[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268284":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1268284,855,2,"多选题","关于支架法现浇预应力混凝土箱梁施工要求的说法中正确的是（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","混凝土采用一次浇筑时，在底、腹板钢筋及预应力管道完成后，安装内膜，再绑扎顶板钢筋及预应力管道",true,{"key":16,"text":17,"correct":14},"B","孔道压浆完成后，应将锚具周围冲洗干净并凿毛，设置钢筋网，浇筑封锚混凝土",{"key":19,"text":20,"correct":21},"C","一般应在混凝土抗压强度达到3.6MPa方可拆除侧模",false,{"key":23,"text":24,"correct":21},"D","非承重侧模应在混凝土强度达到设计要求方可拆除",{"key":26,"text":27,"correct":14},"E","预应力混凝土结构构件模板的拆除，侧模应在预应力张拉前拆除，底模应在结构构件建立预应力后方可拆除","ABE","混凝土采用一次浇筑时，在底、腹板钢筋及预应力管道完成后，安装内膜，再绑扎顶板钢筋及预应力管道。孔道压浆完成后，应将锚具周围冲洗干净并凿毛，设置钢筋网，浇筑封锚混凝土。一般应在混凝土抗压强度达到2.5MPa方可拆除侧模。非承重侧模应在混凝土强度能保证其表面及楞角不致因拆模受损害时方可拆除。预应力混凝土结构构件模板的拆除，侧模应在预应力张拉前拆除，底模应在结构构件建立预应力后方可拆除。",{"id":6,"name":31,"category":32,"favorite":33},"(市政质量)基础知识","建筑工程",0]