[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268620":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1268620,855,3,"判断题","当分包工程发生质量、安全、进度等方面问题给建设单位造成损失时，建设单位只可以根据总承包合同向总承包单位追究违约责任。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"虽然建设单位和分包单位之间没有合同关系，但是当分包工程发生质量、安全、进度等方面问题给建设单位造成损失时，建设单位既可以根据总承包合同向总承包单位追究违约责任，也可以根据法律规定直接要求分包单位承担损害赔偿责任，分包单位不得拒绝。",{"id":6,"name":21,"category":22,"favorite":23},"(市政质量)基础知识","建筑工程",0]