[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-854-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},854,"(设备安装质量)专业管理实务 岗位知识","建筑工程",0,16,50,1024,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},1267014,3,"判断题","分项工程按主要工种、材料、施工工艺、设备类别等进行划分。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":21,"analysis":27},1267015,"特种设备监督检验的主体由国家特种设备安全监督管理部门核准的检验检测机构承担",[32,33],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":21,"analysis":27},1267016,"交接检验是由施工的完成方与承接方经双方检查，并对可否继续施工作出确认的活动。",[38,39],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":21,"analysis":27},1267017,"国家施工质量验收规范是最低的质量标准要求。",[44,45],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":25,"analysis":27},1267018,"按照《通风与空调工程施工质量验收规范》GB50243-2002规定制冷管道系统的阀门应做强度实验、气密性实验和真空实验。",[50,51],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":21,"analysis":27},1267019,"单位工程完工后，施工单位应组织有关人员进行自检。总监理工程师应组织各专业监理工程师对工程质量进行竣工预验收。存在施工质量问题时，应由施工单位及时整改。整改完毕后，由施工单位向建设单位提交工程竣工报告，申请工程竣工验收。",[56,57],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":25,"analysis":27},1267020,"验收记录应经参与验收的人员签字确认，而不合格通知单不需要。",[62,63],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":25,"analysis":27},1267021,"现行的《建筑电气工程施工质量验收规范》GB50303-2002适用于满足建筑物预期使用功能要求的电气安装工程施工质量验收，适应于电压等级为5Kv及以下。",[68,69],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":25,"analysis":27},1267022,"单位工程质量验收时，要求质量控制资料基本齐全。",[74,75],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":25,"analysis":27},1267023,"特种设备是涉及生命安全、危险性较大、造价较高的设备和设施的总称。",[80,81],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":21,"analysis":27},1267024,"消防气压给水设备的四周应有不小于0.7m的检修通道，其顶部至楼板或梁底的距离不宜小于0.6m。",[86,87],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":25,"analysis":27},1267025,"工程建设中拟采用的新技术、新工艺、新材料，不符合现行强制性标准规定的，不得采用。",[92,93],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":25,"analysis":27},1267026,"在材料进场验收时，发现有瑕疵，对质量有争议，可送有资质的检测单位进行检测，这属于强制性检测。",[98,99],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1267027,"按照《通风与空调工程施工质量验收规范》GB50243-2002规定制冷管道系统应做强度实验、气密性实验和真空实验。",[104,105],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":21,"analysis":27},1267028,"检验批的定义指按同一生产条件或按规定的方式汇总起来供检验用的，由一定数量样本组成的检验体。",[110,111],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":21,"analysis":27},1267029,"分项工程质量验收记录由总监理工程师或建设单位专业技术负责人填写。",[116,117],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":21,"analysis":27},1267030,"当参加验收的各方对建筑工程施工质量验收意见不一致时，可请工程质量监督机构协调处理。",[122,123],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":25,"analysis":27},1267031,"特种设备的安装、改造、维修单位具备了生产条件后就可以进行生产活动。",[128,129],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":25,"analysis":27},1267032,"依法经公安局审核消防设计的消防工程竣工后，建设单位应当向公安局申请消防验收。",[134,135],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":21,"analysis":27},1267033,"安装在室内的雨水管，安装完毕应作灌水试验。其灌水高度必须到每根立管上部的雨水斗。",[140,141],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":21,"analysis":27},1267034,"太阳能热水器的最低处应安装泄水装置。",[146,147],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":25,"analysis":27},1267035,"室内排水系统安装的工艺流程是：孔洞预留、埋件→预制加工→支管安装→立管安装→干管安装→灌水、通球试验→通水试验。",[152,153],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":21,"analysis":27},1267036,"各种承压管道系统和设备应做水压试验，非承压管道系统和设备应做灌水试验。",[158,159],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":25,"analysis":27},1267037,"给水排水工程中常用的型钢有圆钢、扁钢、槽钢，但工字钢不常用。",[164,165],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":25,"analysis":27},1267038,"锅炉和省煤器安全阀的定压和调整应符合规定。锅炉上装有两个安全阀时，其中的一个按表中较高值定压，另一个按较低值定压。装有一个安全阀时，应按较高值定压。",[170,171],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":25,"analysis":27},1267039,"给水管道必须采用与管材相适应的管件。生活给水系统所涉及的管材必须达到饮用水卫生标准。",[176,177],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":21,"analysis":27},1267040,"压力排水管道安装中，潜水泵与钢管应采用柔性材料连接。",[182,183],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":25,"analysis":27},1267041,"消防水泵接合器和消火栓的位置标志应明显，栓口的位置应方便操作。消防水泵接合器和室外消火栓当采用墙壁式时，如设计未要求，进、出水栓口的中心安装高度距地面为1.20m，其上方应设有防坠落物打击的措施。",[188,189],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":21,"analysis":27},1267042,"立式水泵的减振装置不应采用弹簧减振器。",[194,195],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":25,"analysis":27},1267043,"管道试压当中的系统试压指在干管敷设完毕后按设计和规范要求进行的水试压。",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},1267044,"排水栓和地漏的安装应平正、牢固，低于排水表面，地漏水封高度不得小于50mm。",[206,207],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":25,"analysis":27},1267045,"低温热水地板辐射供暖系统安装，在地面下敷设的盘管埋地部分允许有热熔接头。",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":21,"analysis":27},1267046,"中水设施也属于给水排水工程的一种。",[218,219],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":25,"analysis":27},1267047,"游泳池的给水口、回水口、泄水口可采用铸铁材料制造。",[224,225],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":21,"analysis":27},1267048,"生活给水系统管道在交付使用前必须冲洗和消毒，并经有关部门取样检验，符合国家《生活饮用水标准》方可使用。",[230,231],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":25,"analysis":27},1267049,"当发现管段漏水时，应及时返修作闭水试验，观察时间不应少于60min。",[236,237],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":25,"analysis":27},1267050,"卡箍式铸铁排水管的接口可以为柔性接口，也可以为非柔性接口，只要保证不漏即可以。",[242,243],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":25,"analysis":27},1267051,"试压管段长度一般超过1000m",[248,249],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":21,"analysis":27},1267052,"在管道的类别图例中，分区管道可用加注角标方式来表达。",[254,255],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":25,"analysis":27},1267053,"高层建筑中明设排水塑料管道应按设计要求设置防火套管。",[260,261],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":21,"analysis":27},1267054,"雨水管道不得与生活污水管道相连接。",[266,267],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":21,"analysis":27},1267055,"管道上使用冲压弯头时，所使用的冲压弯头外径与管道外径一致。",[272,273],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":25,"analysis":27},1267056,"排水管道的坡度必须符合设计要求，严禁倒坡。",[278,279],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},1267057,"管径不大于50mm时，宜采用截止阀，管道大于50mm时宜采用闸阀、蝶阀。",[284,285],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":21,"analysis":27},1267058,"雨水管道不得与生活污水管道相连接",[290,291],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":25,"analysis":27},1267059,"供暖系统试压合格后，应对系统进行冲洗并清扫除污器。",[296,297],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":25,"analysis":27},1267060,"热水供应系统竣工后必须进行通水。",[302,303],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":25,"analysis":27},1267061,"中水给水管道可装设取水水嘴，但不得与生活饮用水给水管道连接。",[308,309],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":25,"analysis":27},1267062,"输送生活给水的塑料管道不得露天架空铺设，必须露天架空铺时架空高度必须符合要求。",[314,315],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":21,"analysis":27},1267063,"以天然气为燃料的锅炉的天然气释放管或大气排放管不得直接通向大气，应通过储存或处理装置。",[320,321],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]