[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1267427":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1267427,855,1,"单选题","下列不属于桥梁施工测量主要任务是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","控制网的建立或复测，检查和施工控制点的加密",false,{"key":16,"text":17,"correct":18},"B","补充施工过程中所需要的边线桩，根据施工条件布设水准点",true,{"key":20,"text":21,"correct":14},"C","测定墩、台的中线和基础桩的中线位置",{"key":23,"text":24,"correct":14},"D","测定并检查各施工部位的平面位置、高程、几何尺寸等","桥梁施工测量主要任务是：控制网的建立或复测，检查和施工控制点的加密；补充施工过程中所需要的中线粧；根据施工条件布设水准点；测定墩、台的中线和基础桩的中线位置；测定并检查各施工部位的平面位置、髙程、几何尺寸等。",{"id":6,"name":27,"category":28,"favorite":29},"(市政质量)基础知识","建筑工程",0]