[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268485":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1268485,855,3,"判断题","桥梁高程控制测量采用的高程基准与其连接的两端路线所采用的高程基准一致。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"桥梁高程控制测量采用高程基准必须与其连接的两端路线所采用的高程基准完全一致。",{"id":6,"name":21,"category":22,"favorite":23},"(市政质量)基础知识","建筑工程",0]