[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268326":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1268326,855,2,"多选题","对原路面以下的路床部分说法正确的是（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","全部为换填土",false,{"key":16,"text":17,"correct":14},"B","全部为填方",{"key":19,"text":20,"correct":21},"C","部分为换填土.部分为填方",true,{"key":23,"text":24,"correct":21},"D","以原地面线和路基顶面线较低者为界进行计算",{"key":26,"text":27,"correct":14},"E","以原地面线和路基顶面线较高者为界进行计算","CD","《清单计价规范》对原地面以下的路床部分，要经过翻挖、掺灰、翻拌、回填工序。原地面以上的路基土需经过借土（或利用土）掺灰、翻拌、回填工序。所以路床填土部分属换填土、部分属填方，应当以原地面线和路基顶面线较低者为界进行分别计量。",{"id":6,"name":31,"category":32,"favorite":33},"(市政质量)基础知识","建筑工程",0]