[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-854-8":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":607},{"id":5,"name":6,"category":7,"favorite":8},854,"(设备安装质量)专业管理实务 岗位知识","建筑工程",0,8,50,1024,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,417,429,440,452,464,476,488,500,512,524,532,544,552,564,576,586,598],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1266613,1,"单选题","满足质量计划中技术部分要求的工艺标准的文件，可直接在（ ）中知名采用的标准代号。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","设计计划",false,{"key":24,"text":25,"correct":22},"B","施工计划",{"key":27,"text":28,"correct":29},"C","质量计划",true,{"key":31,"text":32,"correct":22},"D","验收计划","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1266614,"中标后、开工前项目部首先要做的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"制定并实现工程项目的质量目标",{"key":24,"text":41,"correct":29},"编制实施性的施工组织计划",{"key":27,"text":43,"correct":22},"使进度、质量、成本和安全的各项指标能实现",{"key":31,"text":45,"correct":22},"工程质量目标的实现",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},1266615,"分项工程质量计划编制步骤中审核的目的是在专业上对（ ）和管理进行把关，审核中发现有缺陷要退还，指明修改意见，并对修改后的文件重审，直到同意确认为止。",[50,52,54,56],{"key":20,"text":51,"correct":29},"技术",{"key":24,"text":53,"correct":22},"设计",{"key":27,"text":55,"correct":22},"施工",{"key":31,"text":57,"correct":22},"验收",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},1266616,"建筑安装工程施工工程质量检查实行三检制，是指（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"作业人员的“自检”和专职质量员的“专检”、“互检”相结合的检查制度",{"key":24,"text":65,"correct":29},"作业人员的“自检”、“互检”和专职质量员的“专检”相结合的检查制度",{"key":27,"text":67,"correct":22},"作业人员的“互检”、“专检”和专职质量员的“自检”相结合的检查制度",{"key":31,"text":69,"correct":22},"作业人员的“自检”、“互检”和“专检”相结合的检查制度",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1266617,"空调冷冻水或冷却水的镀锌钢管的焊接质量缺陷主要是（ ）",[74,76,78,80],{"key":20,"text":75,"correct":22},"镀锌钢管材料不合格",{"key":24,"text":77,"correct":22},"环境因素影响",{"key":27,"text":79,"correct":29},"焊工的技术素质不高",{"key":31,"text":81,"correct":22},"镀锌钢管不配套",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},1266618,"通球试验时对排水主立管和水平干管的通畅性进行检测，用不小于内径（ ）的木质球或塑料球进管内，检查其是否能通过。",[86,88,90,92],{"key":20,"text":87,"correct":22},"3／4",{"key":24,"text":89,"correct":29},"2／3",{"key":27,"text":91,"correct":22},"1／2",{"key":31,"text":93,"correct":22},"3／5",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1266619,"检验批的质量验收记录包括（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"隐藏的部位，查阅各专业施工图纸",{"key":24,"text":101,"correct":29},"隐藏的时间，与施工员沟通作业计划的安排，并如期至作业面查核",{"key":27,"text":103,"correct":22},"检验批的质量检查标准，按相关专业施工质量规范规定进行",{"key":31,"text":105,"correct":22},"隐藏前检查或实验要求，查阅相关专业的施工质量验收规范",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},1266620,"质量管理的首要任务是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":29},"确定质量方针、目标和职责",{"key":24,"text":113,"correct":22},"建立有效的质量管理体系",{"key":27,"text":115,"correct":22},"质量策划、质量控制、质量保证和质量改进",{"key":31,"text":117,"correct":22},"确保质量方针、目标的实施和实现",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},1266621,"检查工序活动的结果，一旦发现问题，应采取的措施（ ）",[122,124,126,128],{"key":20,"text":123,"correct":22},"继续作业活动，在作业过程中解决问题",{"key":24,"text":125,"correct":22},"无视问题，继续作业活动",{"key":27,"text":127,"correct":29},"停止作业活动进行处理，直到符合要求",{"key":31,"text":129,"correct":22},"停止作业活动进行处理，不做任何处理",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1266622,"纲领性文件是指（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"项目依据实际需要定制的文件",{"key":24,"text":137,"correct":22},"处理质量事务工作的文件",{"key":27,"text":139,"correct":29},"企业制定的管理规定好程序文件",{"key":31,"text":141,"correct":22},"做好事前质量控制的物资准备工作的文件",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},1266623,"闭环管理原则即按计划、实施、（ ）、改进为顺序的循环原理。",[146,148,150,152],{"key":20,"text":147,"correct":22},"分析",{"key":24,"text":149,"correct":22},"内审",{"key":27,"text":151,"correct":29},"检查",{"key":31,"text":153,"correct":22},"批复",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":27,"analysis":33},1266625,"给水排水立管留洞位置失准属于（ ）阶段的控制失效",[158,160,162,164],{"key":20,"text":159,"correct":22},"施工准备阶段的前期",{"key":24,"text":161,"correct":22},"施工准备阶段的中期",{"key":27,"text":163,"correct":29},"施工准备阶段的后期",{"key":31,"text":165,"correct":22},"施工准备阶段的之前",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},1266626,"喷淋干管为卡箍式连接，属于柔性连接，柔性连接口是管道震动发生泄漏的薄弱环节，所以每个接口处至少有（ ）支架进行刚性固定，已消除或最大限度的减小接口处的振幅，以保运行中的安全。",[170,172,174,176],{"key":20,"text":171,"correct":29},"1",{"key":24,"text":173,"correct":22},"2",{"key":27,"text":175,"correct":22},"3",{"key":31,"text":177,"correct":22},"4",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},1266627,"为了整齐反映接地电阻值，两次测量的的探针连线在条件允许的情况下，互成（ ）角",[182,184,186,188],{"key":20,"text":183,"correct":22},"800",{"key":24,"text":185,"correct":22},"850",{"key":27,"text":187,"correct":29},"900",{"key":31,"text":189,"correct":22},"1000",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1266628,"质量问题的识别通常有以下（ ）环节。",[194,196,198,200],{"key":20,"text":195,"correct":22},"标准测量化；度量；比较；判定",{"key":24,"text":197,"correct":29},"标准具体化；度量；比较；判定",{"key":27,"text":199,"correct":22},"标准测量化；度量；校核；判定",{"key":31,"text":201,"correct":22},"标准具体化；度量；校核；判定",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},1266629,"质量员要备有已公开出版的各个专业（ ）",[206,208,210,212],{"key":20,"text":207,"correct":22},"质量检测手册",{"key":24,"text":209,"correct":22},"质量检查手册",{"key":27,"text":211,"correct":29},"质量通病防治手册",{"key":31,"text":213,"correct":22},"质量检测与通病防治手册",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},1266630,"一般的质量缺陷基本上是违反了（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"施工质量验收规范中的总项目的有关观感的规定",{"key":24,"text":221,"correct":29},"施工质量验收规范中的一般项目的有关观感的规定",{"key":27,"text":223,"correct":22},"施工质量验收规范的一般项目的规定",{"key":31,"text":225,"correct":22},"施工质量验收规范的主控项目的规定",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},1266631,"PP-R管熔接弯头或三通时要注意其方向，可以在管材或管件上做（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":29},"辅助标记线",{"key":24,"text":233,"correct":22},"尺寸标注",{"key":27,"text":235,"correct":22},"方向标注",{"key":31,"text":237,"correct":22},"尺寸界线",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},1266632,"施工阶段质量控制的目标是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"制定质量目标、规定过程和资源，以实现其目的",{"key":24,"text":245,"correct":22},"致力于提供质量要求得到满足的信任",{"key":27,"text":247,"correct":22},"增强满足质量要求的能力",{"key":31,"text":249,"correct":29},"确保工序质量合格；杜绝质量事故发生",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},1266633,"ISO9000族标准的基本要求，质量管理的中心任务是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"搞好质量管理的关键在领导",{"key":24,"text":257,"correct":29},"建立并实施文件化的管理体系并持续改进",{"key":27,"text":259,"correct":22},"满足顾客和组织内部双方的需求和利益",{"key":31,"text":261,"correct":22},"定期评价质量管理体系",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},1266634,"设备安装工程的施工试验分类从时间阶段划分（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":29},"施工准备阶段的施工试验",{"key":24,"text":269,"correct":22},"静态试验和施工准备阶段的施工试验",{"key":27,"text":271,"correct":22},"动态考核和施工准备阶段的施工试验",{"key":31,"text":273,"correct":22},"静态试验和动态考核",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},1266635,"建设工程竣工验收备案系指工程竣工验收合格后，依据《房屋建筑工程和市政基础设施工程竣工验收备案管理的规定》，（ ）在指定的期限内，将与工程有关的文件资料送交备案部门查验的过程。",[278,280,282,284],{"key":20,"text":279,"correct":29},"建设单位",{"key":24,"text":281,"correct":22},"监理单位",{"key":27,"text":283,"correct":22},"设计单位",{"key":31,"text":285,"correct":22},"施工单位",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":27,"analysis":33},1266636,"怎么解决风管的出风口在走廊、大厅等公共场所要与建筑装修设计和谐协调（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"只关心气流的组织",{"key":24,"text":293,"correct":22},"先取样作草图，有关各个专业共同评价确认就行",{"key":27,"text":295,"correct":29},"先取样作草图，有关各个专业共同评价确认，然后经业主认同",{"key":31,"text":297,"correct":22},"跟业主商量，经业主认同",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":27,"analysis":33},1266637,"运作程序是指（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"建立各岗位人员的责任制，使之按要求运作，确保项目质量目标的实现",{"key":24,"text":305,"correct":22},"处理质量事务工作的方法",{"key":27,"text":307,"correct":29},"处理质量事务工作的每个环节先后次序",{"key":31,"text":309,"correct":22},"处理质量事务工作的方法和处理质量事务工作的每个环节先后次序",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":27,"analysis":33},1266638,"属于建筑智能化工程（ ）",[314,316,318,320],{"key":20,"text":315,"correct":22},"制冷、制热设备试运行试验",{"key":24,"text":317,"correct":22},"给水管道强度、严密性试验",{"key":27,"text":319,"correct":29},"设备调试实验",{"key":31,"text":321,"correct":22},"消火栓试射试验",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},1266639,".塑料管在试验压力下，稳压1ｈ，压力降不大于0.05MP A，然后降到工作压力的（ ）倍，稳压2ｈ，压力降不大于0.03MP A，同时进行检查，以不渗漏为合格。",[326,328,330,332],{"key":20,"text":327,"correct":29},"1.15",{"key":24,"text":329,"correct":22},"1.25",{"key":27,"text":331,"correct":22},"1.30",{"key":31,"text":333,"correct":22},"1.35",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":31,"analysis":33},1266640,"施工项目质量控制主要的方法不包含（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":22},"审核有关技术文件和报告",{"key":24,"text":341,"correct":22},"直接进行现场检查",{"key":27,"text":343,"correct":22},"必要的试验",{"key":31,"text":345,"correct":29},"开工前检查",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":24,"analysis":33},1266641,"事前质量控制指在正式施工前的质量控制，其控制重点是（ ）",[350,352,354,356],{"key":20,"text":351,"correct":22},"全面控制施工过程，重点工序质量",{"key":24,"text":353,"correct":29},"做好施工准备工作，且施工准备工作要贯穿施工全过程中",{"key":27,"text":355,"correct":22},"工序交接有对策",{"key":31,"text":357,"correct":22},"质量文件有档案",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":24,"analysis":33},1266642,"现场进行质量检查的方法有（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"看、摸、敲、照四个字",{"key":24,"text":365,"correct":29},"目测法、实测法和试验法三种",{"key":27,"text":367,"correct":22},"靠、吊、量、套四个字",{"key":31,"text":369,"correct":22},"计划、实施、检查和改进",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},1266643,"检查又称（ ），目的是查验分项工程的质量工作是否按计划进行。",[374,376,378,380],{"key":20,"text":375,"correct":29},"跟踪检查",{"key":24,"text":377,"correct":22},"结果核查",{"key":27,"text":379,"correct":22},"验收检查",{"key":31,"text":381,"correct":22},"竣工检查",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":20,"analysis":33},1266644,"施工准备阶段的质量控制，属于（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":29},"事前控制",{"key":24,"text":389,"correct":22},"事中控制",{"key":27,"text":391,"correct":22},"事后控制",{"key":31,"text":393,"correct":22},"实时控制",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},1266645,"对已掌握质量管理基本知识中对质量问题的分类，质量员要明确了（ ）",[398,400,402,404],{"key":20,"text":399,"correct":29},"质量缺陷和质量事故的根本区别",{"key":24,"text":401,"correct":22},"质量缺陷和质量事故的相互关系",{"key":27,"text":403,"correct":22},"质量缺陷",{"key":31,"text":405,"correct":22},"质量事故",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":27,"analysis":33},1266646,"不属于ISO9000族标准的基本要求（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"过程控制的出发点是预防不合格",{"key":24,"text":413,"correct":22},"控制所有过程质量",{"key":27,"text":415,"correct":29},"做好事前质量控制的物资准备工作",{"key":31,"text":411,"correct":22},{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":27,"analysis":33},1266647,"设备和管道的保温层厚度大于（ ）mm时，应分两层或多层逐层施工。",[421,423,425,427],{"key":20,"text":422,"correct":22},"240",{"key":24,"text":424,"correct":22},"360",{"key":27,"text":426,"correct":29},"100",{"key":31,"text":428,"correct":22},"120",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":20,"analysis":33},1266648,"哪些镀锌钢导管有专有工具集备件作接地跨接连接（ ）。",[433,435,437,439],{"key":20,"text":434,"correct":29},"KBG和JDG",{"key":24,"text":436,"correct":22},"KAG和JAG",{"key":27,"text":438,"correct":22},"KAG和JDG",{"key":31,"text":438,"correct":22},{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":24,"analysis":33},1266649,"（ ）是指造成10人以上30人以下死亡，或者50人以上100人以下重伤，或者5000万元以上1亿元以下直接经济损失的事故。",[444,446,448,450],{"key":20,"text":445,"correct":22},"特别重大事故",{"key":24,"text":447,"correct":29},"重大事故",{"key":27,"text":449,"correct":22},"较大事故",{"key":31,"text":451,"correct":22},"一般事故",{"id":453,"libraryId":5,"type":15,"typeLabel":16,"stem":454,"options":455,"answer":20,"analysis":33},1266650,"某工程在施工的过程中，地下水位比较高，若在雨季进行基坑开挖，遇到连续降雨或排水困难，就会引起基坑塌方或地基受水浸泡影响承载力，这属于（ ）对工程质量的影响。",[456,458,460,462],{"key":20,"text":457,"correct":29},"现场自然环境因素",{"key":24,"text":459,"correct":22},"施工质量管理环境因素",{"key":27,"text":461,"correct":22},"施工作业环境因素",{"key":31,"text":463,"correct":22},"方法的因素",{"id":465,"libraryId":5,"type":15,"typeLabel":16,"stem":466,"options":467,"answer":27,"analysis":33},1266651,"PP-R管在各配水点、受力点、穿墙只管节点等处，均应有（ ）或支架固定。",[468,470,472,474],{"key":20,"text":469,"correct":22},"法兰",{"key":24,"text":471,"correct":22},"螺栓",{"key":27,"text":473,"correct":29},"管卡",{"key":31,"text":475,"correct":22},"接头",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":20,"analysis":33},1266652,"监控室的嵌入式显示屏柜通风不良应采取合理措施（ ）",[480,482,484,486],{"key":20,"text":481,"correct":29},"柜的两侧和背部设置百叶式通风口",{"key":24,"text":483,"correct":22},"用新的显示屏代替",{"key":27,"text":485,"correct":22},"去掉显示屏柜",{"key":31,"text":487,"correct":22},"不做处理，由于通风不良应不影响显示屏的正常工作",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":24,"analysis":33},1266653,"当设计未注明时各种材质的给水管，其试压压力均为工作压力的1.5倍，但不小于（ ）MPA",[492,494,496,498],{"key":20,"text":493,"correct":22},"0.03",{"key":24,"text":495,"correct":29},"0.6",{"key":27,"text":497,"correct":22},"0.05",{"key":31,"text":499,"correct":22},"0.04",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":31,"analysis":33},1266654,"质量资料收集的原则（ ）。",[504,506,508,510],{"key":20,"text":505,"correct":22},"及时参与施工活动",{"key":24,"text":507,"correct":22},"保持与工程进度同步",{"key":27,"text":509,"correct":22},"认真把关",{"key":31,"text":511,"correct":29},"整理中对作业队组提供的资料有疑问不要涂改，应找提供者澄清",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":24,"analysis":33},1266655,"项目部组织结构的设置及人员配备不能适应工程项目施工管理和施工作业的需求是属于哪方面的原因（ ）",[516,518,520,522],{"key":20,"text":517,"correct":22},"缺乏质量意识",{"key":24,"text":519,"correct":29},"管理混乱",{"key":27,"text":521,"correct":22},"施工准备不充分",{"key":31,"text":523,"correct":22},"缺少监督机制",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":24,"analysis":33},1266656,"路径程序是指（ ）。",[528,529,530,531],{"key":20,"text":303,"correct":22},{"key":24,"text":305,"correct":29},{"key":27,"text":307,"correct":22},{"key":31,"text":309,"correct":22},{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":31,"analysis":33},1266657,"正压送风机启动后，楼梯间、前室、走道风雅呈递减趋势，前室、合用前室、消防电梯前室、封闭的避难层为（ ）。",[536,538,540,542],{"key":20,"text":537,"correct":22},"20PA～30PA",{"key":24,"text":539,"correct":22},"40PA～50PA",{"key":27,"text":541,"correct":22},"25PA～35PA",{"key":31,"text":543,"correct":29},"25PA～30PA",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":31,"analysis":33},1266658,"从试验状态划分，设备安装工程试验划分为（ ）。",[548,549,550,551],{"key":20,"text":267,"correct":22},{"key":24,"text":269,"correct":22},{"key":27,"text":271,"correct":22},{"key":31,"text":273,"correct":29},{"id":553,"libraryId":5,"type":15,"typeLabel":16,"stem":554,"options":555,"answer":20,"analysis":33},1266659,"影响质量的直接因素是（ ）",[556,558,560,562],{"key":20,"text":557,"correct":29},"环境因素",{"key":24,"text":559,"correct":22},"人为因素",{"key":27,"text":561,"correct":22},"环境因素和人为因素",{"key":31,"text":563,"correct":22},"材料因素",{"id":565,"libraryId":5,"type":15,"typeLabel":16,"stem":566,"options":567,"answer":27,"analysis":33},1266660,"施工项目质量管理的事中控制是指对施工过程中进行的所有与施工有关方面的质量控制，也包括在施工过程中通过巡视、旁站等措施检查各道（ ）。",[568,570,572,574],{"key":20,"text":569,"correct":22},"材料",{"key":24,"text":571,"correct":22},"施工成品",{"key":27,"text":573,"correct":29},"工序质量",{"key":31,"text":575,"correct":22},"中间产品",{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":24,"analysis":33},1266661,"中标后、开工前项目部首先要做的是（ ）",[580,581,583,584],{"key":20,"text":45,"correct":22},{"key":24,"text":582,"correct":29},"编制实施的施工组织设计",{"key":27,"text":43,"correct":22},{"key":31,"text":585,"correct":22},"确定质量目标",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":24,"analysis":33},1266662,"施工组织总设计以（ ）为对象。",[590,592,594,596],{"key":20,"text":591,"correct":22},"施工方案，以技术难度交底、采用新工艺或新材料的分部或分项工程为对象",{"key":24,"text":593,"correct":29},"有多个单位工程组成的项目",{"key":27,"text":595,"correct":22},"单位工程",{"key":31,"text":597,"correct":22},"两个以上五个以下单位工程组成的项目",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":27,"analysis":33},1266663,"施工组织设计以（ ）为对象。",[602,604,605,606],{"key":20,"text":603,"correct":22},"施工方案，以技术难度较大、采用新工艺或新材料的分部或分项工程为对象",{"key":24,"text":593,"correct":22},{"key":27,"text":595,"correct":29},{"key":31,"text":597,"correct":22},[608,611,614,617,620,623],{"id":15,"name":609,"category":7,"favorite":610},"领导干部任职前廉政法规知识测试题",92,{"id":612,"name":613,"category":7,"favorite":15},595,"建筑结构与设备",{"id":615,"name":616,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":618,"name":619,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":621,"name":622,"category":7,"favorite":8},534,"BIM工程师",{"id":624,"name":622,"category":7,"favorite":8},535]