[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-854-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":588},{"id":5,"name":6,"category":7,"favorite":8},854,"(设备安装质量)专业管理实务 岗位知识","建筑工程",0,7,50,1024,[13,34,46,58,70,82,92,100,109,119,131,143,155,167,179,187,199,211,222,234,243,255,267,279,291,300,312,324,334,346,358,370,382,394,406,418,426,438,450,462,474,486,494,506,518,530,541,553,565,577],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1266563,1,"单选题","下列（ ）不符合智能建筑工程检测结论与处理的相关规定。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","检测结论应分为合格和不合格",false,{"key":24,"text":25,"correct":22},"B","主控项目有一项及以上不合格的，系统检测结论应为不合格；一般项目有两项及以上不合格的，系统检测结论应为不合格",{"key":27,"text":28,"correct":22},"C","被集成系统接口检测不合格的，被集成系统和集成系统的系统检测结论均应为不合格",{"key":30,"text":31,"correct":32},"D","系统检测不合格时，应限期对不合格项进行整改，对整改后的项目重新检测，直至检测合格",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1266564,"检测智能化集成系统集中监视、储存和统计功能时，每个被集成系统的抽检数量宜为该系统信息点数的（ ），且抽检点数不应少于20点，当信息点数少于20点时应全部检测；能化集成系统抽检总点数不宜超过1000点；抽检结果全部符合设计要求的，应为检测合格。",[38,40,42,44],{"key":20,"text":39,"correct":32},"5％",{"key":24,"text":41,"correct":22},"10％",{"key":27,"text":43,"correct":22},"20％",{"key":30,"text":45,"correct":22},"100％",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},1266565,"无线接人认证的控制策略应符合设计要求，并应按设计要求的认证方式进行检测，且应抽取网络覆盖区域内不同地点进行（ ）次认证。认证失败次数不超过1次的，应为检测合格。",[50,52,54,56],{"key":20,"text":51,"correct":22},"5",{"key":24,"text":53,"correct":22},"10",{"key":27,"text":55,"correct":22},"15",{"key":30,"text":57,"correct":32},"20",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1266566,"会议系统功能检测应采用（ ）的方法，根据设计要求逐项检测。",[62,64,66,68],{"key":20,"text":63,"correct":32},"现场模拟",{"key":24,"text":65,"correct":22},"客观测量",{"key":27,"text":67,"correct":22},"主观评价",{"key":30,"text":69,"correct":22},"仪器测量",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":27,"analysis":33},1266567,"安全技术防范系统子系统功能应按设计要求（ ）检测。",[74,76,78,80],{"key":20,"text":75,"correct":22},"随机",{"key":24,"text":77,"correct":22},"抽样",{"key":27,"text":79,"correct":32},"逐项",{"key":30,"text":81,"correct":22},"按比例",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1266568,"公共照明监控系统的功能检测应按照明回路总数的（ ）抽检，数量不应少于10路，总数少于10路时应全部检测。",[86,87,89,91],{"key":20,"text":41,"correct":32},{"key":24,"text":88,"correct":22},"20%",{"key":27,"text":90,"correct":22},"50％",{"key":30,"text":45,"correct":22},{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":24,"analysis":33},1266569,"在综合布线系统中，电子配线架应检测管理软件中显示的链路连接关系与链路的物理连接的一致性，并应按（ ）抽检。检测结果全部一致的，应判为检测合格。",[96,97,98,99],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":32},{"key":27,"text":88,"correct":22},{"key":30,"text":45,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":30,"analysis":33},1266570,"智能化集成系统接口功能应符合接口技术文件和接口测试文件的要求，接口应（ ）检测，检测结果全部符合设计要求的应为检测合格。",[104,105,106,108],{"key":20,"text":41,"correct":22},{"key":24,"text":43,"correct":22},{"key":27,"text":107,"correct":22},"50%",{"key":30,"text":45,"correct":32},{"id":110,"libraryId":5,"type":15,"typeLabel":16,"stem":111,"options":112,"answer":24,"analysis":33},1266571,"摄像机、探测器、出人口识读设备、电子巡查信息识读器等设备抽检的数量不应低于（ ），且不应少于3台，数量少于3台时应全部检测。",[113,115,116,118],{"key":20,"text":114,"correct":22},"10%",{"key":24,"text":43,"correct":32},{"key":27,"text":117,"correct":22},"30％",{"key":30,"text":45,"correct":22},{"id":120,"libraryId":5,"type":15,"typeLabel":16,"stem":121,"options":122,"answer":24,"analysis":33},1266572,"火灾报警及消防联动系统要由（ ）验收确认，安全防范系统要由（ ）验收确认，两者均是一个独立的系统。",[123,125,127,129],{"key":20,"text":124,"correct":22},"公安监管机构消防监管机构",{"key":24,"text":126,"correct":32},"消防监管机构公安监管机构",{"key":27,"text":128,"correct":22},"施工单位消防监管机构",{"key":30,"text":130,"correct":22},"公安监管机构施工单位",{"id":132,"libraryId":5,"type":15,"typeLabel":16,"stem":133,"options":134,"answer":27,"analysis":33},1266573,"信息化应用系统应用软件的一般功能和性能测试内容不包括（ ）。",[135,137,139,141],{"key":20,"text":136,"correct":22},"用户界面采用的语言",{"key":24,"text":138,"correct":22},"提示信息",{"key":27,"text":140,"correct":32},"响应时间",{"key":30,"text":142,"correct":22},"可扩展性",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":30,"analysis":33},1266574,"下列（ ）不是人侵报警系统的检测内容。",[147,149,151,153],{"key":20,"text":148,"correct":22},"防破坏及故障报警功能",{"key":24,"text":150,"correct":22},"记录及显示功能",{"key":27,"text":152,"correct":22},"系统自检功能",{"key":30,"text":154,"correct":32},"监视功能",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":27,"analysis":33},1266575,"智能建筑工程系统试运行应连续进行（ ）h。试运行中出现系统故障时，应重新开始计时。",[159,161,163,165],{"key":20,"text":160,"correct":22},"24",{"key":24,"text":162,"correct":22},"48",{"key":27,"text":164,"correct":32},"120",{"key":30,"text":166,"correct":22},"144",{"id":168,"libraryId":5,"type":15,"typeLabel":16,"stem":169,"options":170,"answer":24,"analysis":33},1266576,"应急响应系统检测应按设计要求逐项进行功能检测。检测结果符合（ ）的应判定为合格。",[171,173,175,177],{"key":20,"text":172,"correct":22},"招标文件",{"key":24,"text":174,"correct":32},"设计要求",{"key":27,"text":176,"correct":22},"软件需求规格说明",{"key":30,"text":178,"correct":22},"施工方案要求",{"id":180,"libraryId":5,"type":15,"typeLabel":16,"stem":181,"options":182,"answer":24,"analysis":33},1266577,"检测智能化集成系统报警监视及处理功能时，每个被集成系统的抽检数量不应少于该系统报警信息点数的（ ）。抽检结果全部符合设计要求的，应为检测合格。",[183,184,185,186],{"key":20,"text":39,"correct":22},{"key":24,"text":41,"correct":32},{"key":27,"text":43,"correct":22},{"key":30,"text":45,"correct":22},{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":20,"analysis":33},1266578,"光缆布线检测时，有（ ）条及以上光纤链路或信道无法修复的，综合布线系统综合判定应判为不合格。",[191,193,195,197],{"key":20,"text":192,"correct":32},"一",{"key":24,"text":194,"correct":22},"二",{"key":27,"text":196,"correct":22},"三",{"key":30,"text":198,"correct":22},"四",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":24,"analysis":33},1266579,"施工图的种类按文字形式分类，不包括（ ）。",[203,205,207,209],{"key":20,"text":204,"correct":22},"图纸目录",{"key":24,"text":206,"correct":32},"设备材料清单",{"key":27,"text":208,"correct":22},"施工说明",{"key":30,"text":210,"correct":22},"各类计算书",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":30,"analysis":33},1266580,"公共广播系统检测语言清晰度主观评价时，评分分（ ）个等级。",[215,217,219,221],{"key":20,"text":216,"correct":22},"2",{"key":24,"text":218,"correct":22},"3",{"key":27,"text":220,"correct":22},"4",{"key":30,"text":51,"correct":32},{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":20,"analysis":33},1266581,"智能建筑分部工程验收，应由（ ）组织工程验收小组，负责对分部工程进行验收。",[226,228,230,232],{"key":20,"text":227,"correct":32},"建设单位",{"key":24,"text":229,"correct":22},"监理单位",{"key":27,"text":231,"correct":22},"施工单位",{"key":30,"text":233,"correct":22},"检测单位",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":27,"analysis":33},1266582,"低压配电系统选择的电缆、电线截面不得低于设计值，进场时应对其截面和每芯导体电阻值进行见证取样送检。检查数量：同厂家各种规格总数的（ ），且不少于2个规格。",[238,239,240,241],{"key":20,"text":117,"correct":22},{"key":24,"text":88,"correct":22},{"key":27,"text":41,"correct":32},{"key":30,"text":242,"correct":22},"15%",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":27,"analysis":33},1266583,"建筑节能工程采用的材料和设备应按照规范的规定在施工现场抽样复验，复验应为（ ）。",[247,249,251,253],{"key":20,"text":248,"correct":22},"见证取样检测",{"key":24,"text":250,"correct":22},"现场抽样检测",{"key":27,"text":252,"correct":32},"见证取样送检",{"key":30,"text":254,"correct":22},"现场抽样复验",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":24,"analysis":33},1266584,"空调水系统的冷热水管道与支、吊架之间应设置（ ）。",[259,261,263,265],{"key":20,"text":260,"correct":22},"隔离层",{"key":24,"text":262,"correct":32},"绝热衬垫",{"key":27,"text":264,"correct":22},"防潮层",{"key":30,"text":266,"correct":22},"隔热层",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":24,"analysis":33},1266585,"低温热水地面辐射供暖系统安装工程，室内温控装置的传感器应安装在避开阳光直射和有发热设备且距地（ ）m处的内墙面上。",[271,273,275,277],{"key":20,"text":272,"correct":22},"1.6",{"key":24,"text":274,"correct":32},"1.4",{"key":27,"text":276,"correct":22},"1.3",{"key":30,"text":278,"correct":22},"1.2",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":20,"analysis":33},1266586,"在通电试运行中，应测试并记录照明系统的照度和功率密度值，其中照度值不得小于设计值的（ ）。",[283,285,287,289],{"key":20,"text":284,"correct":32},"95％",{"key":24,"text":286,"correct":22},"90%",{"key":27,"text":288,"correct":22},"85％",{"key":30,"text":290,"correct":22},"80％",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":20,"analysis":33},1266587,"采暖系统节能工程采用的散热器应对其单位散热量、金属热强度进行复验，检查数量：同一厂家同一规格的散热器按其数量的1％进行见证取样送检，但不得少于（ ）组。",[295,296,297,298],{"key":20,"text":216,"correct":32},{"key":24,"text":51,"correct":22},{"key":27,"text":218,"correct":22},{"key":30,"text":299,"correct":22},"1",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":20,"analysis":33},1266588,"三相照明配电干线的各相负荷宜（ ）平衡。",[304,306,308,310],{"key":20,"text":305,"correct":32},"分配",{"key":24,"text":307,"correct":22},"传递",{"key":27,"text":309,"correct":22},"均匀",{"key":30,"text":311,"correct":22},"交流",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":24,"analysis":33},1266589,"需要绝热的风管与金属支架的接触处、复合风管及需要绝热的非金属风管的连接和内部支撑加固等处，应有（ ）的措施，并应符合设计要求。",[316,318,320,322],{"key":20,"text":317,"correct":22},"防冷桥",{"key":24,"text":319,"correct":32},"防热桥",{"key":27,"text":321,"correct":22},"防结露",{"key":30,"text":323,"correct":22},"保温节能",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":24,"analysis":33},1266590,"各种材质的给水管，其试压压力均为工作压力的（ ）倍，但不小于0.6MPA。",[328,329,331,332],{"key":20,"text":299,"correct":22},{"key":24,"text":330,"correct":32},"1.5",{"key":27,"text":216,"correct":22},{"key":30,"text":333,"correct":22},"2.5",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},1266591,"监控室的嵌入式显示屏可放入后部密闭且通风不良的柜内会使（ ）",[338,340,342,344],{"key":20,"text":339,"correct":32},"工作中产生的热量不易散去",{"key":24,"text":341,"correct":22},"保持柜内的清洁安全",{"key":27,"text":343,"correct":22},"有利于管理",{"key":30,"text":345,"correct":22},"保证嵌入式显示屏不受外部因素的影响",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":27,"analysis":33},1266592,"兆欧表[标有（ ）]俗称摇表，是一种高电阻表，专门用来检测和测量电气设备和供电线路的绝缘电阻。",[350,352,354,356],{"key":20,"text":351,"correct":22},"MA",{"key":24,"text":353,"correct":22},"MY",{"key":27,"text":355,"correct":32},"M?",{"key":30,"text":357,"correct":22},"MN",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},1266593,"设计交底和施工图纸会审已经完成，属于（ ）的质量预控。",[362,364,366,368],{"key":20,"text":363,"correct":32},"全面施工准备阶段",{"key":24,"text":365,"correct":22},"分部分项工程施工作业准备",{"key":27,"text":367,"correct":22},"冬、雨季等季节性施工准备",{"key":30,"text":369,"correct":22},"施工作业技术活动",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":27,"analysis":33},1266594,"现在用的ISO9000是（ ）版。",[374,376,378,380],{"key":20,"text":375,"correct":22},"2011",{"key":24,"text":377,"correct":22},"2000",{"key":27,"text":379,"correct":32},"2010",{"key":30,"text":381,"correct":22},"2009",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},1266595,"专业术语“质量”一般包括“明确要求的质量”和（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":22},"未明确要求的",{"key":24,"text":389,"correct":32},"质量隐含要求的",{"key":27,"text":391,"correct":22},"质量特殊要求的",{"key":30,"text":393,"correct":22},"质量专业要求的质量",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":20,"analysis":33},1266596,"未搞清地质情况就仓促开工，边设计边施工，无图施工，不经竣工验收就交付使用等，这是施工项目质量问题中（ ）的原因。",[398,400,402,404],{"key":20,"text":399,"correct":32},"违背建设程序",{"key":24,"text":401,"correct":22},"违反法规行为",{"key":27,"text":403,"correct":22},"地质勘察失真",{"key":30,"text":405,"correct":22},"施工与管理不到位",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},1266597,"不属于建筑电气工程（ ）",[410,412,414,416],{"key":20,"text":411,"correct":22},"接地电阻、绝缘电阻测试",{"key":24,"text":413,"correct":32},"设备调试实验",{"key":27,"text":415,"correct":22},"照明全负荷特点试验",{"key":30,"text":417,"correct":22},"高、低压电气设备交接试验",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":24,"analysis":33},1266598,"噪声用声级计测定选点在房间中心离地面高度（ ）m处测定。",[422,423,424,425],{"key":20,"text":299,"correct":22},{"key":24,"text":278,"correct":32},{"key":27,"text":330,"correct":22},{"key":30,"text":216,"correct":22},{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":24,"analysis":33},1266599,"水平管道的纵向接缝位置布置在管道界面垂直中心线下部（ ）范围内是不合理的。",[430,432,434,436],{"key":20,"text":431,"correct":22},"30度",{"key":24,"text":433,"correct":32},"45度",{"key":27,"text":435,"correct":22},"60度",{"key":30,"text":437,"correct":22},"90度",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":20,"analysis":33},1266600,"质量资料收集的要点（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":32},"及时参与施工活动",{"key":24,"text":445,"correct":22},"整理后要有台账记录",{"key":27,"text":447,"correct":22},"整理中对作业队组提供的资料有疑问不要涂改，应找提供者澄清",{"key":30,"text":449,"correct":22},"要按不同专业、不同种类划分，形成时间先后顺序进行整理组卷",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":30,"analysis":33},1266601,"现场质量检查的内容不包括（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":22},"开工前检查",{"key":24,"text":457,"correct":22},"工序交接检查",{"key":27,"text":459,"correct":22},"隐蔽工程检查",{"key":30,"text":461,"correct":32},"审核有关技术文件",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":24,"analysis":33},1266602,"施工单位的质量控制目标，是通过施工全过程的（ ）自控，保证交付满足施工合同及设计文件所规定的质量标准的建筑工程产品。",[466,468,470,472],{"key":20,"text":467,"correct":22},"验收签证",{"key":24,"text":469,"correct":32},"全面质量",{"key":27,"text":471,"correct":22},"设计",{"key":30,"text":473,"correct":22},"施工中的问题",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":27,"analysis":33},1266603,"管理性文件是指（ ）。",[478,480,482,484],{"key":20,"text":479,"correct":22},"处理质量事务工作的文件",{"key":24,"text":481,"correct":22},"做好事前质量控制的物资准备工作的文件",{"key":27,"text":483,"correct":32},"项目依据实际需要制定的文件",{"key":30,"text":485,"correct":22},"企业制定的管理规定和程序文件",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":20,"analysis":33},1266604,".雨水管道灌水试验的灌水高度必须倒霉跟立管上部的雨水斗，试验持续时间（ ）h，不渗漏为合格。",[490,491,492,493],{"key":20,"text":299,"correct":32},{"key":24,"text":330,"correct":22},{"key":27,"text":216,"correct":22},{"key":30,"text":333,"correct":22},{"id":495,"libraryId":5,"type":15,"typeLabel":16,"stem":496,"options":497,"answer":27,"analysis":33},1266605,"质量检验阶段的特点（ ）。",[498,500,502,504],{"key":20,"text":499,"correct":22},"控制生产工程中影响质量的因素",{"key":24,"text":501,"correct":22},"把单纯的成品质量检验变成了工过程管理，使质量管理从“事后”转到“事中”",{"key":27,"text":503,"correct":32},"质量管理单纯依靠事后检查、剔除废品",{"key":30,"text":505,"correct":22},"及时处理施工中发现的材料问题",{"id":507,"libraryId":5,"type":15,"typeLabel":16,"stem":508,"options":509,"answer":27,"analysis":33},1266606,"启动排烟风机后，排烟口的风速不能低于（ ）。",[510,512,514,516],{"key":20,"text":511,"correct":22},"8m\u002Fs",{"key":24,"text":513,"correct":22},"9m\u002Fs",{"key":27,"text":515,"correct":32},"10m\u002Fs",{"key":30,"text":517,"correct":22},"11m\u002Fs",{"id":519,"libraryId":5,"type":15,"typeLabel":16,"stem":520,"options":521,"answer":20,"analysis":33},1266607,"《实施工程建设强制性标准监督规定》所称工程建设强制性标准是指直接涉及工程质量、安全、卫生及环境保护等方面的工程建设标准（ ）。",[522,524,526,528],{"key":20,"text":523,"correct":32},"强制性条文",{"key":24,"text":525,"correct":22},"标准条款",{"key":27,"text":527,"correct":22},"标准条文说明",{"key":30,"text":529,"correct":22},"标准附录",{"id":531,"libraryId":5,"type":15,"typeLabel":16,"stem":532,"options":533,"answer":20,"analysis":33},1266608,"检查的工序活动的结果，一旦发现问题，即停止作业活动进行处理，直到符合要求。判定符合要求的标准是（ ）",[534,536,538,540],{"key":20,"text":535,"correct":32},"各专业的施工质量验收规范，规范必须是现行的有效版本",{"key":24,"text":537,"correct":22},"各专业的施工质量验收规范，规范可以是任意的有效版本",{"key":27,"text":539,"correct":22},"各专业的施工质量设计规范，规范可以是任意的有效版本",{"key":30,"text":539,"correct":22},{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":30,"analysis":33},1266609,"不属于质量计划编制依据（ ）。",[545,547,549,551],{"key":20,"text":546,"correct":22},"设备清单及主要材料或大宗材料清单。",{"key":24,"text":548,"correct":22},"现场情况调查资料",{"key":27,"text":550,"correct":22},"新材料、新工艺的使用说明或试验资料",{"key":30,"text":552,"correct":32},"施工方案",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":27,"analysis":33},1266610,"正压送风机启动后，楼梯间、前室、走道风雅呈递减趋势，防排烟楼梯间风压为（ ）。",[557,559,561,563],{"key":20,"text":558,"correct":22},"45PA～50PA",{"key":24,"text":560,"correct":22},"40PA～45PA",{"key":27,"text":562,"correct":32},"40PA～50PA",{"key":30,"text":564,"correct":22},"25PA～30PA",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":20,"analysis":33},1266611,"不是设备安装工程试运行的条件（ ）",[569,571,573,575],{"key":20,"text":570,"correct":32},"符合试运行中检测工作要求",{"key":24,"text":572,"correct":22},"试运行范围内的工程已按合同约定全部完工，并经自检静态查质量合格",{"key":27,"text":574,"correct":22},"试运行所需的电力、供水、供气均接入到位",{"key":30,"text":576,"correct":22},"试运行涉及的环境、场地已清理",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":20,"analysis":33},1266612,"接地电阻值手底下水位的高低影响大，所以建议不要在雨中或雨后就测量，最好连续干燥（ ）天后进行检测。",[581,582,584,586],{"key":20,"text":53,"correct":32},{"key":24,"text":583,"correct":22},"9",{"key":27,"text":585,"correct":22},"11",{"key":30,"text":587,"correct":22},"12",[589,592,595,598,601,604],{"id":15,"name":590,"category":7,"favorite":591},"领导干部任职前廉政法规知识测试题",92,{"id":593,"name":594,"category":7,"favorite":15},595,"建筑结构与设备",{"id":596,"name":597,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":599,"name":600,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":602,"name":603,"category":7,"favorite":8},534,"BIM工程师",{"id":605,"name":603,"category":7,"favorite":8},535]