[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-854-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":571},{"id":5,"name":6,"category":7,"favorite":8},854,"(设备安装质量)专业管理实务 岗位知识","建筑工程",0,6,50,1024,[13,34,46,58,70,82,94,106,118,130,140,152,164,173,182,190,202,213,222,234,246,258,270,282,290,302,310,322,334,343,355,365,377,385,395,405,417,429,441,453,465,475,485,495,507,519,531,543,551,559],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1266513,1,"单选题","在风管穿过需要封闭的防火、防爆的墙体或楼板时，应设预埋管或防护套管，其钢板厚度不应小于（ ）mm。风管与防护套管之间，应用不燃且对人体无危害的柔性材料封堵。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","1.0",false,{"key":24,"text":25,"correct":22},"B","1.5",{"key":27,"text":28,"correct":29},"C","1.6",true,{"key":31,"text":32,"correct":22},"D","2.0","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},1266514,"（ ）是可变冷媒流量空调（VRV）系统的关键部分。",[38,40,42,44],{"key":20,"text":39,"correct":29},"风冷式冷凝器和压缩机",{"key":24,"text":41,"correct":22},"室外机",{"key":27,"text":43,"correct":22},"室内机",{"key":31,"text":45,"correct":22},"冷媒管路",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":27,"analysis":33},1266515,"阀门安装前必须进行外观检查，阀门的铭牌应符合现行国家标准《通用阀门标志》GB12220的规定。对于工作压力大于（ ）及在主干管上起到切断作用的阀门，应进行强度和严密性试验，合格后方准使用。",[50,52,54,56],{"key":20,"text":51,"correct":22},"1.6MPa",{"key":24,"text":53,"correct":22},"0.6MPa",{"key":27,"text":55,"correct":29},"1.0MPa",{"key":31,"text":57,"correct":22},"2.0MPa",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},1266516,"风管与法兰采用铆接连接时，铆接应牢固、不应有脱铆和漏铆现象；翻边应平整、紧贴法兰，其宽度应一致，且不应小于（ ）mm;咬缝与四角处不应有开裂与孔洞。",[62,64,66,68],{"key":20,"text":63,"correct":22},"9",{"key":24,"text":65,"correct":22},"8",{"key":27,"text":67,"correct":22},"5",{"key":31,"text":69,"correct":29},"6",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},1266517,"对阀门进行强度试验时，试验压力为公称压力的（ ）倍，持续时间不少于（ ）min，阀门壳体、填料应无渗漏。",[74,76,78,80],{"key":20,"text":75,"correct":22},"1.53",{"key":24,"text":77,"correct":29},"1.55",{"key":27,"text":79,"correct":22},"23",{"key":31,"text":81,"correct":22},"25",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},1266518,"某总承包单位将综合楼的通风空调工程分包给某安装单位，工程内容有风系统、水系统和冷热（媒）设备。通风空调设备安装完工后，在总承包单位的配合下，安装单位对通风空调的风系统、水系统和冷热（媒）系统进行了系统调试。调试人员在单机试运行合格后，又对各风口进行测定与调整及其他内容的调试，在全部数据达到设计要求后，在夏季做了带冷源的试运转，并通过竣工验收。综合楼正式使用后，又对通风空调工程进行了带负荷综合效能实验与调整。试回答下列问题： 风管的风量采用（ ）进行测量",[86,88,90,92],{"key":20,"text":87,"correct":29},"毕托管-微压计",{"key":24,"text":89,"correct":22},"转子流量计",{"key":27,"text":91,"correct":22},"叶轮风速仪",{"key":31,"text":93,"correct":22},"风速流量计",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},1266519,"防排烟系统柔性短管的制作材料必须为（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"难燃材料",{"key":24,"text":101,"correct":29},"不燃材料",{"key":27,"text":103,"correct":22},"难燃B1级材料",{"key":31,"text":105,"correct":22},"难燃B级材料",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},1266520,"消声弯头的平面边长大于（ ）mm时，应加吸声导流片。",[110,112,114,116],{"key":20,"text":111,"correct":22},"200",{"key":24,"text":113,"correct":22},"400",{"key":27,"text":115,"correct":29},"800",{"key":31,"text":117,"correct":22},"1000",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},1266521,"低压系统风管的严密性检验应采用抽检，抽检率为（ ），且不得少于1个系统。",[122,124,126,128],{"key":20,"text":123,"correct":29},"5％",{"key":24,"text":125,"correct":22},"10％",{"key":27,"text":127,"correct":22},"2％",{"key":31,"text":129,"correct":22},"100%",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":27,"analysis":33},1266522,"用声级计测定时，其测定点为房间中心离地面高度（ ）m处。",[134,136,137,139],{"key":20,"text":135,"correct":22},"0.5",{"key":24,"text":21,"correct":22},{"key":27,"text":138,"correct":29},"1.2",{"key":31,"text":25,"correct":22},{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":20,"analysis":33},1266523,"水平悬吊的主、干管风管长度超过20m的系统，应设置不少于（ ）个防止风管摆动的固定支架。",[144,146,148,150],{"key":20,"text":145,"correct":29},"1",{"key":24,"text":147,"correct":22},"2",{"key":27,"text":149,"correct":22},"3",{"key":31,"text":151,"correct":22},"4",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":24,"analysis":33},1266524,"空调系统由冷热源系统、空气处理系统、（ ）和自动控制系统四个子系统组成。",[156,158,160,162],{"key":20,"text":157,"correct":22},"热量输送分配系统",{"key":24,"text":159,"correct":29},"能量输送分配系统",{"key":27,"text":161,"correct":22},"通风系统",{"key":31,"text":163,"correct":22},"排烟系统",{"id":165,"libraryId":5,"type":15,"typeLabel":16,"stem":166,"options":167,"answer":20,"analysis":33},1266525,"可伸缩性金属或非金属软风管的长度不宜超过（ ）m，并不得有死弯及塌凹。",[168,169,170,171],{"key":20,"text":147,"correct":29},{"key":24,"text":145,"correct":22},{"key":27,"text":149,"correct":22},{"key":31,"text":172,"correct":22},"2.5",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":27,"analysis":33},1266526,"冷热水及冷却水系统应在系统冲洗、排污合格（目测：以排出口的水色和透明度与人水口对比相近，无可见杂物），再循环试运行（ ）以上，且水质正常后才能与制冷机组、空调机组相贯通。",[177,178,179,180],{"key":20,"text":145,"correct":22},{"key":24,"text":65,"correct":22},{"key":27,"text":147,"correct":29},{"key":31,"text":181,"correct":22},"24",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":24,"analysis":33},1266527,"截面积大于（ ）㎡的风阀应实施分组调节。",[186,187,188,189],{"key":20,"text":21,"correct":22},{"key":24,"text":138,"correct":29},{"key":27,"text":25,"correct":22},{"key":31,"text":32,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},1266528,"水泵连续运转（ ）后，滑动轴承外壳最高温度不得超过70℃；滚动轴承不得超过75℃。",[194,196,198,200],{"key":20,"text":195,"correct":22},"8h",{"key":24,"text":197,"correct":29},"2h",{"key":27,"text":199,"correct":22},"3h",{"key":31,"text":201,"correct":22},"1h",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},1266529,"防火阀直径或长边尺寸大于等于（ ）mm时，宜设独立支、吊架。",[206,208,210,211],{"key":20,"text":207,"correct":22},"500",{"key":24,"text":209,"correct":29},"630",{"key":27,"text":115,"correct":22},{"key":31,"text":212,"correct":22},"320",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},1266530,"矩形风管弯管的制作，一般应采用曲率半径为一个平面边长的内外同心弧形弯管。当采用其他形式的弯管，平面边长大于（ ）mm时，必须设置弯管导流片。",[217,218,219,221],{"key":20,"text":113,"correct":22},{"key":24,"text":207,"correct":29},{"key":27,"text":220,"correct":22},"600",{"key":31,"text":115,"correct":22},{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":24,"analysis":33},1266531,"螺纹连接的管道，螺纹应清洁、规整，断丝或缺丝不大于螺纹全扣数的10‰；连接牢固；接口处根部外露螺纹为（ ）扣，无外露填料；镀锌管道的镀锌层应注意保护，对局部的破损处，应做防腐处理。",[226,228,230,232],{"key":20,"text":227,"correct":22},"1~3",{"key":24,"text":229,"correct":29},"2~3",{"key":27,"text":231,"correct":22},"2~4",{"key":31,"text":233,"correct":22},"3~5",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":24,"analysis":33},1266532,"某总承包单位将综合楼的通风空调工程分包给某安装单位，工程内容有风系统、水系统和冷热（媒）设备。通风空调设备安装完工后，在总承包单位的配合下，安装单位对通风空调的风系统、水系统和冷热（媒）系统进行了系统调试。调试人员在单机试运行合格后，又对各风口进行测定与调整及其他内容的调试，在全部数据达到设计要求后，在夏季做了带冷源的试运转，并通过竣工验收。综合楼正式使用后，又对通风空调工程进行了带负荷综合效能实验与调整。试回答下列问题： 通风空调系统气流组织的测定与调整做法正确的是（ ）。",[238,240,242,244],{"key":20,"text":239,"correct":22},"气流速度分布的测定工作是在气流流型测定之后进行，且射流区和回流区内的测点布置与流型测定不同",{"key":24,"text":241,"correct":29},"气流流型测定的烟雾法只能在粗侧中采用",{"key":27,"text":243,"correct":22},"气流流型测定的逐点描绘法是将很细的纤维丝或点燃的香绑在测杠上，放在已事先布置好的测定断面各测点的位置上，观察丝线或烟的流动方向，并记录图上逐点描绘出气流流型",{"key":31,"text":245,"correct":22},"温度分布的测定主要确定射流的温度在进入恒温区之后是否衰减好，以及恒温区的区域温差值",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":31,"analysis":33},1266533,"（ ）应垂直安装在便于检修的位置，其排气管的出口应朝向安全地带，排液管应装在泄水管上。",[250,252,254,256],{"key":20,"text":251,"correct":22},"电磁阀",{"key":24,"text":253,"correct":22},"调节阀",{"key":27,"text":255,"correct":22},"热力膨胀阀",{"key":31,"text":257,"correct":29},"安全阀",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":20,"analysis":33},1266534,"当采用漏光法检测系统的严密性时，低压系统风管以每10m接缝，漏光点不大于（ ）处，且100m接缝平均不大于（ ）处为合格。",[262,264,266,268],{"key":20,"text":263,"correct":29},"2，16",{"key":24,"text":265,"correct":22},"2，20",{"key":27,"text":267,"correct":22},"1，10",{"key":31,"text":269,"correct":22},"1，8",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":27,"analysis":33},1266535,"空调设备的布置以机械制图法则用（ ）进行绘制，但仅为外形轮廓的尺寸。",[274,276,278,280],{"key":20,"text":275,"correct":22},"斜视图",{"key":24,"text":277,"correct":22},"轴测图",{"key":27,"text":279,"correct":29},"三视图",{"key":31,"text":281,"correct":22},"剖面图",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":24,"analysis":33},1266536,"风管法兰连接时，其连接应牢固，法兰管口平面度的允许偏差为（ ）mm。",[286,287,288,289],{"key":20,"text":145,"correct":22},{"key":24,"text":147,"correct":29},{"key":27,"text":149,"correct":22},{"key":31,"text":151,"correct":22},{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":24,"analysis":33},1266537,"下面关于风管尺寸标注的叙述，错误的是（ ）。",[294,296,298,300],{"key":20,"text":295,"correct":22},"圆形风管尺寸以外径φ标注，单位为mm",{"key":24,"text":297,"correct":29},"风管尺寸标注时，一般要注明壁厚",{"key":27,"text":299,"correct":22},"矩形风管尺寸以A×B表示，A应为该视图投影面的边长尺寸，B应为另一边的边长尺寸",{"key":31,"text":301,"correct":22},"矩形风管尺寸的标注单位是mm",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":24,"analysis":33},1266538,"薄钢板法兰的折边（或法兰条）应平直，弯曲度不应大于5\u002F1000；弹性插条或弹簧夹应与薄钢板法兰相匹配；角件与风管薄钢板法兰四角接口的固定应稳固、紧贴，端面应平整、相连处不应有缝隙大于（ ）的连续穿透缝。",[306,307,308,309],{"key":20,"text":21,"correct":22},{"key":24,"text":32,"correct":29},{"key":27,"text":149,"correct":22},{"key":31,"text":25,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":20,"analysis":33},1266539,"以下选项不属于工业工程常用垫料的是（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":29},"橡胶板",{"key":24,"text":317,"correct":22},"石棉橡胶板",{"key":27,"text":319,"correct":22},"石棉板",{"key":31,"text":321,"correct":22},"软聚氯乙烯板",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":27,"analysis":33},1266540,"空调系统试压：在各分区管道与系统主、干管全部连通后，对整个系统的管道进行系统的试压。试验压力以最低点的压力为准，但最低点的压力不得超过管道与组成件的承受压力。压力试验升至试验压力后，稳压10min，压力下降不得大于（ ）MPa，再将系统压力降至工作压力，外观检查无渗漏为合格。",[326,328,330,332],{"key":20,"text":327,"correct":22},"0.05",{"key":24,"text":329,"correct":22},"0.03",{"key":27,"text":331,"correct":29},"0.02",{"key":31,"text":333,"correct":22},"0.01",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":24,"analysis":33},1266541,"风机试运转时，主轴承温升稳定后，连续试运转不少于（ ）h，停机后应检查管道密封性和叶顶间隙。",[338,339,340,342],{"key":20,"text":149,"correct":22},{"key":24,"text":69,"correct":29},{"key":27,"text":341,"correct":22},"12",{"key":31,"text":181,"correct":22},{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":27,"analysis":33},1266542,"净化空调系统风管所用的螺栓、螺母、垫圈和铆钉均应采用与管材性能相匹配、不会产生电化学腐蚀的材料，或采取镀锌或其他防腐措施，并不得采用（ ）。",[347,349,351,353],{"key":20,"text":348,"correct":22},"镀锌铆钉",{"key":24,"text":350,"correct":22},"拉铆钉",{"key":27,"text":352,"correct":29},"抽芯铆钉",{"key":31,"text":354,"correct":22},"普通铆钉",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":24,"analysis":33},1266543,"空调冷热水、冷却水总流量测试结果与设计流量的偏差不应大于（ ）。",[359,360,361,363],{"key":20,"text":123,"correct":22},{"key":24,"text":125,"correct":29},{"key":27,"text":362,"correct":22},"15％",{"key":31,"text":364,"correct":22},"20％",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":24,"analysis":33},1266544,"孔隙达到一定程度会使导热系数增大，通常把室温下导热系数低于（ ）W\u002F（m·K）的材料称为绝热材料。",[369,371,373,375],{"key":20,"text":370,"correct":22},"0.1",{"key":24,"text":372,"correct":29},"0.2",{"key":27,"text":374,"correct":22},"0.25",{"key":31,"text":376,"correct":22},"0.4",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":31,"analysis":33},1266545,"某总承包单位将综合楼的通风空调工程分包给某安装单位，工程内容有风系统、水系统和冷热（媒）设备。通风空调设备安装完工后，在总承包单位的配合下，安装单位对通风空调的风系统、水系统和冷热（媒）系统进行了系统调试。调试人员在单机试运行合格后，又对各风口进行测定与调整及其他内容的调试，在全部数据达到设计要求后，在夏季做了带冷源的试运转，并通过竣工验收。综合楼正式使用后，又对通风空调工程进行了带负荷综合效能实验与调整。试回答下列问题： 空调系统带冷（热）源的正常联合试转时间不应少于（ ）h。",[381,382,383,384],{"key":20,"text":147,"correct":22},{"key":24,"text":151,"correct":22},{"key":27,"text":69,"correct":22},{"key":31,"text":65,"correct":29},{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":27,"analysis":33},1266546,"按风管系统工作压力划分，风管系统可分为低压系统、中压系统和高压系统。其中系统工作压力小于等于（ ）Pa为低压系统。",[389,391,392,393],{"key":20,"text":390,"correct":22},"1500",{"key":24,"text":117,"correct":22},{"key":27,"text":207,"correct":29},{"key":31,"text":394,"correct":22},"300",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":24,"analysis":33},1266547,"风机盘管机组安装前宜进行水压检漏试验，试验压力为系统工作压力的（ ）倍，试验观察时间为（ ）min，不渗漏为合格。",[399,400,402,403],{"key":20,"text":75,"correct":22},{"key":24,"text":401,"correct":29},"1.52",{"key":27,"text":79,"correct":22},{"key":31,"text":404,"correct":22},"22",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":24,"analysis":33},1266548,"复合材料风管的覆面材料必须为不燃材料，内部的绝热材料应为（ ），且对人体无害的材料。",[409,411,413,415],{"key":20,"text":410,"correct":22},"不燃",{"key":24,"text":412,"correct":29},"不燃或难燃B1级",{"key":27,"text":414,"correct":22},"难燃B1级",{"key":31,"text":416,"correct":22},"不燃或难燃B级",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":31,"analysis":33},1266549,"下列关于VRV系统叙述错误的是（ ）。",[421,423,425,427],{"key":20,"text":422,"correct":22},"VRV系统简单，厂方可以供给所有设备和管道配件",{"key":24,"text":424,"correct":22},"其施工工作周期大大减少",{"key":27,"text":426,"correct":22},"各末端装置的冷媒流量能满足负荷要求",{"key":31,"text":428,"correct":29},"但VAV系统会产生冷媒供应不良的现象",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":24,"analysis":33},1266550,"风管接口的连接应严密、牢固。风管法兰垫片厚度不应小于（ ）。垫片不应凸入管内，亦不应突出法兰外。",[433,435,437,439],{"key":20,"text":434,"correct":22},"2mm",{"key":24,"text":436,"correct":29},"3mm",{"key":27,"text":438,"correct":22},"4mm",{"key":31,"text":440,"correct":22},"5mm",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":24,"analysis":33},1266551,"根据《电梯工程施工质量验收规范》GB50310-2002规定，电梯轿厢当距轿底面在1.1m以下使用玻璃轿壁时，必须在距轿底面（ ）m的高度安装扶手，且扶手必须独立地固定，不得与玻璃有关。",[445,447,449,451],{"key":20,"text":446,"correct":22},"0.7~0.9",{"key":24,"text":448,"correct":29},"0.9~1.1",{"key":27,"text":450,"correct":22},"1.0~1.2",{"key":31,"text":452,"correct":22},"1.1~1.3",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":27,"analysis":33},1266552,"在乘客电梯和病床电梯开关门过程中，噪声不应大于（ ）dB （A）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"55",{"key":24,"text":460,"correct":22},"60",{"key":27,"text":462,"correct":29},"65",{"key":31,"text":464,"correct":22},"80",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":27,"analysis":33},1266553,"根据《电梯工程施工质量验收规范》GB50310一2002规定，当相邻轿厢间没有相互救援用轿厢安全门时，相邻两层门地坎间的距离大于（ ）m，其间必须设置井道安全门。",[469,470,472,474],{"key":20,"text":65,"correct":22},{"key":24,"text":471,"correct":22},"10",{"key":27,"text":473,"correct":29},"11",{"key":31,"text":341,"correct":22},{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":31,"analysis":33},1266554,"电梯安装之前，层门预留孔必须设有高度不小于（ ）m的安全保护围封，并应保证有足够的强度。",[479,480,482,484],{"key":20,"text":21,"correct":22},{"key":24,"text":481,"correct":22},"0.8",{"key":27,"text":483,"correct":22},"1.1",{"key":31,"text":138,"correct":29},{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":27,"analysis":33},1266555,"某电梯安装工程项目，由于电梯工程在高且深的井道内作业，每层在层门安装前留下较大的门洞，因此对于作业人员或其他闲杂人员存在高空坠落危险，针对这一情况，施工项目部对从事影响工程产品质量的所有人员进行了控制。 施工项目部对该电梯工程的施工程序和施工安全技术措施的制定如下：机房通向井道的预留孔随时开通以方便施工；安装好导轨后放基准线进行配管、配线；所有层门洞靠井道壁外侧设置坚固的围封，围封的高度为1.2m；保护围封下部设有高度为150mm的踢脚板，并采用左右开启方式；井道内应设置永久性电气照明，采用36V安全电压。 电梯机房内应当设置永久性电气照明，地板表面温度不应低于（ ）lx。",[489,491,493,494],{"key":20,"text":490,"correct":22},"70",{"key":24,"text":492,"correct":22},"100",{"key":27,"text":111,"correct":29},{"key":31,"text":394,"correct":22},{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":20,"analysis":33},1266556,"综合布线管理软件功能（ ）检测。",[499,501,503,505],{"key":20,"text":500,"correct":29},"全部",{"key":24,"text":502,"correct":22},"抽样",{"key":27,"text":504,"correct":22},"随机",{"key":31,"text":506,"correct":22},"不用",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":31,"analysis":33},1266557,"《智能建筑工程质量验收规范》GB50339-2013规定，信息化应用系统检测时，应测试业务功能和业务流程，结果符合（ ）的应判定为合格。",[511,513,515,517],{"key":20,"text":512,"correct":22},"设计",{"key":24,"text":514,"correct":22},"招标文件",{"key":27,"text":516,"correct":22},"合同",{"key":31,"text":518,"correct":29},"软件需求规格说明",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":27,"analysis":33},1266558,"信息化应用系统检测时，应检查运行软件产品的设备中安装的软件，符合（应判定为合格。",[523,525,527,529],{"key":20,"text":524,"correct":22},"软件需求规格说明的",{"key":24,"text":526,"correct":22},"招标文件要求的",{"key":27,"text":528,"correct":29},"没有安装与业务应用无关的软件的",{"key":31,"text":530,"correct":22},"运行要求的",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":24,"analysis":33},1266559,"暖通空调监控系统的功能检测时，冷热源的监测参数应（ ）检测；空调、新风机组的监测参数应按总数的（ ）抽检，且不应少于5台，不足5台时应全部检测；各种类型传感器、执行器应按（ ）抽检，且不应少于5只，不足5只时应全部检测。",[535,537,539,541],{"key":20,"text":536,"correct":22},"50％10％10％",{"key":24,"text":538,"correct":29},"100%20％10％",{"key":27,"text":540,"correct":22},"50％20％10％",{"key":31,"text":542,"correct":22},"100％10％20％",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":24,"analysis":33},1266560,"子钟与母钟的时间显示偏差不大于（ ）s。",[547,548,549,550],{"key":20,"text":135,"correct":22},{"key":24,"text":145,"correct":29},{"key":27,"text":147,"correct":22},{"key":31,"text":67,"correct":22},{"id":552,"libraryId":5,"type":15,"typeLabel":16,"stem":553,"options":554,"answer":27,"analysis":33},1266561,"公共广播系统检测语言清晰度主观评价时，评价人员应独立评价打分，评价结果应取所有评价人员打分的算术平均值，评价结果不低于（ ）分的应判定为合格。",[555,556,557,558],{"key":20,"text":147,"correct":22},{"key":24,"text":149,"correct":22},{"key":27,"text":151,"correct":29},{"key":31,"text":67,"correct":22},{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":31,"analysis":33},1266562,"智能建筑工程自检记录由施工单位填写，施工单位的（ ）作出检查结论。",[563,565,567,569],{"key":20,"text":564,"correct":22},"施工员",{"key":24,"text":566,"correct":22},"质检员",{"key":27,"text":568,"correct":22},"技术负责人",{"key":31,"text":570,"correct":29},"专业技术负责人",[572,575,578,581,584,587],{"id":15,"name":573,"category":7,"favorite":574},"领导干部任职前廉政法规知识测试题",92,{"id":576,"name":577,"category":7,"favorite":15},595,"建筑结构与设备",{"id":579,"name":580,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":582,"name":583,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":585,"name":586,"category":7,"favorite":8},534,"BIM工程师",{"id":588,"name":586,"category":7,"favorite":8},535]