[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1267675":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1267675,855,1,"单选题","工程量均以施工图为准计算，下列说法错误的是：（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","砌筑按计算体积，以立方米计算抹灰和勾缝",true,{"key":16,"text":17,"correct":18},"B","各种井的预制构件以实体积计算",false,{"key":20,"text":21,"correct":18},"C","井、渠垫层、基础按实体积以立方米计算",{"key":23,"text":24,"correct":18},"D","沉降缝应区分材质，按沉降缝的断面积或铺设长分别以平方米和米计算","工程量均以施工图为准计算：砌筑按计算体积，以立方米计算抹灰，勾缝以平方米计算；各种井的预制构件以实体积计算；井、渠垫层、基础按实体积以立方米计算；沉降缝应区分材质，按沉降缝的断面积或铺设长分别以平方米和米计算。",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)基础知识","建筑工程",0]