[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-855-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":617},{"id":5,"name":6,"category":7,"favorite":8},855,"(市政质量)基础知识","建筑工程",0,6,50,1355,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,309,321,333,345,357,369,381,393,405,417,429,441,453,465,477,489,501,513,525,537,549,561,573,585,597,609],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1267545,1,"单选题","DJ2型经纬仪半测回归零差限差为（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","6",false,{"key":24,"text":25,"correct":26},"B","8",true,{"key":28,"text":29,"correct":22},"C","12",{"key":31,"text":32,"correct":22},"D","18","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},1267546,"下列不属于顶管测量的内容有（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"设置顶管中线控制桩",{"key":24,"text":41,"correct":22},"设置临时水准点",{"key":28,"text":43,"correct":26},"边线测量",{"key":31,"text":45,"correct":22},"高程测量",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1267547,"三维直角坐标法一般用于（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"距离测定",{"key":24,"text":53,"correct":26},"位置测定",{"key":28,"text":55,"correct":22},"定位放样",{"key":31,"text":57,"correct":22},"角度测定",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1267548,"Y形桥墩结合了T形桥墩和双柱式墩的优点，（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"上部双柱式，下部单柱式",{"key":24,"text":65,"correct":22},"上部双柱式，下部双柱式",{"key":28,"text":67,"correct":22},"上部单柱式，下部单柱式",{"key":31,"text":69,"correct":22},"上部单柱式，下部双柱式",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1267549,"装配式预应力混凝土简支T形梁桥常用跨径为（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"20~30m",{"key":24,"text":77,"correct":26},"25~50m",{"key":28,"text":79,"correct":22},"15~50m",{"key":31,"text":81,"correct":22},"20~50m",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},1267550,"装配式预应力混凝土简支T形梁桥的主梁间距一般采用（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"1.5~3m",{"key":24,"text":89,"correct":22},"2.5~5m",{"key":28,"text":91,"correct":26},"1.8~2.5m",{"key":31,"text":93,"correct":22},"2~5m",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1267551,"主干路又称城市主干道，是城市中连接各主要分区的道路，以（ ）为主。",[98,100,102,104],{"key":20,"text":99,"correct":22},"服务功能",{"key":24,"text":101,"correct":26},"交通功能",{"key":28,"text":103,"correct":22},"疏散功能",{"key":31,"text":105,"correct":22},"汇聚功能",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},1267552,"湿软地基处理采用粉喷桩加固处治，为全面施工提供依据，加固土桩施工前须进行成桩试验，桩数（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"不少于3根",{"key":24,"text":113,"correct":22},"不多于3根",{"key":28,"text":115,"correct":26},"不少于5根",{"key":31,"text":117,"correct":22},"不多于5根",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1267553,"道路中心线在水平面的投影是平面线形，它一般由（ ）三个线形组成。",[122,124,126,128],{"key":20,"text":123,"correct":26},"直线、圆曲线、缓和曲线",{"key":24,"text":125,"correct":22},"异曲线、圆曲线、缓和曲线",{"key":28,"text":127,"correct":22},"直线、异曲线、缓和曲",{"key":31,"text":129,"correct":22},"直线、圆曲线、异曲线",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},1267554,"填石方路堤石料强度（饱和试件极限抗压强度）不应小于15MPa，石块最大径粒不得超过层厚的（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"1\u002F3",{"key":24,"text":137,"correct":22},"1\u002F2",{"key":28,"text":139,"correct":26},"2\u002F3",{"key":31,"text":141,"correct":22},"3\u002F4",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},1267555,"道路位于水、温度稳定性不良地带时路面结构应设置（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"刚性路面",{"key":24,"text":149,"correct":22},"柔性路面",{"key":28,"text":151,"correct":22},"底基层",{"key":31,"text":153,"correct":26},"垫层",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},1267556,"沥青混合料面层基本施工工艺流程为（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"洒布车撒布→洒布石屑→人工补撒→养护",{"key":24,"text":161,"correct":22},"洒布车撒布→养护→人工补撒→洒布石屑",{"key":28,"text":163,"correct":22},"洒布车撒布→洒布石屑→养护→人工补撒",{"key":31,"text":165,"correct":26},"洒布车撒布→人工补撒→洒布石屑→养护",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},1267557,"下列属于刚性路面的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"SMA沥青混合料路面",{"key":24,"text":173,"correct":22},"热拌沥青混合料路面",{"key":28,"text":175,"correct":22},"温拌沥青混合料路面",{"key":31,"text":177,"correct":26},"水泥混凝土路面",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},1267558,"砂石铺筑施工应按（ ）的顺序进行。",[182,184,186,188],{"key":20,"text":183,"correct":26},"先深后浅",{"key":24,"text":185,"correct":22},"先浅后深",{"key":28,"text":187,"correct":22},"先上后下",{"key":31,"text":189,"correct":22},"先下后上",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},1267559,"填土方路堤应优先选用级配较好的砾类土、砂类土等粗粒土作为填料，填料最大粒径应（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"大于100mm",{"key":24,"text":197,"correct":22},"小于100mm",{"key":28,"text":199,"correct":22},"大于150mm",{"key":31,"text":201,"correct":26},"小于150mm",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},1267560,"土钉支护基坑的施工工艺流程为（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"开挖工作面→铺设固定钢筋网→土钉施工→喷射混凝土面层",{"key":24,"text":209,"correct":22},"土钉施工→开挖工作面→铺设固定钢筋网→喷射混凝土面层",{"key":28,"text":211,"correct":22},"铺设固定钢筋网→开挖工作面→土钉施工→喷射混凝土面层",{"key":31,"text":213,"correct":26},"开挖工作面→土钉施工→铺设固定钢筋网→喷射混凝土面层",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},1267561,"级配砂砾基层施工工艺流程为（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":26},"拌合→运输→摊铺→碾压→养护",{"key":24,"text":221,"correct":22},"运输→拌合→碾压→摊铺→养护",{"key":28,"text":223,"correct":22},"拌合→运输→碾压→摊铺→养护",{"key":31,"text":225,"correct":22},"运输→拌合→摊铺→碾压→养护",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},1267562,"为抵消车辆在平曲线路段上行驶时所产生的离（向）心力，在该平曲线路段横断面上设置（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":26},"外侧高于内侧的单向横坡",{"key":24,"text":233,"correct":22},"内侧高于外侧的单向横坡",{"key":28,"text":235,"correct":22},"外侧高于内侧的双向横坡",{"key":31,"text":237,"correct":22},"内侧高于外侧的双向横坡",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},1267563,"联合式雨水口是平箅式与立式的综合形式，适用于（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"路面较窄、有缘石、径流量较分散且有杂物处",{"key":24,"text":245,"correct":22},"路面较窄、有缘石、径流量较集中且有杂物处",{"key":28,"text":247,"correct":22},"路面较宽、有缘石、径流量较分散且有杂物处",{"key":31,"text":249,"correct":26},"路面较宽、有缘石、径流量较集中且有杂物处",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},1267564,"沿道路中心线纵向垂直剖切的立面为纵断面，纵断面线形主要由（ ）组成。",[254,256,258,260],{"key":20,"text":255,"correct":22},"纵坡和平曲线",{"key":24,"text":257,"correct":22},"平曲线和竖曲线",{"key":28,"text":259,"correct":22},"横坡和纵坡",{"key":31,"text":261,"correct":26},"纵坡和竖曲线",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},1267565,"路面又称路面结构层，是承载于路基（土基）之上的多层结构，包括（ ）等。",[266,268,270,272],{"key":20,"text":267,"correct":26},"面层、基层和垫层",{"key":24,"text":269,"correct":22},"面层、基层",{"key":28,"text":271,"correct":22},"面层和垫层",{"key":31,"text":273,"correct":22},"面层和路基",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":28,"analysis":33},1267566,"立体交叉按交通功能与有无匝道连接上下层道路，分为（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"上跨式和下穿式",{"key":24,"text":281,"correct":22},"互通式和下穿式",{"key":28,"text":283,"correct":26},"互通式和分离式",{"key":31,"text":285,"correct":22},"上跨式和分离式",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},1267567,"锯齿形街沟通常用于道路（ ）的城市道路中。",[290,292,294,296],{"key":20,"text":291,"correct":22},"纵坡较大",{"key":24,"text":293,"correct":26},"纵坡较小",{"key":28,"text":295,"correct":22},"横坡较大",{"key":31,"text":297,"correct":22},"横坡较小",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":24,"analysis":33},1267568,"雨水口的间距宜为（ ），位置与雨水检查井的位置协调。",[302,304,305,307],{"key":20,"text":303,"correct":22},"5~30m",{"key":24,"text":77,"correct":26},{"key":28,"text":306,"correct":22},"35~70m",{"key":31,"text":308,"correct":22},"50~80m",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":24,"analysis":33},1267569,"为避免基底扰动，应保留（ ）mm厚土层不挖，人工清理。",[313,315,317,319],{"key":20,"text":314,"correct":22},"50～150",{"key":24,"text":316,"correct":26},"100～200",{"key":28,"text":318,"correct":22},"150～250",{"key":31,"text":320,"correct":22},"200～300",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":31,"analysis":33},1267571,"路拱横坡的基本形式有（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":22},"抛物线形、直线形、折线形",{"key":24,"text":328,"correct":22},"抛物线形、直线形、曲线直线组合形",{"key":28,"text":330,"correct":22},"直线形、曲线直线组合形、折线形",{"key":31,"text":332,"correct":26},"抛物线形、直线形、曲线直线组合形、折线形",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":28,"analysis":33},1267572,"雨水口分为（ ）两种形式。",[337,339,341,343],{"key":20,"text":338,"correct":22},"平箅式和立式",{"key":24,"text":340,"correct":22},"联合式和立式",{"key":28,"text":342,"correct":26},"落地式和不落地式",{"key":31,"text":344,"correct":22},"落地式和平箅式",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":28,"analysis":33},1267573,"塑料排水带应反复对折（ ）次不断裂才认为合格。",[349,351,353,355],{"key":20,"text":350,"correct":22},"2",{"key":24,"text":352,"correct":22},"3",{"key":28,"text":354,"correct":26},"5",{"key":31,"text":356,"correct":22},"10",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":24,"analysis":33},1267574,"当土质较差有严重流砂现象，可采用（ ）。",[361,363,365,367],{"key":20,"text":362,"correct":22},"明沟排水法",{"key":24,"text":364,"correct":26},"井点降水法",{"key":28,"text":366,"correct":22},"管井降水法",{"key":31,"text":368,"correct":22},"集水坑排水法",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":20,"analysis":33},1267575,"封闭泥浆的7d立方体抗压强度宜为（ ）。",[373,375,377,379],{"key":20,"text":374,"correct":26},"0.3～0.5MPa",{"key":24,"text":376,"correct":22},"0.5～0.8MPa",{"key":28,"text":378,"correct":22},"1.0～1.2MPa",{"key":31,"text":380,"correct":22},"1.2～1.5MPa",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":24,"analysis":33},1267576,"湿软地基处理中，适用于换填法一般适用于地表下0.5~3.0m之间的软土处治的方法为（ ）。",[385,387,389,391],{"key":20,"text":386,"correct":22},"垫层处治",{"key":24,"text":388,"correct":26},"换填处治",{"key":28,"text":390,"correct":22},"反护道压坡处治",{"key":31,"text":392,"correct":22},"排水固结法处治",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":31,"analysis":33},1267577,"下列不属于碎（砂）石桩法施工的是（ ）。",[397,399,401,403],{"key":20,"text":398,"correct":22},"振冲法施工",{"key":24,"text":400,"correct":22},"振动沉管法施工",{"key":28,"text":402,"correct":22},"锤击沉管法施工",{"key":31,"text":404,"correct":26},"水冲法施工",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":24,"analysis":33},1267578,"石灰土基层施工路拌法施工工艺流程（ ）。",[409,411,413,415],{"key":20,"text":410,"correct":22},"土料铺摊→整平、轻压→拌合→石灰铺摊→整形→碾压成型→养护",{"key":24,"text":412,"correct":26},"土料铺摊→整平、轻压→石灰铺摊→拌合→整形→碾压成型→养护",{"key":28,"text":414,"correct":22},"土料铺摊→整平、轻压→拌合→整形→石灰铺摊→碾压成型→养护",{"key":31,"text":416,"correct":22},"土料铺摊→石灰铺摊→整平、轻压→拌合→整形→碾压成型→养护",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":28,"analysis":33},1267579,"一般机械挖路堑施工工艺流程为（ ）。",[421,423,425,427],{"key":20,"text":422,"correct":22},"边坡施工→路床碾压→路堑开挖→质量检验",{"key":24,"text":424,"correct":22},"路堑开挖→路床碾压→边坡施工→质量检验",{"key":28,"text":426,"correct":26},"路堑开挖→边坡施工→路床碾压→质量检验",{"key":31,"text":428,"correct":22},"边坡施工→路堑开挖→路床碾压→质量检验",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":31,"analysis":33},1267580,"坚硬的高液限黏土无支护垂直坑壁基坑容许深度为（ ）m。",[433,435,437,439],{"key":20,"text":434,"correct":22},"1.00",{"key":24,"text":436,"correct":22},"1.25",{"key":28,"text":438,"correct":22},"1.50",{"key":31,"text":440,"correct":26},"2.00",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":31,"analysis":33},1267581,"湿软地基处理中，垫层处治方法有垫层法、（ ）等。",[445,447,449,451],{"key":20,"text":446,"correct":22},"混凝土垫层法、灰土垫层法",{"key":24,"text":448,"correct":22},"砂（砂砾）垫层法、水稳垫层法",{"key":28,"text":450,"correct":22},"沥青碎石垫层法、水稳垫层法",{"key":31,"text":452,"correct":26},"砂（砂砾）垫层法、灰土垫层法",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":28,"analysis":33},1267582,"深层搅拌法固化剂的主剂是（ ）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"混凝土",{"key":24,"text":460,"correct":22},"减水剂",{"key":28,"text":462,"correct":26},"水泥浆",{"key":31,"text":464,"correct":22},"粉煤灰",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":28,"analysis":33},1267583,"高压喷射注浆法施工工序为（ ）。",[469,471,473,475],{"key":20,"text":470,"correct":22},"机具就位→置入喷射管→钻孔→喷射注浆→拔管→冲洗",{"key":24,"text":472,"correct":22},"机具就位→钻孔→拔管→置入喷射管→喷射注浆→冲洗",{"key":28,"text":474,"correct":26},"机具就位→钻孔→置入喷射管→喷射注浆→拔管→冲洗",{"key":31,"text":476,"correct":22},"钻孔→机具就位→置入喷射管→喷射注浆→拔管→冲洗",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":24,"analysis":33},1267584,"柔性路面是指刚度较小、在车轮荷载作用下产生的（ ）。",[481,483,485,487],{"key":20,"text":482,"correct":22},"弯沉较小",{"key":24,"text":484,"correct":26},"弯沉较大",{"key":28,"text":486,"correct":22},"抗弯拉强度较高",{"key":31,"text":488,"correct":22},"刚度较大",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":20,"analysis":33},1267585,"湿软地基处理中，换填处治包括（ ）等。",[493,495,497,499],{"key":20,"text":494,"correct":26},"开挖换填法、抛石挤淤法",{"key":24,"text":496,"correct":22},"砂（砂砾）垫层法、抛石挤淤法",{"key":28,"text":498,"correct":22},"开挖换填法、袋装砂井法",{"key":31,"text":500,"correct":22},"砂（砂砾）垫层法、袋装砂井法",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":20,"analysis":33},1267586,"路堤基本填筑方案有（ ）几种。",[505,507,509,511],{"key":20,"text":506,"correct":26},"分层填筑法、竖向填筑法和混合填筑法",{"key":24,"text":508,"correct":22},"分层填筑法、竖向填筑法和整体填筑法",{"key":28,"text":510,"correct":22},"分层填筑法、混合填筑法和整体填筑法",{"key":31,"text":512,"correct":22},"混合填筑法、竖向填筑法和整体填筑法",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":20,"analysis":33},1267587,"具有截流冲人雨水的污秽垃圾和粗重物体作用的雨水口形式为（ ）。",[517,519,521,523],{"key":20,"text":518,"correct":26},"落地雨水口",{"key":24,"text":520,"correct":22},"不落地雨水口",{"key":28,"text":522,"correct":22},"平箅式雨水口",{"key":31,"text":524,"correct":22},"立式雨水口",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":24,"analysis":33},1267588,"路基必须满足的基本要求包括（ ），季节性冰冻地区还需要具有足够的冰冻稳定性。",[529,531,533,535],{"key":20,"text":530,"correct":22},"足够的刚度、足够的强度、足够的整体稳定性",{"key":24,"text":532,"correct":26},"足够的强度、足够的水稳定性、足够的整体稳定性",{"key":28,"text":534,"correct":22},"足够的强度、足够的水稳定性、足够的平整度",{"key":31,"text":536,"correct":22},"足够的刚度、足够的强度、足够的平整度",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":24,"analysis":33},1267589,"路堤填方施工工艺流程为（ ）。",[541,543,545,547],{"key":20,"text":542,"correct":22},"现场清理、填前碾压→碾压→填筑→质量检验",{"key":24,"text":544,"correct":26},"现场清理、填前碾压→填筑→碾压→质量检验",{"key":28,"text":546,"correct":22},"现场清理、填前碾压→碾压→质量检验→填筑",{"key":31,"text":548,"correct":22},"现场清理、填前碾压→质量检验→填筑→碾压",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":28,"analysis":33},1267590,"湿软地基处理中，排水固结法由（ ）两部分共同组成。",[553,555,557,559],{"key":20,"text":554,"correct":22},"排水系统和气压系统",{"key":24,"text":556,"correct":22},"气压系统和泥浆系统",{"key":28,"text":558,"correct":26},"排水系统和堆载加压系统",{"key":31,"text":560,"correct":22},"泥浆系统和堆载加压系统",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":24,"analysis":33},1267591,"（ ）是指相交道路在不同高度上的交叉。",[565,567,569,571],{"key":20,"text":566,"correct":22},"平面交叉",{"key":24,"text":568,"correct":26},"立体交叉",{"key":28,"text":570,"correct":22},"左右交叉",{"key":31,"text":572,"correct":22},"对向交叉",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":28,"analysis":33},1267592,"路缘石可分为（ ）两种。",[577,579,581,583],{"key":20,"text":578,"correct":22},"花岗石材质和混凝土材质",{"key":24,"text":580,"correct":22},"立缘石和侧石",{"key":28,"text":582,"correct":26},"立缘石和平缘石",{"key":31,"text":584,"correct":22},"立缘石和道牙",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":20,"analysis":33},1267593,"交叉口根据相交道路交汇时的标高情况，分为两类，即（ ）。",[589,591,593,595],{"key":20,"text":590,"correct":26},"平面交叉和立体交叉",{"key":24,"text":592,"correct":22},"左右交叉和立体交叉",{"key":28,"text":594,"correct":22},"平面交叉和左右交叉",{"key":31,"text":596,"correct":22},"对向交叉和立体交叉",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":28,"analysis":33},1267594,"城市道路通常采用（ ）将人行道、车行道布置在不同高度上，做到人车分流，防止互相干扰。",[601,603,605,607],{"key":20,"text":602,"correct":22},"侧石和平石",{"key":24,"text":604,"correct":22},"绿化带",{"key":28,"text":606,"correct":26},"侧石和绿化带",{"key":31,"text":608,"correct":22},"平石和交通标识",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":20,"analysis":33},1267595,"立体交叉按交叉道路相对位置与结构类型，分为（ ）的立体交叉。",[613,614,615,616],{"key":20,"text":279,"correct":26},{"key":24,"text":281,"correct":22},{"key":28,"text":283,"correct":22},{"key":31,"text":285,"correct":22},[618,621,624,627,630,633],{"id":15,"name":619,"category":7,"favorite":620},"领导干部任职前廉政法规知识测试题",92,{"id":622,"name":623,"category":7,"favorite":15},595,"建筑结构与设备",{"id":625,"name":626,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":628,"name":629,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":631,"name":632,"category":7,"favorite":8},534,"BIM工程师",{"id":634,"name":632,"category":7,"favorite":8},535]