[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-854-21":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":166},{"id":5,"name":6,"category":7,"favorite":8},854,"(设备安装质量)专业管理实务 岗位知识","建筑工程",0,21,50,1024,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":25,"analysis":27},1267264,3,"判断题","停止点在本质上是施工过程中的某一个工序，一个工序完成两个作业内容。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",false,{"key":24,"text":25,"correct":26},"B","错误",true,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":21,"analysis":27},1267265,"停止点是个特殊的点，即这道工序未作检验，并尚未断定合格与否，是不是进行下道工序的，只有得出结论为合格者才可以进下道工序。",[32,33],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":21,"analysis":27},1267266,"对事故处理的基本要求是：满足使用要求；安全可靠，不留隐患；经济合理；处理方便、安全；处理用的机具、设备、材料及技术力量能够满足要求。",[38,39],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":21,"analysis":27},1267267,"质量员应能够根据质量交底的要求和相关内容为工程质量交底提供相关资料。",[44,45],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":21,"analysis":27},1267268,"只有符合工程质量资料的基本要求的五个方面的质量材料才认为是可信的、合格的、日后可查阅应用的质量材料。",[50,51],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":25,"analysis":27},1267269,"质量员不应参与编写《工程质量通病控制方案和施工措施》有关质量文件。",[56,57],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":25,"analysis":27},1267270,"质量部门主要职责：组织编制事先、事中、事后质量控制计划，并在实施执行中进行施工。",[62,63],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":21,"analysis":27},1267271,"建设单位要施工单位负责组织联合试运转，应签订补充合同进行约定。",[68,69],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":25,"analysis":27},1267272,"对技术文件、报告、报表、记录的审核，是对工程质量进行全面控制的主要手段。",[74,75],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":25,"analysis":27},1267273,"共有四个因素影响质量：作业人员、施工机械、施工用材料和施工工艺方法。",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":21,"analysis":27},1267274,"ISO9000是指质量管理体系标准，不是指一个标准，而是一族标准的统称。",[86,87],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":25,"analysis":27},1267275,"为了整齐反映接地电阻值，通常要至少测两次，两次测量的的探针连线在条件允许的情况下，互成700角，最终数值为两次测得值的平均值。",[92,93],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":21,"analysis":27},1267276,"经批准的质量计划的实施具有行政上的合法性。",[98,99],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1267277,"通过施工质量策划形成的施工质量计划等同于施工组织计划。",[104,105],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":21,"analysis":27},1267278,"“固有特性”是指在某事或某物中本来就有的，尤其是那种永久的特性。",[110,111],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},1267279,"施工阶段质量控制的目标是确保工序质量合格。",[116,117],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":21,"analysis":27},1267280,"修正后的计划按程序文件规定经审核批准后才能执行。",[122,123],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":25,"analysis":27},1267281,"判定准确性的标准是资料所反映的内容相一致。",[128,129],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":21,"analysis":27},1267282,"影响工程质量的因素主要有施工人员、施工用机械、施工用材料、施工用方法、施工作业环境五个方面，简称人、机、料、法、环（4M1E）。",[134,135],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":25,"analysis":27},1267283,"按照时间阶段划分，设备安装工程的施工试验可分为静态试验和动态考核两类。",[140,141],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":21,"analysis":27},1267284,"工程质量的验收均应在施工单位自行检查评定的基础上进行。",[146,147],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},1267285,"施工质量的影响因素主要有人、材料、机械、方法及环境等五大方。",[152,153],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":25,"analysis":27},1267286,"一般情况下，自检、互检和专检要全盘检查。",[158,159],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":25,"analysis":27},1267287,"分项、分部、单位等工程的质量验收记录应该由质量员填写记录。",[164,165],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},[167,171,174,177,180,183],{"id":168,"name":169,"category":7,"favorite":170},1,"领导干部任职前廉政法规知识测试题",92,{"id":172,"name":173,"category":7,"favorite":168},595,"建筑结构与设备",{"id":175,"name":176,"category":7,"favorite":168},715,"招标采购专业知识与法律法规",{"id":178,"name":179,"category":7,"favorite":168},848,"市政方向-通用基础",{"id":181,"name":182,"category":7,"favorite":8},534,"BIM工程师",{"id":184,"name":182,"category":7,"favorite":8},535]