[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1267546":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1267546,855,1,"单选题","下列不属于顶管测量的内容有（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","设置顶管中线控制桩",false,{"key":16,"text":17,"correct":14},"B","设置临时水准点",{"key":19,"text":20,"correct":21},"C","边线测量",true,{"key":23,"text":24,"correct":14},"D","高程测量","顶管施工测量：①顶管测量的准备工作（设置顶管中线控制粧；引测控制粧；设置临时水准点；安装导轨或方木）②中线测量③高程测量",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)基础知识","建筑工程",0]