[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1267677":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1267677,855,1,"单选题","下列有关工程量计算错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","计算单位要和套用的定额项目的计算单位一致",false,{"key":16,"text":17,"correct":18},"B","相同计量单位只有一种计算方法",true,{"key":20,"text":21,"correct":14},"C","注意计算包括的范围",{"key":23,"text":24,"correct":14},"D","注意标准要符合定额的规定","工程量的计算必须符合概预算定额规定的计算规则和方法，应注意：计算单位要和套用的定额项目的计算单位一致；相同计量单位有不同的计算方法；注意计算包括的范围；注意标准要符合定额的规定。",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)基础知识","建筑工程",0]