[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-854-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":599},{"id":5,"name":6,"category":7,"favorite":8},854,"(设备安装质量)专业管理实务 岗位知识","建筑工程",0,9,50,1024,[13,34,46,58,70,82,94,106,118,130,141,153,165,177,189,201,213,225,237,249,261,273,285,297,309,321,333,343,355,367,379,390,402,414,422,430,442,454,466,477,489,501,513,525,533,545,555,567,579,591],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},1266664,1,"单选题","工程文件中文字材料幅面尺寸规格宜为（ ）幅面",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","A4",true,{"key":24,"text":25,"correct":26},"B","A2",false,{"key":28,"text":29,"correct":26},"C","A3",{"key":31,"text":32,"correct":26},"D","A5","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1266665,"施工单位的工程质量验收记录应由（ ）填写。",[38,40,42,44],{"key":20,"text":39,"correct":26},"项目经理",{"key":24,"text":41,"correct":22},"质量员",{"key":28,"text":43,"correct":26},"资料员",{"key":31,"text":45,"correct":26},"技术负责人",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1266666,"隐藏工程记录包含（ ）。。",[50,52,54,56],{"key":20,"text":51,"correct":22},"隐藏的部位，查阅各专业施工图纸",{"key":24,"text":53,"correct":26},"检验批的质量验收记录包括检验批的划分，按施工组织设计确定的方案进行",{"key":28,"text":55,"correct":26},"检验批完工时间、检查时间安排与施工员沟通，确定实施检查时间",{"key":31,"text":57,"correct":26},"检验批的质量检查标准，按相关专业施工质量规范规定进行",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},1266667,"由专业承包单位施工的分部（分项）工程或专项工程的施工方案，应由专业承包单位技术负责人或技术负责人授权的技术人员（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"编写",{"key":24,"text":65,"correct":26},"审核",{"key":28,"text":67,"correct":22},"审批",{"key":31,"text":69,"correct":26},"审查",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1266668,"《房屋建筑和市政基础设施工程竣工验收规定》规定工程竣工验收由（ ）负责组织实施。",[74,76,78,80],{"key":20,"text":75,"correct":26},"工程质量监督机构",{"key":24,"text":77,"correct":22},"建设单位",{"key":28,"text":79,"correct":26},"监理单位",{"key":31,"text":81,"correct":26},"施工单位",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},1266669,"不属于主要施工管理计划的有（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":26},"进度管理计划",{"key":24,"text":89,"correct":26},"成本管理计划",{"key":28,"text":91,"correct":26},"环境管理计划",{"key":31,"text":93,"correct":22},"绿色施工管理计划",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},1266670,"事中质量控制的策略是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"全面控制施工过程，重点控制工序质量",{"key":24,"text":101,"correct":26},"做好施工准备工作，且施工准备工作要贯穿施工全过程中",{"key":28,"text":103,"correct":26},"工序交接有对策",{"key":31,"text":105,"correct":26},"质量文件有档案",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},1266671,"监督检查要有重点是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"指施工的关键部位、作业的特殊工序、计划方案问题发生机率大的方向",{"key":24,"text":113,"correct":26},"指工程的关键部位、作业的特殊工序、计划方案问题发生机率大的方向",{"key":28,"text":115,"correct":22},"指工程的关键部位、作业的特殊工序、质量问题发生机率大的方向",{"key":31,"text":117,"correct":26},"指施工的关键部位、作业的特殊工序、质量问题发生机率大的方向",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1266672,"影响工程质量的环境因素较多，有（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"工程技术环境、工程管理环境和劳动环境",{"key":24,"text":125,"correct":26},"工程技术环境、工程管理环境和作业环境",{"key":28,"text":127,"correct":26},"工程施工环境、工程管理环境和劳动环境",{"key":31,"text":129,"correct":26},"工程施工技术环境、工程管理环境和作业环境",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},1266673,"事故处理方案确定后，由（ ）指令施工单位按既定的处理方案实施对质量缺",[134,135,137,139],{"key":20,"text":81,"correct":26},{"key":24,"text":136,"correct":22},"监理工程师",{"key":28,"text":138,"correct":26},"业主",{"key":31,"text":140,"correct":26},"事故调查组",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":24,"analysis":33},1266674,"施工企业对已具有成熟的分项工程级的工艺标准情况下和采用（ ）情况下，要区别对待编制质量计划的要求。",[145,147,149,151],{"key":20,"text":146,"correct":26},"新规范",{"key":24,"text":148,"correct":22},"“四新”",{"key":28,"text":150,"correct":26},"新技术",{"key":31,"text":152,"correct":26},"新设备",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":28,"analysis":33},1266675,"判定准确性的标准是（ ）。",[157,159,161,163],{"key":20,"text":158,"correct":26},"资料所反映的内容相一致",{"key":24,"text":160,"correct":26},"同一类资料中内容应一致",{"key":28,"text":162,"correct":22},"资料所反映的对象相一致和同一类资料中内容应一致",{"key":31,"text":164,"correct":26},"资料所反映的内容相一致和同一类资料中内容应一致",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":20,"analysis":33},1266676,"工程事故发生后，首先应查明原因、落实措施、妥善处理、消除隐患、界定责任，其中，最核心、最关键的是（ ）。",[169,171,173,175],{"key":20,"text":170,"correct":22},"查明原因",{"key":24,"text":172,"correct":26},"妥善处理",{"key":28,"text":174,"correct":26},"消除隐患",{"key":31,"text":176,"correct":26},"界定责任",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":24,"analysis":33},1266677,"ZC-8接地电阻测量仪使用注意事项有：接地极、电位探测针、电流探测针三者成一直线，（ ）居中，三者等距，均为20m。",[181,183,185,187],{"key":20,"text":182,"correct":26},"接地极",{"key":24,"text":184,"correct":22},"电位探测针",{"key":28,"text":186,"correct":26},"电流探测针",{"key":31,"text":188,"correct":26},"接地极和电流探测针",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},1266678,"影响工程质量控制的因素主要有（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":26},"施工人员、施工用机械和施工用材料",{"key":24,"text":196,"correct":22},"施工人员、施工用机械、施工的材料、施工用方法和施工作业环境",{"key":28,"text":198,"correct":26},"施工用机械、施工用材料、施工的方法和施工作业环境",{"key":31,"text":200,"correct":26},"施工人员、施工用机械、施工用材料和施工作业环境",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":31,"analysis":33},1266679,"施工企业首次采用“四新”技术，需要在质量计划中编写技术要求和（ ）两大部分。",[205,207,209,211],{"key":20,"text":206,"correct":26},"设计要求",{"key":24,"text":208,"correct":26},"施工要求",{"key":28,"text":210,"correct":26},"验收要求",{"key":31,"text":212,"correct":22},"管理要求",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":20,"analysis":33},1266680,"质量计划编制的主要内容，主要的施工方案不包括（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"主要主项工程施工工艺及工序的确定，样板区的选定",{"key":24,"text":220,"correct":26},"主要的施工机械的选配",{"key":28,"text":222,"correct":26},"季节性施工的步骤和防台防雨措施",{"key":31,"text":224,"correct":26},"构件配件的加工订货或自行制作的选定",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":24,"analysis":33},1266681,"消防法规有关规定，未经消防验收合格的工程（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":26},"可以投入使用",{"key":24,"text":232,"correct":22},"不可以投入使用",{"key":28,"text":234,"correct":26},"只要质量满足要求，可以不经消防验收",{"key":31,"text":236,"correct":26},"不可以用于居住楼房，其他公共楼房可以使用",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},1266682,"停止点的概念：所有的（ ）。",[241,243,245,247],{"key":20,"text":242,"correct":26},"开工点、检查点、停止点等“点”的称谓",{"key":24,"text":244,"correct":22},"控制点、检查点、停止点等“点”的称谓",{"key":28,"text":246,"correct":26},"控制点、检查点、结束点等“点”的称谓",{"key":31,"text":248,"correct":26},"控制点、审核点、停止点等“点”的称谓",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":24,"analysis":33},1266683,"分项工程质量计划的编制需要建立组织，目的在于明确分工、落实责任、（ ）、说明编制要求。",[253,255,257,259],{"key":20,"text":254,"correct":26},"审核批复",{"key":24,"text":256,"correct":22},"确定负责人",{"key":28,"text":258,"correct":26},"内部初审",{"key":31,"text":260,"correct":26},"修正改进",{"id":262,"libraryId":5,"type":15,"typeLabel":16,"stem":263,"options":264,"answer":28,"analysis":33},1266684,"质量计划编制的主要内容，施工部署不包括（ ）。",[265,267,269,271],{"key":20,"text":266,"correct":26},"确定施工进度计划、质量和安全目标",{"key":24,"text":268,"correct":26},"确定环境保护和降低施工成本措施",{"key":28,"text":270,"correct":22},"加快事故进度",{"key":31,"text":272,"correct":26},"确定施工顺序和施工组织管理体系",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":31,"analysis":33},1266685,"为了解决国际间质量争端，消除和减少技术壁垒，有效地开展国际贸易，加强国际间技术合作国际标准化组织于1987年发布了（ ）族质量管理与质量保证标准。",[277,279,281,283],{"key":20,"text":278,"correct":26},"ISO8900",{"key":24,"text":280,"correct":26},"ISO9900",{"key":28,"text":282,"correct":26},"ISO9800",{"key":31,"text":284,"correct":22},"ISO9000",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":31,"analysis":33},1266686,"每一个质量控制具体方法本身也有一个持续改进的问题，就要用（ ）循环原理，在实践中使质量控制得到不断提高。",[289,291,293,295],{"key":20,"text":290,"correct":26},"看、摸、敲、照四个字",{"key":24,"text":292,"correct":26},"目测法、实测法和试验法三种",{"key":28,"text":294,"correct":26},"靠、吊、量、套四个字",{"key":31,"text":296,"correct":22},"计划、实施、检查和改进",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":24,"analysis":33},1266687,"发生质量事故基本上是违反了施工质量验收规范的主控项目的规定，一般的质量缺陷基本上是违反了（ ）。",[301,303,305,307],{"key":20,"text":302,"correct":26},"施工质量验收规范中的总项目的有关观感的规定",{"key":24,"text":304,"correct":22},"施工质量验收规范中的一般项目的有关观感的规定",{"key":28,"text":306,"correct":26},"施工质量验收规范的一般项目的规定",{"key":31,"text":308,"correct":26},"施工质量验收规范的主控项目的规定",{"id":310,"libraryId":5,"type":15,"typeLabel":16,"stem":311,"options":312,"answer":20,"analysis":33},1266688,"执行计划要职责分工，各负其责。执行前要（ ）。",[313,315,317,319],{"key":20,"text":314,"correct":22},"宣传、交底、取得共同的理解和认同",{"key":24,"text":316,"correct":26},"宣传、交底、取得共同的认识和认同",{"key":28,"text":318,"correct":26},"宣传、分工、取得共同的理解和认同",{"key":31,"text":320,"correct":26},"宣传、分工、取得共同的认识和认同",{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":28,"analysis":33},1266689,"启动排烟风机后，排烟口的风速宜为（ ）。",[325,327,329,331],{"key":20,"text":326,"correct":26},"2m\u002Fs～4m\u002Fs",{"key":24,"text":328,"correct":26},"3m\u002Fs～3.5m\u002Fs",{"key":28,"text":330,"correct":22},"3m\u002Fs～4m\u002Fs",{"key":31,"text":332,"correct":26},"2m\u002Fs～3m\u002Fs",{"id":334,"libraryId":5,"type":15,"typeLabel":16,"stem":335,"options":336,"answer":24,"analysis":33},1266690,"施工单位的工程质量验收记录应由（ ）填写，质量检查员必须在现场检查和资料核查的基础上填写验收记录，应签字和加盖岗位证章，对验收文件资料负责，并负责工程验收资料的收集、整理。其他签字人员的资格应符合《建筑工程施工质量验收统一标准》GB50300的规定。",[337,338,340,342],{"key":20,"text":43,"correct":26},{"key":24,"text":339,"correct":22},"工程质量检查员",{"key":28,"text":341,"correct":26},"质量负责人",{"key":31,"text":45,"correct":26},{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":20,"analysis":33},1266691,"中标后、开工前项目部的关键是（ ）。",[347,349,351,353],{"key":20,"text":348,"correct":22},"工程质量目标的实现",{"key":24,"text":350,"correct":26},"编制实施性的施工组织计划",{"key":28,"text":352,"correct":26},"使进度、质量、成本和安全的各项指标能实现",{"key":31,"text":354,"correct":26},"制定并实现工程项目的质量目标",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":20,"analysis":33},1266692,"为了整齐反映接地电阻值，通常要测量至少（ ）次，取平均值。",[359,361,363,365],{"key":20,"text":360,"correct":22},"2",{"key":24,"text":362,"correct":26},"3",{"key":28,"text":364,"correct":26},"4",{"key":31,"text":366,"correct":26},"5",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":28,"analysis":33},1266693,"不属于试运行中使用的仪器、仪表的要求（ ）",[371,373,375,377],{"key":20,"text":372,"correct":26},"符合试运行中检测工作要求",{"key":24,"text":374,"correct":26},"精度等级、量程等技术指标符合被测量的需要",{"key":28,"text":376,"correct":22},"试运行所需的电力、供水、供气均接入到位",{"key":31,"text":378,"correct":26},"显示部分如指针或数字清晰可辨",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":31,"analysis":33},1266694,"质量问题处理的目的不包括（ ）。",[383,385,387,389],{"key":20,"text":384,"correct":26},"正确分析和妥善处理所发生的质量问题，以创造正常的施工条件",{"key":24,"text":386,"correct":26},"保证建筑物、构筑物和安装工程的安全使用，减少事故的损失",{"key":28,"text":388,"correct":26},"总结经验教训，预防事故重复发生",{"key":31,"text":101,"correct":22},{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":20,"analysis":33},1266695,"不属于事中质量控制的具体措施是（ ）。",[394,396,398,400],{"key":20,"text":395,"correct":22},"控制施工有重点",{"key":24,"text":397,"correct":26},"质量处理有复查",{"key":28,"text":399,"correct":26},"材料代换有制度",{"key":31,"text":401,"correct":26},"设计变更有手续",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":20,"analysis":33},1266696,"施工方案以（ ）为对象。",[406,408,410,412],{"key":20,"text":407,"correct":22},"施工方案，以技术难度较大、采用新工艺或新材料的分部或分项工程为对象",{"key":24,"text":409,"correct":26},"有多个单位工程组成的项目",{"key":28,"text":411,"correct":26},"单位工程",{"key":31,"text":413,"correct":26},"两个以上五个以下单位工程组成的项目",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":31,"analysis":33},1266697,"离心水泵单机试运行时，在额定工况下连续运行时间不少于（ ）h。",[418,419,420,421],{"key":20,"text":362,"correct":26},{"key":24,"text":364,"correct":26},{"key":28,"text":366,"correct":26},{"key":31,"text":360,"correct":22},{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":20,"analysis":33},1266698,"目测法手段可归纳（ ）",[426,427,428,429],{"key":20,"text":290,"correct":22},{"key":24,"text":292,"correct":26},{"key":28,"text":294,"correct":26},{"key":31,"text":296,"correct":26},{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":24,"analysis":33},1266699,"物资部门主要职责不包括（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":26},"做好事前质量控制的物资准备工作",{"key":24,"text":437,"correct":22},"对新技术、新工艺、新材料等的应用编制质量控制指导性文件，并参与推广",{"key":28,"text":439,"correct":26},"保持施工机械完好状态",{"key":31,"text":441,"correct":26},"保持检测用仪器、仪表在使用有效期内",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":28,"analysis":33},1266700,"初步设计文件，符合规划、环境等要求，设计规范等属于设计交底中的（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":26},"施工注意事项",{"key":24,"text":449,"correct":26},"设计意图",{"key":28,"text":451,"correct":22},"施工图设计依据",{"key":31,"text":453,"correct":26},"自然条件",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":28,"analysis":33},1266701,"金属及复合管在试验压力下，观察（ ）min，压力降不大于（ ）MP A，然后降到工作压力进行检查，以不渗漏为合格。",[458,460,462,464],{"key":20,"text":459,"correct":26},"9，0.02",{"key":24,"text":461,"correct":26},"9，0.05",{"key":28,"text":463,"correct":22},"10，0.02",{"key":31,"text":465,"correct":26},"10，0.05",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":31,"analysis":33},1266702,"不属于有形产品的是（ ）。",[470,472,474,475],{"key":20,"text":471,"correct":26},"设备",{"key":24,"text":473,"correct":26},"预制构件",{"key":28,"text":7,"correct":26},{"key":31,"text":476,"correct":22},"维修",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":31,"analysis":33},1266703,"离心水泵单机试运行时，要注意泵启动后，排水管阀门的关闭时间一般不应超过（ ）min。",[481,483,485,487],{"key":20,"text":482,"correct":26},"3～4",{"key":24,"text":484,"correct":26},"3～3.5",{"key":28,"text":486,"correct":26},"2.5～3",{"key":31,"text":488,"correct":22},"2～3",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":20,"analysis":33},1266704,"质量计划编制的主要内容，确定各项管理体系的流程和措施不包括（ ）。",[493,495,497,499],{"key":20,"text":494,"correct":22},"员工培训措施",{"key":24,"text":496,"correct":26},"技术措施",{"key":28,"text":498,"correct":26},"组织措施",{"key":31,"text":500,"correct":26},"质量保证措施和安全施工措施",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":20,"analysis":33},1266705,"分项工程或分部工程要依据（ ）和业主的意见编专门的质量计划。",[505,507,509,511],{"key":20,"text":506,"correct":22},"工程的实际需要",{"key":24,"text":508,"correct":26},"政府的需要",{"key":28,"text":510,"correct":26},"城市规划要求",{"key":31,"text":512,"correct":26},"监理的要求",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":28,"analysis":33},1266706,"防排烟系统的主要功能之一的标志（ ）。",[517,519,521,523],{"key":20,"text":518,"correct":26},"当任何一个排烟口或排烟阀开启时，排烟风机应能手动启动，同时应能立即关闭着火区的通风空调系统",{"key":24,"text":520,"correct":26},"当任何一个排烟口或排烟阀开启时，排烟风机应能自动启动，同时应不能立即关闭着火区的通风空调系统",{"key":28,"text":522,"correct":22},"当任何一个排烟口或排烟阀开启时，排烟风机应能自动启动，同时应能立即关闭着火区的通风空调系统",{"key":31,"text":524,"correct":26},"当任何一个排烟口或排烟阀开启时，排烟风机应能手动启动，同时应不能立即关闭着火区的通风空调系统",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":31,"analysis":33},1266707,"发生质量事故基本上是违反了（ ）。",[529,530,531,532],{"key":20,"text":302,"correct":26},{"key":24,"text":304,"correct":26},{"key":28,"text":306,"correct":26},{"key":31,"text":308,"correct":22},{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":31,"analysis":33},1266708,"质量计划编制的主要内容，施工准备计划不包括（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":26},"技术准备",{"key":24,"text":540,"correct":26},"物资准备",{"key":28,"text":542,"correct":26},"劳动组织准备",{"key":31,"text":544,"correct":22},"施工方案准备",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":28,"analysis":33},1266709,"中标后、开工前项目部的核心是（ ）",[549,550,552,553],{"key":20,"text":348,"correct":26},{"key":24,"text":551,"correct":26},"编制实施的施工组织设计",{"key":28,"text":352,"correct":22},{"key":31,"text":554,"correct":26},"确定质量目标",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":28,"analysis":33},1266710,"火灾探测器运行时指示灯会闪烁红色表示正常，其朝向（ ）",[559,561,563,565],{"key":20,"text":560,"correct":26},"不做要求",{"key":24,"text":562,"correct":26},"背离房间入口",{"key":28,"text":564,"correct":22},"客房的入口处",{"key":31,"text":566,"correct":26},"垂直向下",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":28,"analysis":33},1266711,"施工中发生事故时，（ ）应当采取紧急措施减少人员伤亡和事故损失，并按照国家有关规定及时向有关部门报告。",[571,573,575,577],{"key":20,"text":572,"correct":26},"建设单位负责人",{"key":24,"text":574,"correct":26},"监理单位负责人",{"key":28,"text":576,"correct":22},"施工单位负责人",{"key":31,"text":578,"correct":26},"事故现场有关人员",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":28,"analysis":33},1266712,"项目质量体系文件不包括（ ）。",[583,585,587,589],{"key":20,"text":584,"correct":26},"管理性文件",{"key":24,"text":586,"correct":26},"纲领性文件",{"key":28,"text":588,"correct":22},"施工性文件",{"key":31,"text":590,"correct":26},"执行性文件",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":28,"analysis":33},1266713,"实测法，实测检查法的手段可归纳为（ ）。",[595,596,597,598],{"key":20,"text":290,"correct":26},{"key":24,"text":292,"correct":26},{"key":28,"text":294,"correct":22},{"key":31,"text":296,"correct":26},[600,603,606,609,612,615],{"id":15,"name":601,"category":7,"favorite":602},"领导干部任职前廉政法规知识测试题",92,{"id":604,"name":605,"category":7,"favorite":15},595,"建筑结构与设备",{"id":607,"name":608,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":610,"name":611,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":613,"name":614,"category":7,"favorite":8},534,"BIM工程师",{"id":616,"name":614,"category":7,"favorite":8},535]