[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-854-19":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},854,"(设备安装质量)专业管理实务 岗位知识","建筑工程",0,19,50,1024,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},1267164,3,"判断题","风管系统安装后，必须进行严密性检验，合格后方能交付下道工序。风管系统严密性检验以主、干管为主。在加工工艺得到保证的前提下，低压风管系统可采用漏光法检测。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":21,"analysis":27},1267165,"机械通风是依靠风机所产生的压力而强制空气流动的，可分为局部通风和全面通风。",[32,33],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":21,"analysis":27},1267166,"输送介质温度低于周围空气露点温度的管道，当采用非闭孔性绝热材料时，隔汽层（防潮层）必须完整，且封闭良好。",[38,39],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":21,"analysis":27},1267167,"风管和制作部件用的板材，应采用优质镀锌钢板，不得使用已经生锈的镀锌钢板。",[44,45],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":25,"analysis":27},1267168,"离心泵是叶片式泵中转数较高的一种泵，是属于中、大流量，中、低扬程的泵。",[50,51],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":21,"analysis":27},1267169,"镀锌钢板风管不得有镀锌层严重损坏的现象，如表层大面积白花、锌层粉化等。",[56,57],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":21,"analysis":27},1267170,"复合材料风管采用法兰连接时，法兰与风管板材的连接应可靠，其绝热层不得外露，不得采用降低板材强度和绝热性能的连接方法。",[62,63],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":21,"analysis":27},1267171,"塑料管道的弯头应尽量用人工弯曲而不用直角定型弯头，以利于自然补偿。",[68,69],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":25,"analysis":27},1267172,"电动阀安装前，应进行压力试验。",[74,75],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":25,"analysis":27},1267173,"集中式单风管空调系统要设置两根风管，处理后的空气通过风管送入末端装置，其送风量可单独调节。",[80,81],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":21,"analysis":27},1267174,"防火阀和排烟阀（排烟口）必须符合有关消防产品标准的规定，并具有相应的产品合格证明文件。",[86,87],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":21,"analysis":27},1267175,"空气用的制冷系统常用的有蒸汽压缩式制冷系统、溴化锂吸收式制冷系统和蒸汽喷射式制冷系统。",[92,93],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":21,"analysis":27},1267176,"时钟系统检测时，应检查时钟系统对其他系统主机的校时和授时功能，结果符合设计要求的应判定为合格。",[98,99],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1267177,"弱电间内对供配电系统检测时，电气装置与其他系统联锁动作的顺序及响应时间应符合设计要求。",[104,105],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":21,"analysis":27},1267178,"当对网络设备进行远程管理时，应检测防窃听措施。",[110,111],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":25,"analysis":27},1267179,"建筑设备监控系统检测应以系统性能测试为主，系统功能评测为辅。",[116,117],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":21,"analysis":27},1267180,"综合布线系统单项检测光纤链路或信道测试结果不满足设计要求的，该光纤链路或信道应判为不合格，未通过检测的链路或信道应在修复后复检。",[122,123],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":25,"analysis":27},1267181,"会议系统检测前，应检查会议系统引人电源和会场建声的检测记录。",[128,129],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":25,"analysis":27},1267182,"公共广播系统检测时，应打开广播分区的全部广播扬声器，测量点宜均匀布置在广播扬声器附近。",[134,135],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":21,"analysis":27},1267183,"对建筑智能化工程中的综合布线中光纤应全部测试，对绞线抽测10%，抽测点包括最远的布线点。",[140,141],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":21,"analysis":27},1267184,"安全技术防范系统检测时，应检查监控中心管理软件中电子地图显示的设备位置，且与现场位置一致的应判定为合格。",[146,147],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},1267185,"停车库（场）管理系统除应检测识别功能、控制功能、报警功能、出票验票功能、管理功能和显示功能外，还应检测紧急情况下的人工开闸功能。",[152,153],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":25,"analysis":27},1267186,"应用软件修改后，应进行重新测试，修改后的应用软件能满足软件需求规格说明的应判定为合格。",[158,159],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},1267187,"建筑物土建施工时的预留工作委托其他专业公司实施，要提供详细对的预留施工图，并派员实施指导或复核。",[164,165],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":21,"analysis":27},1267188,"会议讨论系统和会议同声传译系统应检测与火灾自动报警系统的联动功能。检测应判定为合格。",[170,171],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":21,"analysis":27},1267189,"安全技术防范系统中的各子系统可分别进行验收。",[176,177],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":25,"analysis":27},1267190,"信息引导及发布系统检测应以图像质量主观评价为主，系统功能检测为辅。",[182,183],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":21,"analysis":27},1267191,"公共广播系统检测时，应检测公共广播系统的应备声压级，检测结果符合设计要求的应判定为合格。",[188,189],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":25,"analysis":27},1267192,"具有会议电视功能的会议灯光系统，宜检测平均照度值。检测结果符合设计要求的应判定为合格。",[194,195],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":25,"analysis":27},1267193,"一次性抽样检测点（线对）不合格比例大于被测总数1%时，综合布线系统检测的综合判定结论应为不合格。",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},1267194,"建筑智能化工程系统多，涉及学科领域多，应用的设备、材料种类多，施工时要特别注意对使用说明书的阅读。",[206,207],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":25,"analysis":27},1267195,"计算机网络系统的连通性检测应符合在同-VLAN内的计算机之间应能交换数据包，不在同-VLAN内的计算机之间也能交换数据包的要求。",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":25,"analysis":27},1267196,"子钟能可靠接收二级母钟提供的标准时间信号；无二级母钟时间信号时，子钟能正常工作，但不能单独调时。",[218,219],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":25,"analysis":27},1267197,"电子巡查系统只需检测巡查设置功能、记录打印功能，管理功能可不检测。",[224,225],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1267198,"空调与采暖的冷、热源空调水系统的监测控制系统应成功运行，控制及故障报警功能应符合设计要求。",[230,231],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":21,"analysis":27},1267199,"散热设备、阀门、过滤器、温度计及仪表应按设计要求安装齐全，不得随意增减和更换。",[236,237],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":21,"analysis":27},1267200,"设计变更不得降低建筑节能效果。当设计变更涉及建筑节能效果时，应经原施工图设计审查机构审查，在实施前应办理设计变更手续，并获得监理或建设单位的确认。",[242,243],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":25,"analysis":27},1267201,"空调冷热水管穿楼板的绝热层应连续不间断，且绝热层与穿楼板和穿墙处的套管之间应用不燃材料填实，不得有空隙，套管两端应进行密封封堵。",[248,249],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1267202,"采暖系统应随施工进度对于节能有关的隐蔽部位或内容进行验收，并应有详细的文字记录和必要的图像资料。",[254,255],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":21,"analysis":27},1267203,"温度调控装置和热计量装置安装后，采暖系统应能实现设计要求的分室（区）温度调控、分栋热计量和分户或分室（区）热量分摊的功能。",[260,261],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":25,"analysis":27},1267204,"工程完成后应对低压配电系统进行调试，调试合格后应对低压配电电源运行进行检测。",[266,267],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":25,"analysis":27},1267205,"居住建筑有天然采光的楼梯间、走道的一般照明，应采用声控开关。",[272,273],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":25,"analysis":27},1267206,"空调冷（热）水系统，应能实现设计要求的定流量运行。",[278,279],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},1267207,"明装散热器恒温阀不应安装在狭小和封闭空间，其恒温阀阀头应水平安装，且不应被散热器、窗帘或其他障碍物遮挡。",[284,285],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":21,"analysis":27},1267208,"施工中出现的质量问题，应由施工单位负责整改。",[290,291],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":25,"analysis":27},1267209,"质量交底可以与技术交底同时进行，施工员不可邀请质量员共同参加对作业队组的质量交底工作。",[296,297],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":21,"analysis":27},1267210,"施工项目质量体系的建立，要符合企业的质量体系文件规定。",[302,303],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":25,"analysis":27},1267211,"PP-R管材的堆放高度要符合产品说明书的规定，通常不超过2.0m。",[308,309],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":21,"analysis":27},1267212,"一般缺陷是指对结构构件的受力性能或安装使用性能无决定性影响的缺陷。",[314,315],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":21,"analysis":27},1267213,"施工单位的质量控制目标，是通过施工全过程的全面质量自控，保证交付满足施工合同及设计文件所规定的质量标准的建筑工程产品。",[320,321],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]