[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-854-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":586},{"id":5,"name":6,"category":7,"favorite":8},854,"(设备安装质量)专业管理实务 岗位知识","建筑工程",0,2,50,1024,[13,34,46,58,69,81,93,105,116,124,136,145,157,169,180,192,204,216,228,238,246,258,270,282,294,303,312,324,336,346,358,370,382,391,403,414,426,438,450,462,471,483,495,505,514,526,538,550,562,574],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},1266313,1,"单选题","现行的《建筑电气工程施工质量验收规范》GB50303-2002要求金属电缆桥架及其支架全长应不少于（ ）处与接地（P E）或接零（PEN）干线相连接。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","1",false,{"key":24,"text":25,"correct":26},"B","2",true,{"key":28,"text":29,"correct":22},"C","3",{"key":31,"text":32,"correct":22},"D","4","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},1266314,"现行的《自动喷水灭火系统施工及验收规范》GB50261-2005要求闭式喷头应进行（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"压力试验",{"key":24,"text":41,"correct":26},"密封性试验",{"key":28,"text":43,"correct":22},"强度试验",{"key":31,"text":45,"correct":22},"灌水试验",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},1266315,"检验批应由专业监理工程师组织（ ）等进行验收。",[50,52,54,56],{"key":20,"text":51,"correct":22},"施工员",{"key":24,"text":53,"correct":26},"项目专业质量检查员",{"key":28,"text":55,"correct":22},"专业工长",{"key":31,"text":57,"correct":22},"资料员",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},1266316,"施工组织设计应由（ ）主持编制，可根据需要分阶段编制和审批。",[62,64,65,67],{"key":20,"text":63,"correct":26},"项目负责人",{"key":24,"text":51,"correct":22},{"key":28,"text":66,"correct":22},"质量员",{"key":31,"text":68,"correct":22},"技术负责人",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":20,"analysis":33},1266317,"建筑给水排水及采暖工程施工质量检测中应检测管道滑动支架，滑托与滑槽两侧间应留有（ ）mm的间隙。",[73,75,77,79],{"key":20,"text":74,"correct":26},"3～5",{"key":24,"text":76,"correct":22},"4～6",{"key":28,"text":78,"correct":22},"5～7",{"key":31,"text":80,"correct":22},"3～6",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":20,"analysis":33},1266318,"当专业验收规范对工程中的验收项目未作出相应规定时，应由（ ）组织监理、设计、施工等相关单位制定专项验收要求。涉及安全、节能、环境保护等项目的专项验收要求应由建设单位组织专家论证。",[85,87,89,91],{"key":20,"text":86,"correct":26},"建设单位",{"key":24,"text":88,"correct":22},"监理单位",{"key":28,"text":90,"correct":22},"施工单位",{"key":31,"text":92,"correct":22},"设计单位",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":24,"analysis":33},1266319,"现行的《通风与空调工程施工质量验收规范》GB50243-2002要求防排烟系统柔性短管的制作材料必须为（ ）。",[97,99,101,103],{"key":20,"text":98,"correct":22},"可燃材料",{"key":24,"text":100,"correct":26},"不燃材料",{"key":28,"text":102,"correct":22},"非易燃材料",{"key":31,"text":104,"correct":22},"耐热材料",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":28,"analysis":33},1266320,"分部工程质量验收记录由（ ）填写。",[109,111,113,115],{"key":20,"text":110,"correct":22},"监理工程师或建设单位专业技术负责人",{"key":24,"text":112,"correct":22},"总监理工程师",{"key":28,"text":114,"correct":26},"总监理工程师或建筑单位项目专业负责人",{"key":31,"text":86,"correct":22},{"id":117,"libraryId":5,"type":15,"typeLabel":16,"stem":118,"options":119,"answer":28,"analysis":33},1266321,"特种设备监督检验合格后，监督检验单位应按规定的期限出具监督检验报告监督检验报告应包含（ ）项监督检验报告的内容和结论。",[120,121,122,123],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":28,"text":29,"correct":26},{"key":31,"text":32,"correct":22},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":31,"analysis":33},1266322,"特种设备经过安装、改造、维修竣工后，安装、改造、维修的施工单位应当在验收后（ ）日内将有关技术资料移交使用单位，高耗能特种设备还应按照安全技术规范的要求提交能效测试报告。",[128,130,132,134],{"key":20,"text":129,"correct":22},"10",{"key":24,"text":131,"correct":22},"15",{"key":28,"text":133,"correct":22},"20",{"key":31,"text":135,"correct":26},"30",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":24,"analysis":33},1266323,"现行的《自动喷水灭火系统施工及验收规范》GB50261-2005要求自动喷水灭火系统管网安装完毕后，应对其进行强度试验、严密性试验和（ ）。",[140,141,143,144],{"key":20,"text":39,"correct":22},{"key":24,"text":142,"correct":26},"冲洗",{"key":28,"text":43,"correct":22},{"key":31,"text":45,"correct":22},{"id":146,"libraryId":5,"type":15,"typeLabel":16,"stem":147,"options":148,"answer":28,"analysis":33},1266324,"现行的《建筑给水排水及采暖工程施工质量验收规范》GB50242-2002中要求盘管隐蔽前必须进行（ ）。",[149,151,153,155],{"key":20,"text":150,"correct":22},"满水实验",{"key":24,"text":152,"correct":22},"灌水实验",{"key":28,"text":154,"correct":26},"水压实验",{"key":31,"text":156,"correct":22},"注水实验",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":20,"analysis":33},1266325,"房屋建筑安装工程中使用的设备材料有两个大类，一类是强制认证的产品，另一类是一般的（ ）。",[161,163,165,167],{"key":20,"text":162,"correct":26},"通用产品",{"key":24,"text":164,"correct":22},"合格产品",{"key":28,"text":166,"correct":22},"检验产品",{"key":31,"text":168,"correct":22},"免检产品",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":28,"analysis":33},1266326,"建筑给水排水及采暖工程施工质量检测要求地漏水封高度不小于（ ）mm。",[173,174,176,178],{"key":20,"text":135,"correct":22},{"key":24,"text":175,"correct":22},"40",{"key":28,"text":177,"correct":26},"50",{"key":31,"text":179,"correct":22},"55",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":24,"analysis":33},1266327,"检验批的质量应按主控项目和（ ）验收。",[184,186,188,190],{"key":20,"text":185,"correct":22},"保证项目",{"key":24,"text":187,"correct":26},"一般项目",{"key":28,"text":189,"correct":22},"基本项目",{"key":31,"text":191,"correct":22},"允许偏差项目",{"id":193,"libraryId":5,"type":15,"typeLabel":16,"stem":194,"options":195,"answer":20,"analysis":33},1266328,"在工程质量控制材料方面，属于给水排水与采暖工程是（ ）",[196,198,200,202],{"key":20,"text":197,"correct":26},"系统清洗、消毒、灌水、通水、通球实验记录",{"key":24,"text":199,"correct":22},"接地、绝缘电阻测试记录",{"key":28,"text":201,"correct":22},"制冷设备运行调试记录",{"key":31,"text":203,"correct":22},"通风、空调系统调试记录",{"id":205,"libraryId":5,"type":15,"typeLabel":16,"stem":206,"options":207,"answer":24,"analysis":33},1266329,"自动喷水灭火系统中地下消防水泵接合器其进水口与井盖面的距离不大于（ ）m，且不小于井盖的半径。",[208,210,212,214],{"key":20,"text":209,"correct":22},"0.3",{"key":24,"text":211,"correct":26},"0.4",{"key":28,"text":213,"correct":22},"0.5",{"key":31,"text":215,"correct":22},"0.6",{"id":217,"libraryId":5,"type":15,"typeLabel":16,"stem":218,"options":219,"answer":28,"analysis":33},1266330,"按照《通风与空调工程施工质量验收规范》GB50243-2002对现场组装的除尘器壳体进行漏风量检测，在设计工作压力下，允许漏风率为（ ）。",[220,222,224,226],{"key":20,"text":221,"correct":22},"3%",{"key":24,"text":223,"correct":22},"4%",{"key":28,"text":225,"correct":26},"5%",{"key":31,"text":227,"correct":22},"6%",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":20,"analysis":33},1266331,"特种设备中的压力容器的压力范围是最高工作压力大于或等于（ ）MPA",[232,234,235,236],{"key":20,"text":233,"correct":26},"0.1",{"key":24,"text":209,"correct":22},{"key":28,"text":213,"correct":22},{"key":31,"text":237,"correct":22},"0.7",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},1266332,"单位工程质量验收记录由（ ）填写。",[242,243,244,245],{"key":20,"text":110,"correct":22},{"key":24,"text":112,"correct":22},{"key":28,"text":114,"correct":22},{"key":31,"text":86,"correct":26},{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":20,"analysis":33},1266333,"现行的《建筑给水排水及采暖工程施工质量验收规范》GB50242-2002中要求地下室或地下构筑物外墙有管道穿过的，应采取防水措施。对有严格防水要求的建筑物，（ ）。",[250,252,254,256],{"key":20,"text":251,"correct":26},"必须采用柔性防水套管",{"key":24,"text":253,"correct":22},"必须采用刚性防水套管",{"key":28,"text":255,"correct":22},"刚性、柔性防水套管均",{"key":31,"text":257,"correct":22},"可使用可以不使用套管",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":28,"analysis":33},1266334,"现行的《通风与空调工程施工质量验收规范》GB50243-2002要求在风管穿过需要封闭的防火、防爆的墙体或楼板时，应设预埋管或防护套管，其钢板厚度不小于（ ）mm。",[262,264,266,268],{"key":20,"text":263,"correct":22},"1.4",{"key":24,"text":265,"correct":22},"1.5",{"key":28,"text":267,"correct":26},"1.6",{"key":31,"text":269,"correct":22},"2.0",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":28,"analysis":33},1266335,"计量器具的专业人员的职责是正确应用法定计量单位和（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":22},"正确保管计量器具",{"key":24,"text":277,"correct":22},"检验校核计量器具",{"key":28,"text":279,"correct":26},"确保各类计量器具在有效期内使用",{"key":31,"text":281,"correct":22},"维修计量器具",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":28,"analysis":33},1266336,"建筑工程质量验收应划分为单位（子单位）工程、分部（子分部）工程、分项工程和（ ）。",[286,288,290,292],{"key":20,"text":287,"correct":22},"验收部位",{"key":24,"text":289,"correct":22},"工序",{"key":28,"text":291,"correct":26},"检验批",{"key":31,"text":293,"correct":22},"专业验收",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":31,"analysis":33},1266337,"自动喷水灭火系统中以自动或手动方式启动水泵时，消防水泵应在（ ）s内投入正常运行。",[298,299,300,302],{"key":20,"text":131,"correct":22},{"key":24,"text":133,"correct":22},{"key":28,"text":301,"correct":22},"25",{"key":31,"text":135,"correct":26},{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":20,"analysis":33},1266338,"现行的《建筑电气工程施工质量验收规范》GB50303-2002要求镀锌和壁厚小于等于（ ）mm的钢导管不得套管熔焊链接。",[307,308,309,310],{"key":20,"text":25,"correct":26},{"key":24,"text":29,"correct":22},{"key":28,"text":32,"correct":22},{"key":31,"text":311,"correct":22},"5",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":24,"analysis":33},1266339,"导管验收准备工作内容包括：选定参与验收的人员、（ ）、收集质量标准。",[316,318,320,322],{"key":20,"text":317,"correct":22},"查验质量说明书",{"key":24,"text":319,"correct":26},"整理采购协议或合同",{"key":28,"text":321,"correct":22},"检验免检证书",{"key":31,"text":323,"correct":22},"核对",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":31,"analysis":33},1266340,"室外工程科根据专业类别和工程规模划分（ ）",[328,330,332,334],{"key":20,"text":329,"correct":22},"分部工程",{"key":24,"text":331,"correct":22},"分项工程",{"key":28,"text":333,"correct":22},"总工程",{"key":31,"text":335,"correct":26},"单位工程",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":24,"analysis":33},1266341,"排水塑料管必须按设计要求装设伸缩节。但是，当设计无要求时，伸缩节间距不得大于（ ）m。",[340,341,342,344],{"key":20,"text":25,"correct":22},{"key":24,"text":32,"correct":26},{"key":28,"text":343,"correct":22},"6",{"key":31,"text":345,"correct":22},"8",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":28,"analysis":33},1266342,"排水主立管及水平干管管道应做通球试验，通球球径不小于排水管道管径的（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"3\u002F4",{"key":24,"text":353,"correct":22},"3\u002F5",{"key":28,"text":355,"correct":26},"2\u002F3",{"key":31,"text":357,"correct":22},"1\u002F3",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":20,"analysis":33},1266343,"室外铸铁给水管安装的工艺流程是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":26},"管道预制→布管、下管→管道对口、调直稳固→管道连接→试压、冲洗、消毒→土方回填",{"key":24,"text":365,"correct":22},"管道预制→管道对口、调直稳固→布管、下管→管道连接→试压、冲洗、消毒→土方回填",{"key":28,"text":367,"correct":22},"管道预制→布管、下管→试压、冲洗、消毒→管道连接→管道对口、调直稳固→土方回填",{"key":31,"text":369,"correct":22},"管道预制→试压、冲洗、消毒→管道对口、调直稳固→管道连接→布管、下管→土方回填",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":24,"analysis":33},1266344,"硬聚氯乙烯（U～PV C）给水管的连接方式为（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":22},"焊接",{"key":24,"text":377,"correct":26},"粘接",{"key":28,"text":379,"correct":22},"法兰连接",{"key":31,"text":381,"correct":22},"热熔连接",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":28,"analysis":33},1266345,"排水栓和地漏的安装应平整、牢固，低于排水表面，周边无渗漏。地漏水封高度不得小于（ ）mm。",[386,387,389,390],{"key":20,"text":135,"correct":22},{"key":24,"text":388,"correct":22},"60",{"key":28,"text":177,"correct":26},{"key":31,"text":175,"correct":22},{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":20,"analysis":33},1266346,"某行政办公楼2012年3月主体工程施工完毕，开始进行给水排水管道安装施工，承包单位合理安排施工，严格把好质量关，2012年7月底工程顺利通过竣工验收并投入使用，请问管道施工时应注意哪些问题。 给水管道安装顺序（ ）。",[395,397,399,401],{"key":20,"text":396,"correct":26},"安装→试压→保温→消毒→冲洗",{"key":24,"text":398,"correct":22},"安装→保温→试压→消毒→冲洗",{"key":28,"text":400,"correct":22},"安装→试压→消毒→冲洗→保温",{"key":31,"text":402,"correct":22},"安装→保温→试压→冲洗→消毒",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":20,"analysis":33},1266347,"隐蔽或埋地的排水管道在隐蔽前必须做（ ），其灌水高度应不低于底层卫生器具的上边缘或底层地面高度。",[407,409,411,413],{"key":20,"text":408,"correct":26},"通水试验",{"key":24,"text":410,"correct":22},"严密性试验",{"key":28,"text":412,"correct":22},"渗水试验",{"key":31,"text":45,"correct":22},{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":24,"analysis":33},1266348,"非承压锅炉，应严格按设计或产品说明书的要求施工。锅筒顶部必须敞口或装设大气连通管，连通管上不得安装（ ）。",[418,420,422,424],{"key":20,"text":419,"correct":22},"安全阀",{"key":24,"text":421,"correct":26},"阀门",{"key":28,"text":423,"correct":22},"排气阀",{"key":31,"text":425,"correct":22},"防雨罩",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":20,"analysis":33},1266349,"混凝土排水管安装的工艺流程是（ ）。",[430,432,434,436],{"key":20,"text":431,"correct":26},"安装准备→测量放线→开挖沟槽→铺设基础→管道安装及连接→管道与检查井连接→灌水试验→回填土→通水试验",{"key":24,"text":433,"correct":22},"安装准备→开挖沟槽→测量放线→铺设基础→管道安装及连接→管道与检查井连接→灌水试验→回填土→通水试验",{"key":28,"text":435,"correct":22},"安装准备→测量放线→开挖沟槽→管道安装及连接→铺设基础→管道与检查井连接→灌水试验→回填土→通水试验",{"key":31,"text":437,"correct":22},"安装准备→测量放线→开挖沟槽→铺设基础→管道与检查井连接→管道安装及连接→灌水试验→回填土→通水试验",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":31,"analysis":33},1266350,"在经常有人停留的平屋顶上，通气管应高出屋面（ ），并应根据防雷要求设置防雷装置。",[442,444,446,448],{"key":20,"text":443,"correct":22},"0.3m",{"key":24,"text":445,"correct":22},"2.5m",{"key":28,"text":447,"correct":22},"0.5m",{"key":31,"text":449,"correct":26},"2m",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":20,"analysis":33},1266351,"低温热水地板辐射供暖系统安装，加热盘管管径、间距和长度应符合设计要求。间距偏差不大于（ ）。",[454,456,458,460],{"key":20,"text":455,"correct":26},"±10mm",{"key":24,"text":457,"correct":22},"±0mm",{"key":28,"text":459,"correct":22},"±5mm",{"key":31,"text":461,"correct":22},"±20mm",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":31,"analysis":33},1266352,"浴盆软管淋浴器挂钩的高度，当设计无要求时，应距地面（ ）m。",[466,467,468,469],{"key":20,"text":265,"correct":22},{"key":24,"text":269,"correct":22},{"key":28,"text":267,"correct":22},{"key":31,"text":470,"correct":26},"1.8",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":20,"analysis":33},1266353,"安装箱式消防栓，栓口应朝外，并不应安装在门轴处；栓口中心距地面为（ ），允许偏差为±20m，阀门中心距箱侧面为140mm，距箱后内表面为100mm，允许偏差±5mm，室内直埋给水管道（塑料管道和复合管道除外）应做防腐处理。埋地管道防腐层（ ）应符合设计要求。保证栓口与水龙带接驳顺利。",[475,477,479,481],{"key":20,"text":476,"correct":26},"1.1m",{"key":24,"text":478,"correct":22},"1.2m",{"key":28,"text":480,"correct":22},"1.08m",{"key":31,"text":482,"correct":22},"1.12m",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":20,"analysis":33},1266354,"施工前施工技术人员应向班组做图纸及施工技术（ ）工作，以确保工程施工顺利进行和工程质量",[487,489,491,493],{"key":20,"text":488,"correct":26},"交底",{"key":24,"text":490,"correct":22},"抽查",{"key":28,"text":492,"correct":22},"询问",{"key":31,"text":494,"correct":22},"监理",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":24,"analysis":33},1266355,"建筑排水U～PVC管立管的支承件间距，当立管外径为50mm时不大于1.2m，当立管外径大于75mm时间距不大于（ ）",[499,501,502,503],{"key":20,"text":500,"correct":22},"1m",{"key":24,"text":449,"correct":26},{"key":28,"text":445,"correct":22},{"key":31,"text":504,"correct":22},"3m",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":24,"analysis":33},1266356,"散热器支管长度超过（ ）时，应在支管上安装管卡。",[509,510,512,513],{"key":20,"text":500,"correct":22},{"key":24,"text":511,"correct":26},"1.5m",{"key":28,"text":447,"correct":22},{"key":31,"text":449,"correct":22},{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":24,"analysis":33},1266357,"地下室或地下构筑物外墙有管道穿过的，应采取防水措施。对有严格防水要求的建筑物，必须采用（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":22},"刚性防水套管",{"key":24,"text":521,"correct":26},"柔性防水套管",{"key":28,"text":523,"correct":22},"过墙壁套管",{"key":31,"text":525,"correct":22},"金属套管",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":24,"analysis":33},1266358,"插口插入承口时，公称直径大于（ ）mm的管道，可用缆绳系住管材用手拉葫芦等提力工具安装。",[530,532,534,536],{"key":20,"text":531,"correct":22},"300",{"key":24,"text":533,"correct":26},"400",{"key":28,"text":535,"correct":22},"500",{"key":31,"text":537,"correct":22},"600",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":20,"analysis":33},1266359,"冷、热水管道同时安装，上、下平行安装时热水管应在冷水管（ ），垂直平行安装时热水管应在冷水管左侧。",[542,544,546,548],{"key":20,"text":543,"correct":26},"上方",{"key":24,"text":545,"correct":22},"下方",{"key":28,"text":547,"correct":22},"前方",{"key":31,"text":549,"correct":22},"后方",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":31,"analysis":33},1266360,"某行政办公楼2012年3月主体工程施工完毕，开始进行给水排水管道安装施工，承包单位合理安排施工，严格把好质量关，2012年7月底工程顺利通过竣工验收并投入使用，请问管道施工时应注意哪些问题。 水表安装上游侧长度应有（ ）倍的水表直径的直管段。",[554,556,558,560],{"key":20,"text":555,"correct":22},"5～6",{"key":24,"text":557,"correct":22},"8～12",{"key":28,"text":559,"correct":22},"7～9",{"key":31,"text":561,"correct":26},"8～10",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":28,"analysis":33},1266361,"采暖系统人口装置及（ ）人户装置，应符合设计要求。安装位置应便于检修、维护和观察。",[566,568,570,572],{"key":20,"text":567,"correct":22},"分、集水器系统",{"key":24,"text":569,"correct":22},"热量表系统",{"key":28,"text":571,"correct":26},"分户热计量系统",{"key":31,"text":573,"correct":22},"热计量系统",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":31,"analysis":33},1266362,"（ ）立体感强，犹如做了一个工程的模型，其主要设备材料的规格数量，安装的标高、间距、坡向均有明确的标注，被广泛使用。",[578,580,582,584],{"key":20,"text":579,"correct":22},"系统草图",{"key":24,"text":581,"correct":22},"平面图",{"key":28,"text":583,"correct":22},"斜视图",{"key":31,"text":585,"correct":26},"轴测图",[587,590,593,596,599,602],{"id":15,"name":588,"category":7,"favorite":589},"领导干部任职前廉政法规知识测试题",92,{"id":591,"name":592,"category":7,"favorite":15},595,"建筑结构与设备",{"id":594,"name":595,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":597,"name":598,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":600,"name":601,"category":7,"favorite":8},534,"BIM工程师",{"id":603,"name":601,"category":7,"favorite":8},535]