[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1267767":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1267767,855,1,"单选题","预应力混凝土连续梁悬臂浇筑施工中，顶、腹板纵向预应力筋的张拉顺序一般为（ ）张拉，设计有要求时按设计要求。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","上左、下右对称",false,{"key":16,"text":17,"correct":14},"B","左右对称",{"key":19,"text":20,"correct":14},"C","右上、左下对称",{"key":22,"text":23,"correct":24},"D","上下、左右对称",true,"腹板纵向预应力筋的张拉顺序一般为上下、左右对称张拉，设计有要求时按设计要求。",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)基础知识","建筑工程",0]