[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1267939":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1267939,855,1,"单选题","现浇混凝土盖梁预应力张拉必须做到“六不张拉”，下列选项中不是“六不张拉”的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","配套构件不符合设计要求",false,{"key":16,"text":17,"correct":14},"B","预应力筋规格不符合设计要求",{"key":19,"text":20,"correct":14},"C","张拉前交底不清",{"key":22,"text":23,"correct":24},"D","张拉设备未经校验",true,"“六不张拉”是指：没有预应力筋出厂材料合格证、预应力筋规格不符合设计要求、配套构件不符合设计要求、张拉前交底不清、准备工作不充分安全设施未做好、混凝土强度达不到设计要求，不张拉。",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)基础知识","建筑工程",0]