[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1267541":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1267541,855,1,"单选题","下列不属于地下管线施工测量的内容有（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","主点桩的检查与测设",false,{"key":16,"text":17,"correct":18},"B","路缘石的测设",true,{"key":20,"text":21,"correct":14},"C","控制桩测设",{"key":23,"text":24,"correct":14},"D","管道中线及高程施工测量","地下管线施工测量：主点桩的检查与测设；检查井位的测设；控制桩测设；管道中线及高程施工测量",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)基础知识","建筑工程",0]