[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-855-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":617},{"id":5,"name":6,"category":7,"favorite":8},855,"(市政质量)基础知识","建筑工程",0,13,50,1355,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,379,391,403,415,427,438,450,462,474,486,498,510,522,534,546,558,570,582,594,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1267897,1,"单选题","高压和中压A燃气管道，应采用（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","机械接口铸铁管",false,{"key":24,"text":25,"correct":22},"B","聚乙烯管材",{"key":27,"text":28,"correct":29},"C","钢管",true,{"key":31,"text":32,"correct":22},"D","软管","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1267898,"（ ）应具有足够的、均匀一致的承载力和较大的刚度；有足够的抗冲刷能力和抗变形能力，坚实、平整、整体性好。",[38,40,42,44],{"key":20,"text":39,"correct":22},"垫层",{"key":24,"text":41,"correct":29},"基层",{"key":27,"text":43,"correct":22},"面层",{"key":31,"text":45,"correct":22},"承重层",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},1267899,"根据喷锚暗挖法施工技术要求的内容，冻结法不具有的特点是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"封水效果好",{"key":24,"text":53,"correct":22},"适应性强",{"key":27,"text":55,"correct":22},"整体性好",{"key":31,"text":57,"correct":29},"局部性能好",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1267900,"配制预应力混凝土时应优先采用（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":29},"普通硅酸盐水泥",{"key":24,"text":65,"correct":22},"矿渣硅酸盐水泥",{"key":27,"text":67,"correct":22},"火山灰质硅酸盐水泥",{"key":31,"text":69,"correct":22},"粉煤灰硅酸盐水泥",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},1267901,"关于用各种起吊机具设备吊放梁、板的说法，错误的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"起吊混凝土梁板时，捆绑吊点位置应按设计规定或根据计算决定",{"key":24,"text":77,"correct":22},"吊移板式构件时，不得吊错板梁的上、下面，防止折断",{"key":27,"text":79,"correct":22},"构件移运、停放的支承位置应与吊点位置一致，并应支承稳固",{"key":31,"text":81,"correct":29},"混凝土梁、板经过验算不会发生超容许应力情况时，可采用一个吊点在梁的重心起吊",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1267902,"地基加固常用方法不包括下列哪一项？。",[86,88,90,92],{"key":20,"text":87,"correct":22},"注浆法",{"key":24,"text":89,"correct":22},"深层搅拌法",{"key":27,"text":91,"correct":22},"高压喷射注浆法",{"key":31,"text":93,"correct":29},"旋浆法",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1267903,"满足下面（ ）两个条件的样本称为简单随机样本，又称为样本。",[98,100,102,104],{"key":20,"text":99,"correct":22},"随机性和排斥性",{"key":24,"text":101,"correct":29},"随机性和独立性",{"key":27,"text":103,"correct":22},"独立性和规律性",{"key":31,"text":105,"correct":22},"排斥性和规律性",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},1267904,"装配式桥梁构件在吊装时，混凝土的强度一般不得低于设计强度的（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"25%",{"key":24,"text":113,"correct":22},"45%",{"key":27,"text":115,"correct":22},"55%",{"key":31,"text":117,"correct":29},"75%",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1267905,"垃圾填埋场泥质防水层施工技术的核心是。",[122,124,126,128],{"key":20,"text":123,"correct":22},"选择原材料配合比",{"key":24,"text":125,"correct":22},"控制防水层压实度",{"key":27,"text":127,"correct":29},"掺加膨润土的拌合土层施工技术",{"key":31,"text":129,"correct":22},"分层压实施工技术",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},1267906,"当基坑开挖较浅、尚未设支撑时，维护墙体的水平变形表现为（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":29},"墙顶位移最大，向基坑方向水平位移",{"key":24,"text":137,"correct":22},"墙顶位移最小，向基坑方向水平位移，呈三角形分布",{"key":27,"text":139,"correct":22},"墙顶位移最大，向基坑外方向水平位移",{"key":31,"text":141,"correct":22},"墙顶位移最小，向基坑外方向水平位移，呈三角形分布",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},1267907,"关于后张法预应力施工孔道压浆的说法中，错误的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"当白天气温高于35℃时，压浆宜在夜间进行",{"key":24,"text":149,"correct":29},"压浆完成24h以后，结构混凝土的温度可以低于5℃",{"key":27,"text":151,"correct":22},"压浆作业每一工班应留取不少于3组水泥浆试块，标养28d",{"key":31,"text":153,"correct":22},"水泥浆的强度应符合设计要求，设计无要求时不得低于30MPa",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},1267908,"无盖水池满水试验的蒸发量，可设现场蒸发水箱，并在水箱内设水位测针进行测定。（ ），测定水箱中的水位。",[158,160,162,164],{"key":20,"text":159,"correct":22},"测定水池中水位之前12h",{"key":24,"text":161,"correct":22},"测定水池中水位之后12h",{"key":27,"text":163,"correct":29},"测定水池中水位的同时",{"key":31,"text":165,"correct":22},"测定水池中水位之后8h",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},1267909,"场地地形坡度应有利于填埋场施工和其他建筑设施的布置，原则上地形的自然坡度不应大于（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"6%",{"key":24,"text":173,"correct":29},"5%",{"key":27,"text":175,"correct":22},"4%",{"key":31,"text":177,"correct":22},"3%",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},1267910,"预应力筋张拉后，应及时进行孔道压浆，多跨连续有连接器的预应力筋孔道，应张拉完一段灌注一段；孔道压浆宜采用水泥浆，水泥浆应符合设计要求，如设计无要求，则不能低于（ ）MPa。",[182,184,186,188],{"key":20,"text":183,"correct":22},"10",{"key":24,"text":185,"correct":22},"20",{"key":27,"text":187,"correct":29},"30",{"key":31,"text":189,"correct":22},"40",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":20,"analysis":33},1267911,"在混凝土振捣过程中，振捣器的振动顺序为（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":29},"插人式振捣器→平板式振捣器→振动梁（重）→振动梁（轻）→无缝钢管滚杆提浆赶浆",{"key":24,"text":197,"correct":22},"平板式振捣器→插入式振捣器→振动梁（重）→振动梁（轻）→无缝钢管滚杆提浆赶浆",{"key":27,"text":199,"correct":22},"插入式振捣器→平板式振捣器→振动梁（轻）→振动梁（重）→无缝钢管滚杆提浆赶浆",{"key":31,"text":201,"correct":22},"平板式振捣器→插入式振捣器→无缝钢管滚杆提浆赶浆→振动梁（重）→振动梁（轻）",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},1267912,"水泥混凝土路面施工摊铺混凝土时，板厚大于22cm的混凝土应分二次摊铺，下部摊铺厚度宜为总厚的（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"2\u002F5",{"key":24,"text":209,"correct":22},"1\u002F2",{"key":27,"text":211,"correct":29},"3\u002F5",{"key":31,"text":213,"correct":22},"3\u002F4",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},1267913,"路基施工时，填土方段内应事先找平，当地面坡度陡于1：5时，需修台阶形式，每层台阶高度不宜大于（ ）mm，宽度不宜小于（ ）m。",[218,220,222,224],{"key":20,"text":219,"correct":22},"200;1.0",{"key":24,"text":221,"correct":22},"200;1.5",{"key":27,"text":223,"correct":22},"300;1.5",{"key":31,"text":225,"correct":29},"300;1.0",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},1267914,"不属于盾构法修建区间隧道的衬砌是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":29},"复合式衬砌",{"key":24,"text":233,"correct":22},"预制装配式衬砌",{"key":27,"text":235,"correct":22},"双层衬砌",{"key":31,"text":237,"correct":22},"整体式衬砌",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":24,"analysis":33},1267915,"不属于给水与污水处理厂试运行基本程序的是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"单机试车",{"key":24,"text":245,"correct":29},"设备机组强制开停机试运行",{"key":27,"text":247,"correct":22},"设备机组充水试验",{"key":31,"text":249,"correct":22},"设备机组负荷试运行",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},1267916,"先张法预应力施工中，梁体钢筋及模板严禁使用的切割方法是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":29},"电弧焊",{"key":24,"text":257,"correct":22},"C02保护焊",{"key":27,"text":259,"correct":22},"电渣焊",{"key":31,"text":261,"correct":22},"电阻焊",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},1267917,"用坚实系数分类的方法，主要包括粉质黏土，潮湿的黄土，夹有碎石、卵石的砂，粉土混卵（碎）石，种植土、填土等坚实系数为0.6-0.8的工程用土是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"一类土，松软土",{"key":24,"text":269,"correct":29},"二类土，普通土",{"key":27,"text":271,"correct":22},"三类土，坚土",{"key":31,"text":273,"correct":22},"四类土，砂砾坚土",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":27,"analysis":33},1267918,"热力管道在实施焊接前，应根据焊接工艺试验结果编写焊接工：艺方案。下列选项中不是焊接工艺方案内容的是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"母材性能和焊接材料",{"key":24,"text":281,"correct":22},"焊接结构形式及外形尺寸",{"key":27,"text":283,"correct":29},"焊缝长度及点数的规定",{"key":31,"text":285,"correct":22},"坡口形式及制作方案",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":20,"analysis":33},1267919,"整体式现浇混凝土施工池体结构施工流程说法正确的是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":29},"测量定位→土方开挖及地基处理→垫层施工→防水层施工→底板浇筑→池壁及顶板支撑柱浇筑→顶板浇筑→功能性试验",{"key":24,"text":293,"correct":22},"测量定位→土方开挖及地基处理→防水层施工→垫层施工→底板浇筑→池壁及顶板支撑柱浇筑→顶板浇筑→功能性试验",{"key":27,"text":295,"correct":22},"测量定位→土方开挖及地基处理→底板浇筑→垫层施工→防水层施工→池壁及顶板支撑柱浇筑→功能性试验→扳浇筑",{"key":31,"text":297,"correct":22},"测量定位→土方开挖及地基处理→垫层施工→防水层施工→底板浇筑→池壁及顶板支撑柱浇筑→功能性试验→顶板浇筑",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":31,"analysis":33},1267920,"预应力混凝土连续梁悬臂浇筑施工中，顶板纵向预应力筋正确的张拉顺序是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"上下对称张拉",{"key":24,"text":305,"correct":22},"左右对称张拉",{"key":27,"text":307,"correct":22},"上下、左右依次张拉，",{"key":31,"text":309,"correct":29},"上下、左右对称张拉",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":24,"analysis":33},1267921,"燃气管道在直埋电缆处为整条管道的最低点，设计应考虑在此最低点处增设（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"阀门",{"key":24,"text":317,"correct":29},"排水器",{"key":27,"text":319,"correct":22},"放散管",{"key":31,"text":321,"correct":22},"补偿器",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":27,"analysis":33},1267922,"砌筑沟道施工时，砌筑砂浆应采用水泥砂浆，其强度等级应符合设计要求，且不应低于（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"M20",{"key":24,"text":329,"correct":22},"M15",{"key":27,"text":331,"correct":29},"M10",{"key":31,"text":333,"correct":22},"M7.5",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":27,"analysis":33},1267923,"属于明挖基坑施工特有的监控量测必测项目是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"地表沉降",{"key":24,"text":341,"correct":22},"地下管线沉降",{"key":27,"text":343,"correct":29},"支撑轴力",{"key":31,"text":345,"correct":22},"建筑物沉降",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},1267924,"经二级处理后，BOD5去除率可达（ ）以上，二沉池出水能达标排放。",[350,352,354,356],{"key":20,"text":351,"correct":22},"85%",{"key":24,"text":353,"correct":29},"90%",{"key":27,"text":355,"correct":22},"95%",{"key":31,"text":357,"correct":22},"100%",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},1267925,"施工成本管理的基本流程正确的是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":29},"成本预测→管理决策→管理计划→过程控制→成本核算→分析和考核",{"key":24,"text":365,"correct":22},"成本预测→管理计划→管理决策→过程控制→成本核算→分析和考核",{"key":27,"text":367,"correct":22},"成本核算→成本预測→管理决策→管理计划→过程控制→分析和考核",{"key":31,"text":369,"correct":22},"成本核算→成本预测→管理决策→管理计划→过程控制→分析和考核",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":27,"analysis":33},1267926,"属于喷锚暗挖法施工隧道中特有的监控量测必测项目是（ ）。",[374,375,376,378],{"key":20,"text":339,"correct":22},{"key":24,"text":341,"correct":22},{"key":27,"text":377,"correct":29},"拱顶下沉",{"key":31,"text":345,"correct":22},{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":20,"analysis":33},1267927,"下列不属于项目“四项管理”的内容为（ ）。",[383,385,387,389],{"key":20,"text":384,"correct":29},"项目安全管理",{"key":24,"text":386,"correct":22},"项目合同管理",{"key":27,"text":388,"correct":22},"项目信息管理",{"key":31,"text":390,"correct":22},"项目生产要素管理",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":24,"analysis":33},1267928,"质量数据是指由（ ）组成的样本的质量数据集，在统计上称为变量。",[395,397,399,401],{"key":20,"text":396,"correct":22},"产品总体质量特性值",{"key":24,"text":398,"correct":29},"个体产品质量特性值",{"key":27,"text":400,"correct":22},"产品总体质量共性值",{"key":31,"text":402,"correct":22},"个体产品质量共性值",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":20,"analysis":33},1267929,"下列不属于运用动态控制原理控制施工成本的步骤有（ ）。",[407,409,411,413],{"key":20,"text":408,"correct":29},"施工成本目标的制定",{"key":24,"text":410,"correct":22},"施工成本目标的逐层分解",{"key":27,"text":412,"correct":22},"在施工过程中，对施工成本目标进行动态跟踪和控制",{"key":31,"text":414,"correct":22},"调整施工成本目标",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":20,"analysis":33},1267930,"当索赔事件持续进行时，承包方应当阶段性向（ ）发出索赔意向通知，在索赔事件终了后28天内，向（ ）提出索赔的有关资料和最终索赔报告。",[419,421,423,425],{"key":20,"text":420,"correct":29},"监理工程师；监理工程师",{"key":24,"text":422,"correct":22},"监理工程师；建设单位",{"key":27,"text":424,"correct":22},"建设单位；监理工程师",{"key":31,"text":426,"correct":22},"建设单位；建设单位",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":31,"analysis":33},1267931,"当温度低于（ ）℃时，应采取保温措施，不得对混凝土洒水养护。",[431,433,434,436],{"key":20,"text":432,"correct":22},"12",{"key":24,"text":183,"correct":22},{"key":27,"text":435,"correct":22},"8",{"key":31,"text":437,"correct":29},"5",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":24,"analysis":33},1267932,"热水热网根据热媒温度可分为高温热水热网和低温热水热网两类。其中，低温热水热网中热媒允许的最高温度是（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":22},"50℃",{"key":24,"text":445,"correct":29},"95℃",{"key":27,"text":447,"correct":22},"100℃",{"key":31,"text":449,"correct":22},"160℃",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":24,"analysis":33},1267933,"当利用原有的平面控制网时，应进行复测，其精度应符合要求；投影所引起的长度变形，不应超过（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":22},"1\u002F4000",{"key":24,"text":457,"correct":29},"1\u002F40000",{"key":27,"text":459,"correct":22},"1\u002F2000",{"key":31,"text":461,"correct":22},"1\u002F20000",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":20,"analysis":33},1267934,"下列有关给水与污水处理厂单机试车的要求不正确的是哪项（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":29},"单机试车，一般空车试运行不少于1小时",{"key":24,"text":469,"correct":22},"各执行机构运作调试完毕，动作反应正确",{"key":27,"text":471,"correct":22},"自动控制系统的信号元件及元件动作正常",{"key":31,"text":473,"correct":22},"检测并记录单机运行数据",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":27,"analysis":33},1267935,"填料式补偿器安装应符合的要求，下列叙述不正确的是（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":22},"应与管道保持同心.不得歪斜",{"key":24,"text":481,"correct":22},"导向支座应保证运行时自由伸缩.不得偏离中心",{"key":27,"text":483,"correct":29},"插管应安装在燃气流出端",{"key":31,"text":485,"correct":22},"填料石棉绳应涂石墨粉并应逐圈装入.逐圈压紧.各圈接口应相互错开",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":31,"analysis":33},1267936,"下面哪项不是CIPP原位固化法的主要特点？（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":22},"定点开挖且开挖量小，无污染，对周边环境影响小",{"key":24,"text":493,"correct":22},"施工设备简单，周期短",{"key":27,"text":495,"correct":22},"适用各类材质和形状的管线",{"key":31,"text":497,"correct":29},"施工受季节影响较大",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":31,"analysis":33},1267937,"下列不属于施工项目目标控制的任务有（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":22},"质量目标控制",{"key":24,"text":505,"correct":22},"进度目标控制",{"key":27,"text":507,"correct":22},"成本目标控制",{"key":31,"text":509,"correct":29},"安全目标控制",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":20,"analysis":33},1267938,"施工现场布置与管理的基本要求，下列不包括（ ）。",[514,516,518,520],{"key":20,"text":515,"correct":29},"建立文明施工管理制度，现场成立专职的文明施工小分队，负责全线文明施工的管理工作",{"key":24,"text":517,"correct":22},"在施工用地范围内，将各项生产、生活设施及其他辅助设施进行规划和布置，满足施工及维持社会交通要求",{"key":27,"text":519,"correct":22},"工程施工阶段按照施工总平面要求，设置道路、组织排水、搭建临时设施、堆放物料和停放机械设备等",{"key":31,"text":521,"correct":22},"市政公用工程的施工平面布置图有明显的动态特性，必须详细考虑好每一步的平面布置及合理衔接，科学合理的规划，绘出施工现场平面图",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":31,"analysis":33},1267939,"现浇混凝土盖梁预应力张拉必须做到“六不张拉”，下列选项中不是“六不张拉”的是（ ）。",[526,528,530,532],{"key":20,"text":527,"correct":22},"配套构件不符合设计要求",{"key":24,"text":529,"correct":22},"预应力筋规格不符合设计要求",{"key":27,"text":531,"correct":22},"张拉前交底不清",{"key":31,"text":533,"correct":29},"张拉设备未经校验",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":31,"analysis":33},1267940,"宜采用锤击沉桩的情况是（ ）。",[538,540,542,544],{"key":20,"text":539,"correct":22},"在黏土、砂土、碎石土，且较厚的河床覆土中沉桩",{"key":24,"text":541,"correct":22},"在密实的黏性土、砾石、风化岩中沉桩",{"key":27,"text":543,"correct":22},"在软黏土（标准贯人度N\u003C20）、淤泥质土中沉桩",{"key":31,"text":545,"correct":29},"在砂类土、黏性土中沉桩",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":24,"analysis":33},1267941,"如果一个总体是由质量明显差异的几个部分组成，则宜采用（ ）。",[550,552,554,556],{"key":20,"text":551,"correct":22},"整群抽样",{"key":24,"text":553,"correct":29},"分层随机抽样",{"key":27,"text":555,"correct":22},"系统抽样",{"key":31,"text":557,"correct":22},"简单随机抽样",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":27,"analysis":33},1267942,"因工程建设需要挖掘城市道路的，应持（ ）批准签发的文件到有关部门办理审批手续。",[562,564,566,568],{"key":20,"text":563,"correct":22},"建设单位",{"key":24,"text":565,"correct":22},"监理单位",{"key":27,"text":567,"correct":29},"城市规划部门",{"key":31,"text":569,"correct":22},"公安交通部门",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":27,"analysis":33},1267943,"承担燃气钢质管道、设备焊接的人员，间断焊接工作时间超过（ ）的，再次上岗前应重新。",[574,576,578,580],{"key":20,"text":575,"correct":22},"3个月",{"key":24,"text":577,"correct":22},"5个月",{"key":27,"text":579,"correct":29},"6个月",{"key":31,"text":581,"correct":22},"12个月",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":31,"analysis":33},1267944,"在配置预应力混凝土过程中，当从各种材料引入的氯离子总含量超过（ ）时，应采取防锈措施。",[586,588,590,592],{"key":20,"text":587,"correct":22},"0.01%",{"key":24,"text":589,"correct":22},"0.02%",{"key":27,"text":591,"correct":22},"0.05%",{"key":31,"text":593,"correct":29},"0.06%",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":24,"analysis":33},1267945,"管道基础施工，当槽深超过（ ），基础浇筑时，必须采用串筒或滑槽来倾倒混凝土，以防混凝土发生离析现象。",[598,600,602,604],{"key":20,"text":599,"correct":22},"1m",{"key":24,"text":601,"correct":29},"2m",{"key":27,"text":603,"correct":22},"3m",{"key":31,"text":605,"correct":22},"4m",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":27,"analysis":33},1267946,"用网喷混凝土加固基坑壁施工时，可优先选用硅酸盐水泥或普通硅酸盐水泥，也可用矿渣或火山灰硅酸盐水泥，水泥强度等级不应低于（ ）级。",[610,611,613,615],{"key":20,"text":187,"correct":22},{"key":24,"text":612,"correct":22},"31.5",{"key":27,"text":614,"correct":29},"32.5",{"key":31,"text":616,"correct":22},"34",[618,621,624,627,630,633],{"id":15,"name":619,"category":7,"favorite":620},"领导干部任职前廉政法规知识测试题",92,{"id":622,"name":623,"category":7,"favorite":15},595,"建筑结构与设备",{"id":625,"name":626,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":628,"name":629,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":631,"name":632,"category":7,"favorite":8},534,"BIM工程师",{"id":634,"name":632,"category":7,"favorite":8},535]