[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1267803":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1267803,855,1,"单选题","在工程实施阶段，关手施工图预算作用阐述有误的是。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","施工图预算是施工单位和项目部成本控制的主要依据",false,{"key":16,"text":17,"correct":14},"B","施工图预算是工程费用调整的依据",{"key":19,"text":20,"correct":21},"C","施工图预算对编制实施性施工组织设计作用基本不大",true,{"key":23,"text":24,"correct":14},"D","只有在出现重大设计变更、政策调整及不可抗力等情况下方可调整施工图预算","市政公用工程大多采用施工图预算控制成本支出。在施工成本目标控制中，可按施工图预算实行“以收定支”，或者叫“量人为出”，最有效的方法之一。可借鉴的具体方法如下：（1）人工费的控制；（2）材料费的控制；（3）支脚手架、模板等周转设备使用费的控制；（4）施工机械使用费的控制；（5）构件加工费和分包工程费的控制等。",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)基础知识","建筑工程",0]