[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-855-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":612},{"id":5,"name":6,"category":7,"favorite":8},855,"(市政质量)基础知识","建筑工程",0,11,50,1355,[13,34,46,58,70,82,94,106,118,130,142,154,166,177,189,201,213,225,237,249,261,273,285,297,309,321,333,345,357,369,381,393,405,417,429,441,453,465,476,488,500,512,524,536,548,560,570,579,588,600],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1267797,1,"单选题","法兰与法兰、法兰与管道应保持同轴，螺栓孔中心偏差不得超过孔径的（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","2%",false,{"key":24,"text":25,"correct":22},"B","3%",{"key":27,"text":28,"correct":22},"C","4%",{"key":30,"text":31,"correct":32},"D","5%",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1267798,"梁、板落位时，梁、板的顺桥向位置，一般以（ ）为准。",[38,40,42,44],{"key":20,"text":39,"correct":22},"活动端",{"key":24,"text":41,"correct":32},"固定端",{"key":27,"text":43,"correct":22},"两端面与盖粱间距相等",{"key":30,"text":45,"correct":22},"活动端端面对齐",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},1267799,"泥质防水层的施工控制要点不包括（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"控制检验频率和质量标准",{"key":24,"text":53,"correct":22},"拌和均匀度、含水量及碾压压实度",{"key":27,"text":55,"correct":22},"膨润土进货质量",{"key":30,"text":57,"correct":32},"对比多组土样，实验室确定配合比",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1267800,"涵洞施工完成后，当涵洞砌体砂浆或混凝土强度达到设计强度的（ ）时，方可进行填土。",[62,64,66,68],{"key":20,"text":63,"correct":22},"50%.",{"key":24,"text":65,"correct":32},"75%",{"key":27,"text":67,"correct":22},"90%",{"key":30,"text":69,"correct":22},"100%",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1267801,"适用于一般土质或易坍塌的软弱围岩、断面较大的隧道施工的浅埋暗挖法是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"全断面法",{"key":24,"text":77,"correct":22},"台阶开挖法",{"key":27,"text":79,"correct":32},"环形开挖预留核心土法",{"key":30,"text":81,"correct":22},"中洞法",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1267802,"环境管理目标不包括下列哪一项（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":32},"制定并保持本项目的职业健康安全管理方案以实现其目标，管理方案中具体措施可与劳动保护、职业病防治相结合",{"key":24,"text":89,"correct":22},"满足国家和当地政府部门有关规定",{"key":27,"text":91,"correct":22},"满足工程合同和施工组织设计要求",{"key":30,"text":93,"correct":22},"兑现投标文件承诺",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},1267803,"在工程实施阶段，关手施工图预算作用阐述有误的是。",[98,100,102,104],{"key":20,"text":99,"correct":22},"施工图预算是施工单位和项目部成本控制的主要依据",{"key":24,"text":101,"correct":22},"施工图预算是工程费用调整的依据",{"key":27,"text":103,"correct":32},"施工图预算对编制实施性施工组织设计作用基本不大",{"key":30,"text":105,"correct":22},"只有在出现重大设计变更、政策调整及不可抗力等情况下方可调整施工图预算",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},1267804,"下列有关钢筋混凝土板桩围堰施工要求说法错误的是。",[110,112,114,116],{"key":20,"text":111,"correct":22},"板桩断面应符合设计要求，板桩桩尖角度视土质坚硬程度而定，沉人砂砾的板桩桩头，应增设加劲钢筋或钢板",{"key":24,"text":113,"correct":22},"钢筋混凝土钢板的制作，应用刚度较大的模板，榫口接缝应顺直、密合",{"key":27,"text":115,"correct":22},"目前钢筋混凝土板桩中，空心板桩较多，空心多为圆形，用钢管作芯膜",{"key":30,"text":117,"correct":32},"板桩榫口一般圆形的较好，桩尖一般斜度为1：1.5-1：2.5",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1267805,"下列关于连续梁合龙的表述哪项是错误的？（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"合龙段的长度宜为2米",{"key":24,"text":125,"correct":22},"合龙前应观测气温变化与梁端高程及悬臂端间距的关系",{"key":27,"text":127,"correct":32},"合龙宜在一天中气温最高时进行",{"key":30,"text":129,"correct":22},"合龙段的混凝土强度应提高一级，以尽早施加预应力",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1267806,"墩台混凝土分块浇筑时，墩台水平截面积在200㎡内的分块数量不得超过（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"1块",{"key":24,"text":137,"correct":32},"2块",{"key":27,"text":139,"correct":22},"3块",{"key":30,"text":141,"correct":22},"4块",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":30,"analysis":33},1267807,"下列不属于技术管理的内容的是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"图纸的熟悉审查及会审、设计交底",{"key":24,"text":149,"correct":22},"编制施工组织设计及技术交底",{"key":27,"text":151,"correct":22},"技术管理工作",{"key":30,"text":153,"correct":32},"工程验收",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},1267808,"下列属于计数数据的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"1.1，1.2，1.3，1.4，1.5",{"key":24,"text":161,"correct":22},"2.1，1.2，2.4，1.6，2.8",{"key":27,"text":163,"correct":32},"2，4，6，8，10",{"key":30,"text":165,"correct":22},"1，2.2，3，4.6，5",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":30,"analysis":33},1267809,"钢筋混凝土工程中，HRB335、HRB400钢筋的冷拉率不得大于。",[170,172,173,175],{"key":20,"text":171,"correct":22},"0.50%",{"key":24,"text":21,"correct":22},{"key":27,"text":174,"correct":22},"1.50%",{"key":30,"text":176,"correct":32},"1%",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":24,"analysis":33},1267810,"20箱零件，每箱都随机抽取5个零件，共100个零件组成样本的抽样方法为（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":22},"随机抽样",{"key":24,"text":184,"correct":32},"分层抽样",{"key":27,"text":186,"correct":22},"整群抽样",{"key":30,"text":188,"correct":22},"系统抽样",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":20,"analysis":33},1267811,"建设单位应当自工程竣工验收合格之日起（ ）日内，向工程所在地县级以上地方人民政府建设行政主管部门备案。",[193,195,197,199],{"key":20,"text":194,"correct":32},"15",{"key":24,"text":196,"correct":22},"30",{"key":27,"text":198,"correct":22},"60",{"key":30,"text":200,"correct":22},"90",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":27,"analysis":33},1267812,"水泥混凝土的垫层材料应与路基宽度相同，其最小厚度为。",[205,207,209,211],{"key":20,"text":206,"correct":22},"100mm",{"key":24,"text":208,"correct":22},"120mm",{"key":27,"text":210,"correct":32},"150mm",{"key":30,"text":212,"correct":22},"170mm",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":27,"analysis":33},1267813,"城镇道路土质路基压实原则。",[217,219,221,223],{"key":20,"text":218,"correct":22},"先轻后重、先静后振、先低后高、先快后慢、轮迹重叠",{"key":24,"text":220,"correct":22},"先重后轻、先静后振、先低后高、先慢后快、轮迹重叠",{"key":27,"text":222,"correct":32},"先轻后重、先静后振、先低后高、先慢后快、轮迹重叠",{"key":30,"text":224,"correct":22},"先轻后重、先静后振、先高后低、先慢后快、轮迹重叠",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":30,"analysis":33},1267814,"工具式模板工程不包括（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"滑膜",{"key":24,"text":232,"correct":22},"爬模",{"key":27,"text":234,"correct":22},"飞模",{"key":30,"text":236,"correct":32},"走模",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":30,"analysis":33},1267815,"基坑开挖一段后先浇筑顶板，在顶板保护下，实现对围护墙的支护作用的地铁工程施工方法称为（ ）。",[241,243,245,247],{"key":20,"text":242,"correct":22},"明挖顺作法",{"key":24,"text":244,"correct":22},"明挖逆作法",{"key":27,"text":246,"correct":22},"盖挖顺作法",{"key":30,"text":248,"correct":32},"盖挖逆作法",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":30,"analysis":33},1267816,"频数直方图可以用来（ ）。",[253,255,257,259],{"key":20,"text":254,"correct":22},"提供表示事物特征的数据",{"key":24,"text":256,"correct":22},"研究取样和试验方法",{"key":27,"text":258,"correct":22},"分析影响事物变化的因素",{"key":30,"text":260,"correct":32},"发现质量问题",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":20,"analysis":33},1267817,"在污水一级处理工艺中，主要针对水中悬浮物质的常用处理方法是（ ）。",[265,267,269,271],{"key":20,"text":266,"correct":32},"物理方法",{"key":24,"text":268,"correct":22},"化学方法",{"key":27,"text":270,"correct":22},"生物方",{"key":30,"text":272,"correct":22},"生化方法",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":24,"analysis":33},1267818,"改性沥青混合料的贮存时间不宜超过（ ）小时。",[277,279,281,283],{"key":20,"text":278,"correct":22},"12",{"key":24,"text":280,"correct":32},"24",{"key":27,"text":282,"correct":22},"36",{"key":30,"text":284,"correct":22},"48",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},1267819,"有支护的基坑土方开挖过程中，能够反映坑底土体隆起情况的监测项是（ ）。",[289,291,293,295],{"key":20,"text":290,"correct":32},"立柱变形",{"key":24,"text":292,"correct":22},"冠梁变形",{"key":27,"text":294,"correct":22},"地表沉降",{"key":30,"text":296,"correct":22},"锚索变形",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":24,"analysis":33},1267820,"完成第（ ）次清孔后，应立即开始灌注混凝土，若因故推迟灌注混凝土，应重新进行清孔。",[301,303,305,307],{"key":20,"text":302,"correct":22},"一",{"key":24,"text":304,"correct":32},"二",{"key":27,"text":306,"correct":22},"三",{"key":30,"text":308,"correct":22},"四",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":27,"analysis":33},1267821,"喷射混凝土优先选用（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":22},"矿渣硅酸盐水泥",{"key":24,"text":316,"correct":22},"火山灰硅酸盐水泥",{"key":27,"text":318,"correct":32},"硅酸盐水泥",{"key":30,"text":320,"correct":22},"复合硅酸盐水泥",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":20,"analysis":33},1267822,"下列不属于运用动态控制原理控制施工进度的步骤有（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":32},"施工进度目标的制定",{"key":24,"text":328,"correct":22},"施工进度目标的逐层分解",{"key":27,"text":330,"correct":22},"在施工工程中，对施工进度目标进行动态跟踪和控制",{"key":30,"text":332,"correct":22},"调整施工进度目标",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":27,"analysis":33},1267823,"全断面修复法的分类是（ ）。",[337,339,341,343],{"key":20,"text":338,"correct":22},"交接管法、机器人法、内衬法",{"key":24,"text":340,"correct":22},"密封法、补丁法、灌浆法",{"key":27,"text":342,"correct":32},"内衬法、缠绕法、喷涂法",{"key":30,"text":344,"correct":22},"缠绕法、密封法、补丁法",{"id":346,"libraryId":5,"type":15,"typeLabel":16,"stem":347,"options":348,"answer":30,"analysis":33},1267824,"下列不属于工程项目资金管理的内容的是（ ）。",[349,351,353,355],{"key":20,"text":350,"correct":22},"资金筹集",{"key":24,"text":352,"correct":22},"资金使用",{"key":27,"text":354,"correct":22},"资金的回收和分配",{"key":30,"text":356,"correct":32},"成本核算",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":20,"analysis":33},1267825,"用于沥青混合料面层压实度检测的方法是（ ）。",[361,363,365,367],{"key":20,"text":362,"correct":32},"钻孔法",{"key":24,"text":364,"correct":22},"环刀法",{"key":27,"text":366,"correct":22},"灌砂法",{"key":30,"text":368,"correct":22},"灌水法",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":24,"analysis":33},1267826,"项目目标动态控制的准备工作：将项目的目标进行分解，以确定用于目标控制的（ ）。",[373,375,377,379],{"key":20,"text":374,"correct":22},"实际值",{"key":24,"text":376,"correct":32},"计划值",{"key":27,"text":378,"correct":22},"指导值",{"key":30,"text":380,"correct":22},"总体目标值",{"id":382,"libraryId":5,"type":15,"typeLabel":16,"stem":383,"options":384,"answer":24,"analysis":33},1267827,"绘水排水压力管道的水压试验分为（ ）。",[385,387,389,391],{"key":20,"text":386,"correct":22},"强度试验和严密性试验",{"key":24,"text":388,"correct":32},"预试验和主试验",{"key":27,"text":390,"correct":22},"闭水试验和闭气试验",{"key":30,"text":392,"correct":22},"满水试验和严密性试验",{"id":394,"libraryId":5,"type":15,"typeLabel":16,"stem":395,"options":396,"answer":30,"analysis":33},1267828,"大体积混凝土的三种裂缝不包括下列哪一项。",[397,399,401,403],{"key":20,"text":398,"correct":22},"贯穿裂缝",{"key":24,"text":400,"correct":22},"深层裂缝",{"key":27,"text":402,"correct":22},"表面裂缝",{"key":30,"text":404,"correct":32},"嵌入裂缝",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":27,"analysis":33},1267829,"根据质量数据的特点，可以将其分为（ ）。",[409,411,413,415],{"key":20,"text":410,"correct":22},"计量数据和计件数据",{"key":24,"text":412,"correct":22},"计点数据和计件数据",{"key":27,"text":414,"correct":32},"计量数据和计数数据",{"key":30,"text":416,"correct":22},"计点数据和计数数据",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":20,"analysis":33},1267830,"劳动消耗定额又称（ ）。",[421,423,425,427],{"key":20,"text":422,"correct":32},"人工消耗定额",{"key":24,"text":424,"correct":22},"材料消耗定额",{"key":27,"text":426,"correct":22},"机械台班消耗定额",{"key":30,"text":428,"correct":22},"施工定额",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":27,"analysis":33},1267831,"下列不属于燃气管道安装完毕后应进行的试验的是（ ）。",[433,435,437,439],{"key":20,"text":434,"correct":22},"管道吹扫",{"key":24,"text":436,"correct":22},"强度试验",{"key":27,"text":438,"correct":32},"闭水试验",{"key":30,"text":440,"correct":22},"严密性试验",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":20,"analysis":33},1267832,"管涵施工过程中，应设置沉降缝的位置是（ ）。",[445,447,449,451],{"key":20,"text":446,"correct":32},"管节接缝处",{"key":24,"text":448,"correct":22},"顶部弧形处",{"key":27,"text":450,"correct":22},"管座处",{"key":30,"text":452,"correct":22},"出水口处",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":24,"analysis":33},1267833,"开挖深度超过（ ）m的基坑（槽）的土方开挖、支护、降水工程需要专家论证。",[457,459,461,463],{"key":20,"text":458,"correct":22},"4",{"key":24,"text":460,"correct":32},"5",{"key":27,"text":462,"correct":22},"6",{"key":30,"text":464,"correct":22},"7",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":24,"analysis":33},1267834,"钢筋机械连接件的最小保护层厚度不得小于（ ）mm。",[469,471,473,474],{"key":20,"text":470,"correct":22},"10",{"key":24,"text":472,"correct":32},"20",{"key":27,"text":196,"correct":22},{"key":30,"text":475,"correct":22},"40",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":30,"analysis":33},1267835,"喷锚加固支护的钢筋网材料宜采用（ ）钢，钢筋直径宜为6-12mm，网格尺寸宜采用150-300mm。",[480,482,484,486],{"key":20,"text":481,"correct":22},"20MnSi",{"key":24,"text":483,"correct":22},"40Si2Mn",{"key":27,"text":485,"correct":22},"2Mn40Si",{"key":30,"text":487,"correct":32},"Q235",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":24,"analysis":33},1267836,"在项目管理中，属项目核心的是（ ）。",[492,494,496,498],{"key":20,"text":493,"correct":22},"合同风险管理",{"key":24,"text":495,"correct":32},"施工成本管理",{"key":27,"text":497,"correct":22},"安全风险管理",{"key":30,"text":499,"correct":22},"施工技术质量管理",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":24,"analysis":33},1267837,"对于特重及重交通等级的混凝土路面，横向胀缝、缩缝均设置（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":22},"连接杆",{"key":24,"text":507,"correct":32},"传力杆",{"key":27,"text":509,"correct":22},"拉力杆",{"key":30,"text":511,"correct":22},"伸缩杆",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":30,"analysis":33},1267838,"张拉用的千斤顶与压力表应配套标定、配套使用，标定应由（ ）定期进行。",[516,518,520,522],{"key":20,"text":517,"correct":22},"业主指定的计量技术机构",{"key":24,"text":519,"correct":22},"监理指定的计量技术机构",{"key":27,"text":521,"correct":22},"施工企业内部的计量技术机构",{"key":30,"text":523,"correct":32},"国家授权的法定计量技术机构",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":24,"analysis":33},1267839,"燃气管道可根据敷设方式、输气压力和（ ）分类。",[528,530,532,534],{"key":20,"text":529,"correct":22},"管道管径大小",{"key":24,"text":531,"correct":32},"用途",{"key":27,"text":533,"correct":22},"管道长度",{"key":30,"text":535,"correct":22},"管道材质",{"id":537,"libraryId":5,"type":15,"typeLabel":16,"stem":538,"options":539,"answer":20,"analysis":33},1267840,"施工项目是指建筑施工企业对一个建筑产品的施工过程及成果，也就是建筑施工企业的（ ）。",[540,542,544,546],{"key":20,"text":541,"correct":32},"生产对象",{"key":24,"text":543,"correct":22},"生产过程",{"key":27,"text":545,"correct":22},"生产工具",{"key":30,"text":547,"correct":22},"生产成果",{"id":549,"libraryId":5,"type":15,"typeLabel":16,"stem":550,"options":551,"answer":30,"analysis":33},1267841,"（ ）可每月组织一次，由项目经理带领，组织项目部各部门负责人参加，对项目现场当时施工的资源配置、人员活动、实物状态、环境条件、管理里行为等进行全方位的安全检查。",[552,554,556,558],{"key":20,"text":553,"correct":22},"安全巡查",{"key":24,"text":555,"correct":22},"季节性安全检查",{"key":27,"text":557,"correct":22},"专项安全检查",{"key":30,"text":559,"correct":32},"综合安全检查",{"id":561,"libraryId":5,"type":15,"typeLabel":16,"stem":562,"options":563,"answer":24,"analysis":33},1267842,"钢桩在场地堆放时，堆放高度最多为（ ）层。",[564,566,568,569],{"key":20,"text":565,"correct":22},"2",{"key":24,"text":567,"correct":32},"3",{"key":27,"text":458,"correct":22},{"key":30,"text":460,"correct":22},{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":27,"analysis":33},1267843,"路面的混凝土浇筑完成后应及时进行养护，养护时间应根据混凝土芎似搜廈增长憎况而定，应特别注意前（ ）d的保湿（温）养护。",[574,575,576,577],{"key":20,"text":567,"correct":22},{"key":24,"text":460,"correct":22},{"key":27,"text":464,"correct":32},{"key":30,"text":578,"correct":22},"9",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":27,"analysis":33},1267844,"管道在做功能性试验时，管段注满水后，宜在不大于工作压力条件下充分浸泡后再进行水压试验，浸泡时间规定：内径小于1000mm的现浇钢筋混凝土管渠、预应力混凝土管、预应力钢筒混凝土管不少于（ ）h。",[583,585,586,587],{"key":20,"text":584,"correct":22},"72",{"key":24,"text":282,"correct":22},{"key":27,"text":284,"correct":32},{"key":30,"text":280,"correct":22},{"id":589,"libraryId":5,"type":15,"typeLabel":16,"stem":590,"options":591,"answer":20,"analysis":33},1267845,"（ ）压路机初压的最大碾压速度是3km\u002Fh。",[592,594,596,598],{"key":20,"text":593,"correct":32},"钢筒式",{"key":24,"text":595,"correct":22},"轮胎式",{"key":27,"text":597,"correct":22},"振动式",{"key":30,"text":599,"correct":22},"钢轨式",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":27,"analysis":33},1267846,"计划批准的开工项目应由（ ），向有关部门申请办理施工许可证手续。",[604,606,608,610],{"key":20,"text":605,"correct":22},"项目总承包单位",{"key":24,"text":607,"correct":22},"施工总承包单位",{"key":27,"text":609,"correct":32},"建设单位",{"key":30,"text":611,"correct":22},"监理单位",[613,616,619,622,625,628],{"id":15,"name":614,"category":7,"favorite":615},"领导干部任职前廉政法规知识测试题",92,{"id":617,"name":618,"category":7,"favorite":15},595,"建筑结构与设备",{"id":620,"name":621,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":623,"name":624,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":626,"name":627,"category":7,"favorite":8},534,"BIM工程师",{"id":629,"name":627,"category":7,"favorite":8},535]