[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1268264":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1268264,855,2,"多选题","全站仪上半部分包含有测量的4大光电系统，即（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","水平角测量系统",true,{"key":16,"text":17,"correct":14},"B","竖直角测量系统",{"key":19,"text":20,"correct":21},"C","垂直补偿系统",false,{"key":23,"text":24,"correct":14},"D","水平补偿系统",{"key":26,"text":27,"correct":14},"E","测距系统","ABDE","全站仪上半部分包含有测量的4大光电系统，即水平角测量系统、竖直角测量系统、水平补偿系统和测距系统。",{"id":6,"name":31,"category":32,"favorite":33},"(市政质量)基础知识","建筑工程",0]