[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1267813":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1267813,855,1,"单选题","城镇道路土质路基压实原则。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","先轻后重、先静后振、先低后高、先快后慢、轮迹重叠",false,{"key":16,"text":17,"correct":14},"B","先重后轻、先静后振、先低后高、先慢后快、轮迹重叠",{"key":19,"text":20,"correct":21},"C","先轻后重、先静后振、先低后高、先慢后快、轮迹重叠",true,{"key":23,"text":24,"correct":14},"D","先轻后重、先静后振、先高后低、先慢后快、轮迹重叠","城镇道路土质路基压实应遵循的原则：“先轻后重、先静后振、先低后高、先慢后快、轮迹重叠。”",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)基础知识","建筑工程",0]