[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-855-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":737},{"id":5,"name":6,"category":7,"favorite":8},855,"(市政质量)基础知识","建筑工程",0,20,50,1355,[13,38,53,68,82,97,111,126,141,155,170,184,198,211,226,240,254,268,282,296,311,325,340,355,369,384,398,413,427,441,456,470,484,498,511,525,539,554,568,582,597,611,625,639,653,667,681,695,709,723],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1268254,2,"多选题","焊接接口适用于（ ）。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","混凝土管",false,{"key":24,"text":25,"correct":26},"B","钢管",true,{"key":28,"text":29,"correct":22},"C","球墨铸铁管",{"key":31,"text":32,"correct":26},"D","化学建材管",{"key":34,"text":35,"correct":22},"E","预应力混凝土管","BD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1268255,"下列补偿器中，属于利用材料的变形来吸收热伸长的是（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"套管补偿器",{"key":24,"text":45,"correct":26},"自然补偿器",{"key":28,"text":47,"correct":26},"方形补偿器",{"key":31,"text":49,"correct":26},"波纹管补偿器",{"key":34,"text":51,"correct":22},"球形补偿器","BCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1268256,"水泥砂浆内防腐层采用的施工工艺有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"机械喷涂",{"key":24,"text":60,"correct":26},"人工抹压",{"key":28,"text":62,"correct":22},"高压无气喷涂工艺",{"key":31,"text":64,"correct":26},"拖筒",{"key":34,"text":66,"correct":26},"离心预制法","ABDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":52,"analysis":37},1268257,"对于单跨隧道浅埋暗挖方法，当开挖宽12~16m时，应选择（ ）。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"台阶开挖法",{"key":24,"text":75,"correct":26},"CD法",{"key":28,"text":77,"correct":26},"CRD法",{"key":31,"text":79,"correct":26},"PBA法",{"key":34,"text":81,"correct":22},"双侧壁导坑法",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1268258,"关于柔性路面和刚性路面，下列说法正确的是（ ）。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"柔性路面在荷载作用下产生的弯沉变形较大，路面结构抗拉强度较高",{"key":24,"text":89,"correct":22},"刚性路面在车轮荷载作用下垂直变形较小",{"key":28,"text":91,"correct":26},"刚性路面在车轮荷载作用下垂直变形极小",{"key":31,"text":93,"correct":26},"传递到刚性路面地基上的单位压力要较柔性路面小的多",{"key":34,"text":95,"correct":22},"传递到刚性路面地基上的单位压力要较柔性路面大的多","CD",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":52,"analysis":37},1268259,"复合式衬砌结构由以下哪些构成（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"开挖",{"key":24,"text":104,"correct":26},"初期支护",{"key":28,"text":106,"correct":26},"防水层",{"key":31,"text":108,"correct":26},"二次衬砌",{"key":34,"text":110,"correct":22},"锚喷衬砌",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":125,"analysis":37},1268260,"地铁正线及辅助线钢轨宜采用钢轨的规格为（ ）。",[115,117,119,121,123],{"key":20,"text":116,"correct":22},"35Kg\u002Fm",{"key":24,"text":118,"correct":22},"40Kg\u002Fm",{"key":28,"text":120,"correct":26},"50Kg\u002Fm",{"key":31,"text":122,"correct":22},"55Kg\u002Fm",{"key":34,"text":124,"correct":26},"60Kg\u002Fm","CE",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},1268261,"排水工程管道系统可分为雨水系统和污水系统。雨水系统的组成主要有（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":26},"管道系统",{"key":24,"text":133,"correct":22},"检查井",{"key":28,"text":135,"correct":26},"排洪沟",{"key":31,"text":137,"correct":26},"雨水泵站",{"key":34,"text":139,"correct":26},"出水口","ACDE",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":52,"analysis":37},1268262,"下列有关道路断面形式的说法正确的是：（ ）。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"单幅路适用于分流向，机、非混合行驶",{"key":24,"text":148,"correct":26},"三幅路适用于机动车与非机动车分道行驶",{"key":28,"text":150,"correct":26},"双幅路适用于机动车交通量大，非机动车交通量较少的主干路、次干路",{"key":31,"text":152,"correct":26},"单幅路适用于交通量不大的次干路和支路",{"key":34,"text":154,"correct":22},"四幅路适用于机动车交通量大，非机动车交通量较少的快速路、次干路",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":169,"analysis":37},1268263,"桥梁桩基础按成桩方法可分为（ ）。",[159,161,163,165,167],{"key":20,"text":160,"correct":26},"沉入桩",{"key":24,"text":162,"correct":22},"灌注桩基础",{"key":28,"text":164,"correct":26},"钻孔灌注桩",{"key":31,"text":166,"correct":26},"人工挖孔桩",{"key":34,"text":168,"correct":22},"沉入桩基础","ACD",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":67,"analysis":37},1268264,"全站仪上半部分包含有测量的4大光电系统，即（ ）。",[174,176,178,180,182],{"key":20,"text":175,"correct":26},"水平角测量系统",{"key":24,"text":177,"correct":26},"竖直角测量系统",{"key":28,"text":179,"correct":22},"垂直补偿系统",{"key":31,"text":181,"correct":26},"水平补偿系统",{"key":34,"text":183,"correct":26},"测距系统",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":169,"analysis":37},1268265,"水准仪主要由（ ）组成。",[188,190,192,194,196],{"key":20,"text":189,"correct":26},"望远镜",{"key":24,"text":191,"correct":22},"水准尺",{"key":28,"text":193,"correct":26},"水准器",{"key":31,"text":195,"correct":26},"基座",{"key":34,"text":197,"correct":22},"尺垫",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":210,"analysis":37},1268266,"光学经纬仪主要由（ ）等构成。",[202,204,206,207,209],{"key":20,"text":203,"correct":26},"照准部分",{"key":24,"text":205,"correct":26},"水平度盘",{"key":28,"text":193,"correct":22},{"key":31,"text":208,"correct":22},"度盘离合器",{"key":34,"text":195,"correct":26},"ABE",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":225,"analysis":37},1268267,"采用全站仪三维坐标放样法时，首先输入测站数据，测站数据包括（ ）。",[215,217,219,221,223],{"key":20,"text":216,"correct":26},"测站点坐标",{"key":24,"text":218,"correct":26},"仪器高",{"key":28,"text":220,"correct":26},"目标高",{"key":31,"text":222,"correct":26},"后视点坐标",{"key":34,"text":224,"correct":22},"前视点坐标","ABCD",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":140,"analysis":37},1268268,"城市道路网布局形式主要分为（ ）形式。",[230,232,234,236,238],{"key":20,"text":231,"correct":26},"方格网状",{"key":24,"text":233,"correct":22},"方格发射状",{"key":28,"text":235,"correct":26},"环形放射状",{"key":31,"text":237,"correct":26},"自由式",{"key":34,"text":239,"correct":26},"混合式",{"id":241,"libraryId":5,"type":15,"typeLabel":16,"stem":242,"options":243,"answer":225,"analysis":37},1268269,"路堑土质路基开挖中纵挖法分为（ ）。",[244,246,248,250,252],{"key":20,"text":245,"correct":26},"分层纵挖法",{"key":24,"text":247,"correct":26},"通道纵挖",{"key":28,"text":249,"correct":26},"混合式开挖法",{"key":31,"text":251,"correct":26},"分段纵挖法",{"key":34,"text":253,"correct":22},"整体纵挖法",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":67,"analysis":37},1268270,"城镇道路与公路比较，具有（ ）等特点。",[258,260,262,264,266],{"key":20,"text":259,"correct":26},"功能多样、组成复杂，车辆多、类型混杂、车速差异大",{"key":24,"text":261,"correct":26},"道路交叉口多、易发生交通阻滞和交通事故，城镇道路需要大量附属设施和交通管理设施",{"key":28,"text":263,"correct":22},"区域长距离交通流服务，交通构成比较复杂，多为重载交通",{"key":31,"text":265,"correct":26},"行人交通量大，交通吸引点多，使得车辆和行人交通错综复杂，非机动车相互干涉严重",{"key":34,"text":267,"correct":26},"城镇道路规划、设计应满足城市建设管理的需求，城镇道路规划、设计和施工的影响因素多",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":52,"analysis":37},1268271,"道路工程施工中，影响路基压实的主要因素有（ ）。",[272,274,276,278,280],{"key":20,"text":273,"correct":22},"孔隙率",{"key":24,"text":275,"correct":26},"含水量",{"key":28,"text":277,"correct":26},"土质",{"key":31,"text":279,"correct":26},"压实功能",{"key":34,"text":281,"correct":22},"机械重量",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":225,"analysis":37},1268272,"城市道路按其在道路系统中的地位、交通功能及服务功能规定我国城市道路划分为（ ）。",[286,288,290,292,294],{"key":20,"text":287,"correct":26},"快速路",{"key":24,"text":289,"correct":26},"主干路",{"key":28,"text":291,"correct":26},"次干路",{"key":31,"text":293,"correct":26},"支路",{"key":34,"text":295,"correct":22},"景观路",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":310,"analysis":37},1268273,"下列关于石灰土基层施工中有误的是（ ）。",[300,302,304,306,308],{"key":20,"text":301,"correct":26},"路拌法采用塑性指数小的黏土时，第一次加70%～100%预定剂量的石灰进行拌合，闷放1～2d，此后补足需用的石灰，再进行第二次拌合",{"key":24,"text":303,"correct":26},"路拌法碾压应在最佳含水量时进行，先12t压路机稳压，整形后一般采用8t以上压路机碾压",{"key":28,"text":305,"correct":22},"路拌法施工间断或分段施工时，交界处预留300～500mm不碾压，便于新旧料衔接",{"key":31,"text":307,"correct":26},"厂拌法石灰土铺摊长度约100m时宜在最佳含水量时进行碾压，试碾压后及时进行高程复核",{"key":34,"text":309,"correct":22},"厂拌法碾压原则上以“先慢后快”、“先轻后重”、“先低后高”为宜","ABD",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":140,"analysis":37},1268274,"填土采用同类土分层进行，一般方法有（ ）。",[315,317,319,321,323],{"key":20,"text":316,"correct":26},"人工填土",{"key":24,"text":318,"correct":22},"混凝土车填土",{"key":28,"text":320,"correct":26},"推土机填土",{"key":31,"text":322,"correct":26},"铲运机铺填土",{"key":34,"text":324,"correct":26},"自卸汽车填土",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":339,"analysis":37},1268275,"下列关于砂石铺筑垫层施工说法错误的是（ ）。",[329,331,333,335,337],{"key":20,"text":330,"correct":26},"砂石铺筑分层、分段进行，每层厚度，一般为15～20cm，最大不超过50cm",{"key":24,"text":332,"correct":22},"分段施工时，接搓处应做成斜坡，每层接搓处的水平距离应错开0.5～1.0m，并应充分压（夯）实",{"key":28,"text":334,"correct":26},"采用压路机往复碾压，一般碾压不少于2遍，其轮距搭接不少于50cm",{"key":31,"text":336,"correct":22},"边缘和转角处应用人工或蛙式打夯机补夯密实",{"key":34,"text":338,"correct":22},"石灰稳定粒料类垫层与水泥稳定粒料类垫层都适用于城市道路温度和湿度状况不良的环境下","AC",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":354,"analysis":37},1268276,"下列关于属于热拌沥青混合料面层施工前准备的是（ ）。",[344,346,348,350,352],{"key":20,"text":345,"correct":26},"施工前应对各种材料调查试验，经选择确定的材料在施工过程中应保持稳定，不得随意变更",{"key":24,"text":347,"correct":26},"做好配合比设计报送有关方面审批，对各种原材料进行符合性检验",{"key":28,"text":349,"correct":26},"施工前对各种施工机具应作全面检查，应经调试并使其处于良好的性能状态",{"key":31,"text":351,"correct":22},"城市快速路、主干路宜采用两台以上摊铺机联合摊铺",{"key":34,"text":353,"correct":26},"铺筑沥青层前，应检查基层或下卧沥青层的质量，不符要求的不得铺筑沥青混合料","ABCE",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":310,"analysis":37},1268277,"下列关于石灰粉煤灰稳定砂砾基层施工的说法中，表述正确的是（ ）。",[359,361,363,365,367],{"key":20,"text":360,"correct":26},"运输中一般采用有覆盖装置的车辆，做好防止水分蒸发和防扬尘措施",{"key":24,"text":362,"correct":26},"推土机按照虚铺厚度、控制高程点进行摊平料堆，人工拉线配合找平",{"key":28,"text":364,"correct":22},"应采用摊铺机进行下基层作业，以取得较好的平整度",{"key":31,"text":366,"correct":26},"碾压时应采用先轻型后重型压路机组合",{"key":34,"text":368,"correct":22},"混合料的养护采用湿养，始终保持表面潮湿，养护期为28d",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":383,"analysis":37},1268278,"城市道路设计圆曲线上的技术代号一般有（ ）。",[373,375,377,379,381],{"key":20,"text":374,"correct":22},"转点",{"key":24,"text":376,"correct":26},"交点",{"key":28,"text":378,"correct":26},"直圆",{"key":31,"text":380,"correct":26},"曲中",{"key":34,"text":382,"correct":26},"圆直","BCDE",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":310,"analysis":37},1268279,"下列关于水泥稳定土和级配砂砾基层施工的说法中，表述正确的是（ ）。",[388,390,392,394,396],{"key":20,"text":389,"correct":26},"应用摊铺机进行，摊铺应均匀，松铺系数一般取1.3～1.5",{"key":24,"text":391,"correct":26},"摊铺混合料不宜中断，如因故较长时间中断，应设置横向接缝",{"key":28,"text":393,"correct":22},"城镇快速路和主干路的基层宜采用单台摊铺机整幅摊铺、碾压，步距5～8m",{"key":31,"text":395,"correct":26},"压路机的碾压速度，初压以1.5～1.7km\u002Fh为宜，复压、中压以2.0～2.5km\u002Fh为宜",{"key":34,"text":397,"correct":22},"两轮压路机每次重叠1\u002F2轮宽，三轮压路机每次重叠后轮宽度的1\u002F3",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":412,"analysis":37},1268280,"下列属于柔性路面的是（ ）路面。",[402,404,406,408,410],{"key":20,"text":403,"correct":22},"石灰稳定土",{"key":24,"text":405,"correct":26},"热拌沥青混合料",{"key":28,"text":407,"correct":22},"水泥稳定碎石",{"key":31,"text":409,"correct":22},"水泥混凝土",{"key":34,"text":411,"correct":26},"沥青碎石","BE",{"id":414,"libraryId":5,"type":15,"typeLabel":16,"stem":415,"options":416,"answer":67,"analysis":37},1268281,"城市道路设计圆曲线的几何要素一般有（ ）。",[417,419,421,423,425],{"key":20,"text":418,"correct":26},"切线长",{"key":24,"text":420,"correct":26},"曲线长",{"key":28,"text":422,"correct":22},"圆曲线半径",{"key":31,"text":424,"correct":26},"外距值",{"key":34,"text":426,"correct":26},"校正值",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":225,"analysis":37},1268282,"城市道路工程施工中，常用湿软地基处理方法有（ ）。",[431,433,435,437,439],{"key":20,"text":432,"correct":26},"垫层处治",{"key":24,"text":434,"correct":26},"土工合成材料处治",{"key":28,"text":436,"correct":26},"换填处治",{"key":31,"text":438,"correct":26},"加固土桩处治",{"key":34,"text":440,"correct":22},"重载碾压处治",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":455,"analysis":37},1268283,"预制桩接桩方法有（ ）。",[445,447,449,451,453],{"key":20,"text":446,"correct":22},"护筒连接",{"key":24,"text":448,"correct":22},"钢筋连接",{"key":28,"text":450,"correct":26},"法兰盘连接",{"key":31,"text":452,"correct":26},"钢板连接",{"key":34,"text":454,"correct":26},"硫黄砂浆连接","CDE",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":210,"analysis":37},1268284,"关于支架法现浇预应力混凝土箱梁施工要求的说法中正确的是（ ）。",[460,462,464,466,468],{"key":20,"text":461,"correct":26},"混凝土采用一次浇筑时，在底、腹板钢筋及预应力管道完成后，安装内膜，再绑扎顶板钢筋及预应力管道",{"key":24,"text":463,"correct":26},"孔道压浆完成后，应将锚具周围冲洗干净并凿毛，设置钢筋网，浇筑封锚混凝土",{"key":28,"text":465,"correct":22},"一般应在混凝土抗压强度达到3.6MPa方可拆除侧模",{"key":31,"text":467,"correct":22},"非承重侧模应在混凝土强度达到设计要求方可拆除",{"key":34,"text":469,"correct":26},"预应力混凝土结构构件模板的拆除，侧模应在预应力张拉前拆除，底模应在结构构件建立预应力后方可拆除",{"id":471,"libraryId":5,"type":15,"typeLabel":16,"stem":472,"options":473,"answer":140,"analysis":37},1268285,"空心桥墩的优点有（ ）。",[474,476,478,480,482],{"key":20,"text":475,"correct":26},"减少圬工体积",{"key":24,"text":477,"correct":22},"提高强度",{"key":28,"text":479,"correct":26},"节约材料",{"key":31,"text":481,"correct":26},"减轻自重",{"key":34,"text":483,"correct":26},"减少地基负荷",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":67,"analysis":37},1268286,"下列属于梁桥桥面系的有（ ）。",[488,490,492,494,496],{"key":20,"text":489,"correct":26},"桥面铺装",{"key":24,"text":491,"correct":26},"排水系统",{"key":28,"text":493,"correct":22},"支座",{"key":31,"text":495,"correct":26},"伸缩缝",{"key":34,"text":497,"correct":26},"栏杆",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":67,"analysis":37},1268287,"桥梁一般由（ ）组成。",[502,504,505,507,509],{"key":20,"text":503,"correct":26},"上部结构",{"key":24,"text":493,"correct":26},{"key":28,"text":506,"correct":22},"中部结构",{"key":31,"text":508,"correct":26},"下部结构",{"key":34,"text":510,"correct":26},"基础和附属结构",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":210,"analysis":37},1268288,"下列各项中，桥梁下部结构施工说法正确的是（ ）。",[515,517,519,521,523],{"key":20,"text":516,"correct":26},"石砌墩台应分段分层砌筑，两相邻工作段的砌筑高差不超过1.2m",{"key":24,"text":518,"correct":26},"石砌墩台上层石块应在下层石块上铺满砂浆后砌筑",{"key":28,"text":520,"correct":22},"钢筋混凝土墩台混凝土宜水平分层浇筑，逐层振捣密实，控制混凝土下落高度，防止混凝土拌合料离析",{"key":31,"text":522,"correct":22},"大体积墩台混凝土应合理分块进行浇筑，每块面积不宜小于100㎡，高度不宜超过5m",{"key":34,"text":524,"correct":26},"墩台帽（盖梁）支架一般采用满堂式扣件钢管支架",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":52,"analysis":37},1268289,"下列关于先张法和后张法预应力筋张拉的说法中正确的是（ ）。",[529,531,533,535,537],{"key":20,"text":530,"correct":22},"先张法预应力张拉时，应先调整到初应力，初应力宜为张拉控制应力（σcon）的10%～15%，伸长值应量测最终应力",{"key":24,"text":532,"correct":26},"同时张拉多根预应力筋时，应预先调整其初应力，使相互之间的应力一致，在正式分级整体张拉到控制应力",{"key":28,"text":534,"correct":26},"锚固完毕后并经检验合格后，即可切割端头多余的预应力筋。切割宜采用砂轮机，严禁使用电弧焊切割",{"key":31,"text":536,"correct":26},"张拉过程中，应使活动横梁与固定横梁始终保持平行，并应抽查预应力值，其偏差的绝对值不得超过按一个构件全部力筋预应力总值的5%",{"key":34,"text":538,"correct":22},"后张法预应力筋锚固后的外露长度不宜小于10cm，锚具应采用封端混凝土保护",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":553,"analysis":37},1268290,"常用的清孔方法有（ ）。",[543,545,547,549,551],{"key":20,"text":544,"correct":26},"抽浆法",{"key":24,"text":546,"correct":22},"底拖法",{"key":28,"text":548,"correct":26},"换浆法",{"key":31,"text":550,"correct":22},"浮运法",{"key":34,"text":552,"correct":26},"掏渣法","ACE",{"id":555,"libraryId":5,"type":15,"typeLabel":16,"stem":556,"options":557,"answer":36,"analysis":37},1268291,"模板、支架和拱架拆除应按设计要求的程序和措施进行，遵循（ ）的原则。",[558,560,562,564,566],{"key":20,"text":559,"correct":22},"先支先拆",{"key":24,"text":561,"correct":26},"先支后拆",{"key":28,"text":563,"correct":22},"后支后拆",{"key":31,"text":565,"correct":26},"后支先拆",{"key":34,"text":567,"correct":22},"边支边拆",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":553,"analysis":37},1268292,"下列关于桥面系施工的说法中，表述正确的是（ ）。",[572,574,576,578,580],{"key":20,"text":573,"correct":26},"基面应坚实平整粗糙，不得有尖硬接茬、空鼓、开裂、起砂和脱皮等缺陷",{"key":24,"text":575,"correct":22},"基层混凝土强度应达到设计强度并符合设计要求，含水率不得大于15%",{"key":28,"text":577,"correct":26},"桥面涂层防水施工采用涂刷发、刮涂法或喷涂法施工",{"key":31,"text":579,"correct":22},"涂刷应现进行大面积涂刷，后做转角处、变形缝部位",{"key":34,"text":581,"correct":26},"切缝过程中，要保护好切缝外侧沥青混凝土边角，防止污染破损",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":596,"analysis":37},1268293,"下列关于桥梁围堰施工方法的是（ ）。",[586,588,590,592,594],{"key":20,"text":587,"correct":26},"土围堰",{"key":24,"text":589,"correct":26},"土袋围堰",{"key":28,"text":591,"correct":26},"间隔有桩围堰",{"key":31,"text":593,"correct":26},"钢板桩围堰",{"key":34,"text":595,"correct":26},"套箱围堰","ABCDE",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":553,"analysis":37},1268294,"钢筋混凝土梁桥按承重结构的横截面形式可分为（ ）。",[601,603,605,607,609],{"key":20,"text":602,"correct":26},"板桥",{"key":24,"text":604,"correct":22},"悬臂梁桥",{"key":28,"text":606,"correct":26},"肋梁桥",{"key":31,"text":608,"correct":22},"预制装配式梁桥",{"key":34,"text":610,"correct":26},"箱形梁桥",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":624,"analysis":37},1268295,"钢筋混凝土梁桥按承重结构的静力体系分类有（ ）。",[615,617,619,621,622],{"key":20,"text":616,"correct":22},"预应力混凝土桥",{"key":24,"text":618,"correct":26},"简支梁桥",{"key":28,"text":620,"correct":22},"整体浇筑式梁桥",{"key":31,"text":604,"correct":26},{"key":34,"text":623,"correct":26},"连续梁桥","BDE",{"id":626,"libraryId":5,"type":15,"typeLabel":16,"stem":627,"options":628,"answer":354,"analysis":37},1268296,"下列属于移动模架主要施工要点的是（ ）。",[629,631,633,635,637],{"key":20,"text":630,"correct":26},"支架长度必须满足施工要求",{"key":24,"text":632,"correct":26},"支架应利用专用设备组装，在施工时能确保质量和安全",{"key":28,"text":634,"correct":26},"浇筑分段工作缝，必须设在弯矩零点附近",{"key":31,"text":636,"correct":22},"最后浇筑中跨合龙段形成连续梁体系",{"key":34,"text":638,"correct":26},"混凝土内预应力筋管道、钢筋、预埋件设置应符合规范规定和设计要求",{"id":640,"libraryId":5,"type":15,"typeLabel":16,"stem":641,"options":642,"answer":169,"analysis":37},1268297,"板式橡胶支座包括（ ）。",[643,645,647,649,651],{"key":20,"text":644,"correct":26},"滑板式支座",{"key":24,"text":646,"correct":22},"螺旋锚固板式橡胶支座",{"key":28,"text":648,"correct":26},"四氟板支座",{"key":31,"text":650,"correct":26},"坡型板式橡胶支座",{"key":34,"text":652,"correct":22},"球形板支座",{"id":654,"libraryId":5,"type":15,"typeLabel":16,"stem":655,"options":656,"answer":225,"analysis":37},1268298,"模板、拱架和支架的设计应符合国家现行标准（ ）的有关规定。",[657,659,661,663,665],{"key":20,"text":658,"correct":26},"《钢结构设计规范》GB50017-2003",{"key":24,"text":660,"correct":26},"《木结构设计规范》GB50005-2003",{"key":28,"text":662,"correct":26},"《组合钢模板技术规范》GB50214-2001",{"key":31,"text":664,"correct":26},"《公路桥涵钢结构及木结构设计规范》JTJ025-2000",{"key":34,"text":666,"correct":22},"《混凝土结构工程施工规范》GB506666-2011",{"id":668,"libraryId":5,"type":15,"typeLabel":16,"stem":669,"options":670,"answer":339,"analysis":37},1268299,"下列各项关于常用排水管渠材料的论述中，正确的有（ ）。",[671,673,675,677,679],{"key":20,"text":672,"correct":26},"当管道埋深较大或敷设在土质条件不良地段，管径大于400mm时，通常都采用钢筋混凝土管",{"key":24,"text":674,"correct":22},"混凝土管和钢筋混凝土管抗酸、碱侵蚀及抗渗性能较好、管节长、接头多、施工",{"key":28,"text":676,"correct":26},"陶土管耐酸抗腐蚀性好，适用于排除酸性废水或管外有侵蚀性地下水的污水管道",{"key":31,"text":678,"correct":22},"砌砖渠道在国内外排水工程中应用较早，常用的断面形式有矩形、梯形、拱形等",{"key":34,"text":680,"correct":22},"目前国内生产的UPVC排水管管径绝大部分在DN600以上，比较适合在市政排水管网（管径较大）中使用",{"id":682,"libraryId":5,"type":15,"typeLabel":16,"stem":683,"options":684,"answer":225,"analysis":37},1268300,"市政管道工程包括的种类很多，按其功能主要分为：给水管道、排水管道、（ ）和电力电缆等。",[685,687,689,691,693],{"key":20,"text":686,"correct":26},"电信电缆",{"key":24,"text":688,"correct":26},"电力管道",{"key":28,"text":690,"correct":26},"热力管道",{"key":31,"text":692,"correct":26},"燃气管道",{"key":34,"text":694,"correct":22},"弱电管道",{"id":696,"libraryId":5,"type":15,"typeLabel":16,"stem":697,"options":698,"answer":67,"analysis":37},1268301,"桥管工程施工方案主要内容包括（ ）。",[699,701,703,705,707],{"key":20,"text":700,"correct":26},"吊装前地上管节组对拼装方法",{"key":24,"text":702,"correct":26},"施工平面布置图及剖面图；管桥吊装施工方法的选择及相应的技术要求",{"key":28,"text":704,"correct":22},"管道（段）下沉测量控制方法",{"key":31,"text":706,"correct":26},"水上运输航线的确定，通航管理措施",{"key":34,"text":708,"correct":26},"施工场地临时供电、供水、通信等设计",{"id":710,"libraryId":5,"type":15,"typeLabel":16,"stem":711,"options":712,"answer":553,"analysis":37},1268302,"下列关于不开槽管道施工的说法中，表述正确的是（ ）。",[713,715,717,719,721],{"key":20,"text":714,"correct":26},"顶管宜采用工作坑壁的原土作后背",{"key":24,"text":716,"correct":22},"井深大于6m且有地下水时，不宜采用地下连续墙、沉井等支护方法",{"key":28,"text":718,"correct":26},"液压顶进设备液压油缸活塞退回时，油压不得过大，速度不得过快",{"key":31,"text":720,"correct":22},"中继间的设计最大顶力应超过管节承压面抗压能力的70%",{"key":34,"text":722,"correct":26},"触变泥浆灌注应从顶管的前端进行，待顶进数米后，再从后端及中间进行补浆",{"id":724,"libraryId":5,"type":15,"typeLabel":16,"stem":725,"options":726,"answer":383,"analysis":37},1268303,"计算工程量单价的价格依据包括（ ）。",[727,729,731,733,735],{"key":20,"text":728,"correct":22},"概算定额",{"key":24,"text":730,"correct":26},"人工单价",{"key":28,"text":732,"correct":26},"材料价格",{"key":31,"text":734,"correct":26},"材料运杂费",{"key":34,"text":736,"correct":26},"机械台班费",[738,742,745,748,751,754],{"id":739,"name":740,"category":7,"favorite":741},1,"领导干部任职前廉政法规知识测试题",92,{"id":743,"name":744,"category":7,"favorite":739},595,"建筑结构与设备",{"id":746,"name":747,"category":7,"favorite":739},715,"招标采购专业知识与法律法规",{"id":749,"name":750,"category":7,"favorite":739},848,"市政方向-通用基础",{"id":752,"name":753,"category":7,"favorite":8},534,"BIM工程师",{"id":755,"name":753,"category":7,"favorite":8},535]