弯能力来承受荷载的桥梁是（ ）。",[537,539,541,542],{"key":20,"text":538,"correct":22},"梁桥",{"key":24,"text":540,"correct":26},"拱桥",{"key":28,"text":285,"correct":26},{"key":31,"text":543,"correct":26},"斜拉桥",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":31,"analysis":33},1267640,"混凝土浇筑时一般采用分层或斜层浇筑，浇筑顺序为（ ）。",[548,550,552,554],{"key":20,"text":549,"correct":26},"先腹板、后底板、再顶板",{"key":24,"text":551,"correct":26},"先腹板、后顶板、再底板",{"key":28,"text":553,"correct":26},"先底板、后顶板、再腹板",{"key":31,"text":555,"correct":22},"先底板、后腹板、再顶板",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":24,"analysis":33},1267641,"预应力混凝土连续梁桥是（ ）结构。",[560,562,564,566],{"key":20,"text":561,"correct":26},"静定",{"key":24,"text":563,"correct":22},"超静定",{"key":28,"text":565,"correct":26},"简支",{"key":31,"text":567,"correct":26},"悬臂",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":24,"analysis":33},1267643,"梁的两端分别为铰支（固定）端与活动端的单跨梁式桥是（ ）。",[572,574,576,578],{"key":20,"text":573,"correct":26},"连续梁桥",{"key":24,"text":575,"correct":22},"简支梁桥",{"key":28,"text":577,"correct":26},"悬臂梁桥",{"key":31,"text":321,"correct":26},{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":24,"analysis":33},1267644,"下列不属于桥梁附属设施的是（ ）。",[583,584,586,588],{"key":20,"text":485,"correct":26},{"key":24,"text":585,"correct":22},"支座",{"key":28,"text":587,"correct":26},"护岸",{"key":31,"text":589,"correct":26},"河道护砌",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":28,"analysis":33},1267645,"非承重侧模板在混凝土强度能保证拆模时不损坏表面及棱角，一般以混凝土强度达到（ ）MPa为准。",[594,595,596,598],{"key":20,"text":249,"correct":26},{"key":24,"text":147,"correct":26},{"key":28,"text":597,"correct":22},"2.5",{"key":31,"text":149,"correct":26},{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":28,"analysis":33},1267646,"振捣泵送混凝土时，振动棒移动间距宜为（ ）mm左右，振捣时间宜为15~30S，且隔20~30min后进行第二次复振。",[603,604,605,607],{"key":20,"text":343,"correct":26},{"key":24,"text":345,"correct":26},{"key":28,"text":606,"correct":22},"400",{"key":31,"text":608,"correct":26},"500",[610,613,616,619,622,625],{"id":15,"name":611,"category":7,"favorite":612},"领导干部任职前廉政法规知识测试题",92,{"id":614,"name":615,"category":7,"favorite":15},595,"建筑结构与设备",{"id":617,"name":618,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":620,"name":621,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":623,"name":624,"category":7,"favorite":8},534,"BIM工程师",{"id":626,"name":624,"category":7,"favorite":8},535]