[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-854-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":709},{"id":5,"name":6,"category":7,"favorite":8},854,"(设备安装质量)专业管理实务 岗位知识","建筑工程",0,14,50,1024,[13,37,51,62,78,92,107,122,137,152,166,180,195,210,225,239,254,268,281,293,307,322,336,350,363,377,391,405,419,433,447,461,475,489,503,517,531,543,555,566,580,589,601,615,627,639,653,667,682,696],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":35,"analysis":36},1266914,2,"多选题","工程质量资料的基本要求包括（ ）。",[19,23,26,29,32],{"key":20,"text":21,"correct":22},"A","符合性要求",true,{"key":24,"text":25,"correct":22},"B","真实性要求",{"key":27,"text":28,"correct":22},"C","准确性要求",{"key":30,"text":31,"correct":22},"D","及时性要求",{"key":33,"text":34,"correct":22},"E","规范化要求","ABCDE","",{"id":38,"libraryId":5,"type":15,"typeLabel":16,"stem":39,"options":40,"answer":35,"analysis":36},1266915,"质量员要基本掌握（ ）的施工质量验收规范的主要条款，油漆要掌握其中的强制条款。",[41,43,45,47,49],{"key":20,"text":42,"correct":22},"给水排水工程",{"key":24,"text":44,"correct":22},"建筑电气工程",{"key":27,"text":46,"correct":22},"建筑智能化工程",{"key":30,"text":48,"correct":22},"自动喷水灭火工程",{"key":33,"text":50,"correct":22},"通风与空调工程",{"id":52,"libraryId":5,"type":15,"typeLabel":16,"stem":53,"options":54,"answer":35,"analysis":36},1266916,"按《建筑工程施工质量验收统一标准》GB50300-2001的规定，房屋建筑安装工程的实验以专业可划分为（ ）",[55,57,58,59,60],{"key":20,"text":56,"correct":22},"给水与排水工程",{"key":24,"text":44,"correct":22},{"key":27,"text":46,"correct":22},{"key":30,"text":50,"correct":22},{"key":33,"text":61,"correct":22},"消防工程",{"id":63,"libraryId":5,"type":15,"typeLabel":16,"stem":64,"options":65,"answer":77,"analysis":36},1266917,"施工组织设计编制的主要内容",[66,68,70,72,74],{"key":20,"text":67,"correct":22},"工程概况",{"key":24,"text":69,"correct":22},"施工部署",{"key":27,"text":71,"correct":22},"说明各项技术经济指标",{"key":30,"text":73,"correct":22},"施工准备计划",{"key":33,"text":75,"correct":76},"现场情况调查资料",false,"ABCD",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":91,"analysis":36},1266918,"质量计划编制依据（ ）。",[82,84,86,88,90],{"key":20,"text":83,"correct":22},"工程施工合同及相关的协议",{"key":24,"text":85,"correct":76},"施工方案",{"key":27,"text":87,"correct":22},"已批准的初步设计及有关的图纸资料",{"key":30,"text":89,"correct":22},"工程概算和主要工程量",{"key":33,"text":75,"correct":22},"ACDE",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":106,"analysis":36},1266919,"影响质量因素的4M1E为：人、（ ）、料、（ ）、环。",[96,98,100,102,104],{"key":20,"text":97,"correct":22},"机",{"key":24,"text":99,"correct":22},"法",{"key":27,"text":101,"correct":76},"记",{"key":30,"text":103,"correct":76},"思",{"key":33,"text":105,"correct":76},"费用","AB",{"id":108,"libraryId":5,"type":15,"typeLabel":16,"stem":109,"options":110,"answer":121,"analysis":36},1266920,"质量部门的主要职责（ ）。",[111,113,115,117,119],{"key":20,"text":112,"correct":76},"及时处理施工中发现的材料问题",{"key":24,"text":114,"correct":22},"参与技术部门组织的质量控制计划，并在实施执行中进行指导监督",{"key":27,"text":116,"correct":22},"组织按计划确定的施工现场质量检查工作",{"key":30,"text":118,"correct":76},"针对工程实际提出质量控制点的计划",{"key":33,"text":120,"correct":22},"针对工程实际提出质量控制点的设置","BCE",{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":136,"analysis":36},1266921,"某工程施工中，发生支模架坍塌事故，造成15人死亡，20人受伤。经调查，该事故主要是由于现场技术管理人员生病请假，工程负责人为了不影响施工进度，未经技术交底就吩咐工人自行作业造成的。该工程质量应判定为（ ）。",[126,128,130,132,134],{"key":20,"text":127,"correct":76},"技术原因引发的事故",{"key":24,"text":129,"correct":22},"管理原因引发的事故",{"key":27,"text":131,"correct":76},"特别重大事故",{"key":30,"text":133,"correct":22},"指导责任事故",{"key":33,"text":135,"correct":76},"重大质量事故","BD",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":151,"analysis":36},1266922,"施工准备的工作内容通常包括（ ）。",[141,143,145,147,149],{"key":20,"text":142,"correct":22},"技术准备",{"key":24,"text":144,"correct":22},"物资准备",{"key":27,"text":146,"correct":22},"施工现场准备",{"key":30,"text":148,"correct":76},"施工人员准备",{"key":33,"text":150,"correct":22},"施工场外","ABCE",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":151,"analysis":36},1266923,"《房屋建筑和市政基础设施工程竣工验收规定》工程竣工验收时，（ ）。",[156,158,160,162,164],{"key":20,"text":157,"correct":22},"建设、勘察、设计、施工、监理单位分别汇报工程合同履约情况和在工程建设各环节执行法律、法规和工程建设强制性标准的情况",{"key":24,"text":159,"correct":22},"审阅建设、勘察、设计、施工、监理单位的工程档案资料",{"key":27,"text":161,"correct":22},"实地查验工程质量",{"key":30,"text":163,"correct":76},"对工程实体质量进行抽测",{"key":33,"text":165,"correct":22},"对工程勘察、设计、施工、设备安装质量和各管理环节等方面作出全面评价，形成经验收组人员签署的工程竣工验收意见",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":77,"analysis":36},1266924,"《建设建设质量管理条例》规定（ ）依法对建设工程质量负责。",[170,172,174,176,178],{"key":20,"text":171,"correct":22},"建设单位",{"key":24,"text":173,"correct":22},"勘察单位、设计单位",{"key":27,"text":175,"correct":22},"施工单位",{"key":30,"text":177,"correct":22},"工程监理单位",{"key":33,"text":179,"correct":76},"工程质量检测单位",{"id":181,"libraryId":5,"type":15,"typeLabel":16,"stem":182,"options":183,"answer":194,"analysis":36},1266925,"ZC-8接地电阻测量仪使用的注意事项（ ）。",[184,186,188,190,192],{"key":20,"text":185,"correct":22},"接地极、电位探测针、电流探测针三者成一直线，电位探测针居中，三者等距，均为20m",{"key":24,"text":187,"correct":22},"接地极、电位探测针、电流探测针各自引出相同截面的绝缘电线接至仪表上，要一一对应不可错节",{"key":27,"text":189,"correct":76},"ZC-8如测量标度班读书大于1，应仪表放置于水平位置，检查调零",{"key":30,"text":191,"correct":22},"先将倍率标度置于最大倍数，慢转摇把，使零指示器位于中间位置，加快转动速度至120r\u002Fmin",{"key":33,"text":193,"correct":22},"ZC-8如测量标度班读书小于1，应仪表放置于水平位置，检查调零","ABDE",{"id":196,"libraryId":5,"type":15,"typeLabel":16,"stem":197,"options":198,"answer":209,"analysis":36},1266926,"管理要求编写的目的在于正确执行质量计划，要解决组织、（ ）、检测、（ ）等方面的问题。",[199,201,203,205,207],{"key":20,"text":200,"correct":22},"路径",{"key":24,"text":202,"correct":76},"监理",{"key":27,"text":204,"correct":76},"管理",{"key":30,"text":206,"correct":76},"施工",{"key":33,"text":208,"correct":22},"评价","AE",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":224,"analysis":36},1266927,"机械设备单机试运行的目的（ ）。",[214,216,218,220,222],{"key":20,"text":215,"correct":22},"判定设备本体性能是否符合设计预期要求",{"key":24,"text":217,"correct":76},"判定设备设计性能是否符合设计预期要求",{"key":27,"text":219,"correct":22},"辨识设备是否可以投入系统参加联合试运行",{"key":30,"text":221,"correct":76},"辨识设备是否可以投入系统参加单机试运行",{"key":33,"text":223,"correct":76},"保障其后期的正常运行","AC",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":77,"analysis":36},1266928,"在管理方面，造成质量问题的主要原因（ ）",[229,231,233,235,237],{"key":20,"text":230,"correct":22},"缺乏质量意识",{"key":24,"text":232,"correct":22},"管理混乱",{"key":27,"text":234,"correct":22},"施工准备不充分",{"key":30,"text":236,"correct":22},"缺少监督机制",{"key":33,"text":238,"correct":76},"意识不坚定",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":253,"analysis":36},1266929,"现场施工质量检查方法中，（ ）属于实测法。",[243,245,247,249,251],{"key":20,"text":244,"correct":76},"肉眼观察墙面喷涂的密实度",{"key":24,"text":246,"correct":76},"用敲击工具检查地面砖铺贴的密实度",{"key":27,"text":248,"correct":22},"用直尺检查地面的平整度",{"key":30,"text":250,"correct":22},"用线锤吊线检查墙面的垂直度",{"key":33,"text":252,"correct":76},"现场检测混凝土试件的抗压强度","CD",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":253,"analysis":36},1266930,"调试检测主要用的仪表（ ）",[258,260,262,264,266],{"key":20,"text":259,"correct":76},"声级计",{"key":24,"text":261,"correct":76},"水银温度计",{"key":27,"text":263,"correct":22},"微压计",{"key":30,"text":265,"correct":22},"风速仪",{"key":33,"text":267,"correct":76},"测试仪",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":91,"analysis":36},1266931,"方法控制包含（ ）。",[272,274,276,278,280],{"key":20,"text":273,"correct":22},"施工组织设计",{"key":24,"text":275,"correct":76},"施工计划",{"key":27,"text":277,"correct":22},"施工工艺",{"key":30,"text":279,"correct":22},"施工技术措施",{"key":33,"text":85,"correct":22},{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":292,"analysis":36},1266932,"施工组织计划的类型（ ）。",[285,287,288,289,290],{"key":20,"text":286,"correct":22},"施工组织总设计",{"key":24,"text":273,"correct":22},{"key":27,"text":275,"correct":76},{"key":30,"text":85,"correct":22},{"key":33,"text":291,"correct":76},"施工进度方案","ABD",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":35,"analysis":36},1266933,"质量事故调查处理程序是（ ）",[297,299,301,303,305],{"key":20,"text":298,"correct":22},"事故报告",{"key":24,"text":300,"correct":22},"现场保护",{"key":27,"text":302,"correct":22},"事故调查",{"key":30,"text":304,"correct":22},"形成事故处理报告",{"key":33,"text":306,"correct":22},"编写事故调查报告",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":321,"analysis":36},1266934,"质量管理发展的几个阶段（ ）",[311,313,315,317,319],{"key":20,"text":312,"correct":76},"事故检查阶段",{"key":24,"text":314,"correct":22},"统计质量管理阶段",{"key":27,"text":316,"correct":76},"做好事前质量控制的物资准备工作",{"key":30,"text":318,"correct":22},"质量管理与质量保证阶段",{"key":33,"text":320,"correct":22},"质量检查阶段","BDE",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":35,"analysis":36},1266935,"设备安装工程试运行的条件（ ）。",[326,328,330,332,334],{"key":20,"text":327,"correct":22},"试运行的方案已批准",{"key":24,"text":329,"correct":22},"试运行范围内的工程已按合同约定全部完工，并经自检静态查质量合格。",{"key":27,"text":331,"correct":22},"试运行所需的电力、供水、供气均接入到位",{"key":30,"text":333,"correct":22},"试运行涉及的环境、场地已清理",{"key":33,"text":335,"correct":22},"对试运行准备工作进行查检，确认符合方案要求",{"id":337,"libraryId":5,"type":15,"typeLabel":16,"stem":338,"options":339,"answer":194,"analysis":36},1266936,"材料质量检验一般有（ ）等4种方法。",[340,342,344,346,348],{"key":20,"text":341,"correct":22},"书面检验（查书面资料）",{"key":24,"text":343,"correct":22},"外观检验",{"key":27,"text":345,"correct":76},"试用检验",{"key":30,"text":347,"correct":22},"理化检验",{"key":33,"text":349,"correct":22},"无损检验",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":77,"analysis":36},1266937,"根据工程质量事故造成的人员伤亡或者直接经济损失，工程质量事故分为（ ）等级。",[354,355,357,359,361],{"key":20,"text":131,"correct":22},{"key":24,"text":356,"correct":22},"重大事故",{"key":27,"text":358,"correct":22},"较大事故",{"key":30,"text":360,"correct":22},"一般事故",{"key":33,"text":362,"correct":76},"普通事故",{"id":364,"libraryId":5,"type":15,"typeLabel":16,"stem":365,"options":366,"answer":209,"analysis":36},1266938,"施工项目质量问题的原因有很多，（ ）是属于施工与管理不到位的原因。",[367,369,371,373,375],{"key":20,"text":368,"correct":22},"未经设计单位同意擅自修改设计",{"key":24,"text":370,"correct":76},"未搞清工程地质情况仓促开工",{"key":27,"text":372,"correct":76},"水泥安定性不良",{"key":30,"text":374,"correct":76},"采用不正确的结构方案",{"key":33,"text":376,"correct":22},"施工方案考虑不周，施工顺序颠倒",{"id":378,"libraryId":5,"type":15,"typeLabel":16,"stem":379,"options":380,"answer":35,"analysis":36},1266939,"属于ISO\u002FTC176整理并编撰八项质量管理原则（ ）。",[381,383,385,387,389],{"key":20,"text":382,"correct":22},"以顾客为关注焦点",{"key":24,"text":384,"correct":22},"领导作用",{"key":27,"text":386,"correct":22},"全员参与",{"key":30,"text":388,"correct":22},"工程方法",{"key":33,"text":390,"correct":22},"持续改进",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":292,"analysis":36},1266940,"隐藏工程记录包含（ ）。",[395,397,399,401,403],{"key":20,"text":396,"correct":22},"隐藏的部位，查阅各专业施工图纸",{"key":24,"text":398,"correct":22},"隐藏的时间，与施工员沟通作业计划的安排，并如期至作业面查核",{"key":27,"text":400,"correct":76},"检验批的质量检查标准，按相关专业施工质量规范规定进行",{"key":30,"text":402,"correct":22},"隐藏前检查或实验要求，查阅相关专业的施工质量验收规范",{"key":33,"text":404,"correct":76},"检查各项是否符合要求",{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":106,"analysis":36},1266941,"产品分为（ ）。",[409,411,413,415,417],{"key":20,"text":410,"correct":22},"有形产品",{"key":24,"text":412,"correct":22},"无形产品",{"key":27,"text":414,"correct":76},"物质产品",{"key":30,"text":416,"correct":76},"精神产品",{"key":33,"text":418,"correct":76},"增值产品",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":77,"analysis":36},1266942,"工程质量管理中质量管理通常包括分为（ ）。",[423,425,427,429,431],{"key":20,"text":424,"correct":22},"制定质量方针和质量目标",{"key":24,"text":426,"correct":22},"质量策划",{"key":27,"text":428,"correct":22},"质量控制",{"key":30,"text":430,"correct":22},"质量保证和质量改进",{"key":33,"text":432,"correct":76},"质量验收",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":35,"analysis":36},1266943,"《工程建设施工企业质量管理规范》与ISO9000标准表现一致性具体为（ ）。",[437,439,441,443,445],{"key":20,"text":438,"correct":22},"质量价值观是完全一致的",{"key":24,"text":440,"correct":22},"理论基础是完全一致的",{"key":27,"text":442,"correct":22},"管理理念是完全一致的",{"key":30,"text":444,"correct":22},"目的是完全一致的和评价要求是完全一致的",{"key":33,"text":446,"correct":22},"评价要求是完全一致的",{"id":448,"libraryId":5,"type":15,"typeLabel":16,"stem":449,"options":450,"answer":151,"analysis":36},1266944,"对形成的资料进行鉴别是档案管理工作的重要内容之一，鉴别工作内容主要有（ ）。",[451,453,455,457,459],{"key":20,"text":452,"correct":22},"资料的完整性",{"key":24,"text":454,"correct":22},"资料的准确性",{"key":27,"text":456,"correct":22},"资料的属性",{"key":30,"text":458,"correct":76},"资料的准备情况",{"key":33,"text":460,"correct":22},"保管期限",{"id":462,"libraryId":5,"type":15,"typeLabel":16,"stem":463,"options":464,"answer":35,"analysis":36},1266945,"项目的质量体系应（ ）建立质量体系，实现对影响质量的施工全过程中有效控制。",[465,467,469,471,473],{"key":20,"text":466,"correct":22},"组织结构",{"key":24,"text":468,"correct":22},"责任与权限",{"key":27,"text":470,"correct":22},"运作程序",{"key":30,"text":472,"correct":22},"路径工程",{"key":33,"text":474,"correct":22},"资源",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":106,"analysis":36},1266946,"喷淋干管为卡箍式连接，属于柔性连接，柔性连接口是管道震动发生泄漏的薄弱环节，所以每个接口处至少有1支架进行刚性固定，其目的（ ）",[479,481,483,485,487],{"key":20,"text":480,"correct":22},"最大限度的减小接口处的振幅",{"key":24,"text":482,"correct":22},"保护运行中的安全",{"key":27,"text":484,"correct":76},"减少管道的泄漏",{"key":30,"text":486,"correct":76},"平衡管道受力",{"key":33,"text":488,"correct":76},"避免管道震动",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":253,"analysis":36},1266947,"分项工程质量计划编制步骤有：建立组织、制订计划、（ ）、按分工进行编写、（ ）、初审后改进、上级审核批复。",[493,495,497,499,501],{"key":20,"text":494,"correct":76},"确定负责人",{"key":24,"text":496,"correct":76},"跟踪检查",{"key":27,"text":498,"correct":22},"整理资料",{"key":30,"text":500,"correct":22},"编写组内部初审",{"key":33,"text":502,"correct":76},"归纳并分析合同文件",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":77,"analysis":36},1266948,"从试验状态划分，设备安装工程试验划分为静态试验和动态考核两类，动态考核又分为（ ）",[507,509,511,513,515],{"key":20,"text":508,"correct":22},"单机试运转",{"key":24,"text":510,"correct":22},"无负荷试运转",{"key":27,"text":512,"correct":22},"负荷试运转",{"key":30,"text":514,"correct":22},"系统联合试运转",{"key":33,"text":516,"correct":76},"动力设备受电力驱使而运转",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":151,"analysis":36},1266949,"质量员在检验批检查时，应做好下列工作（ ）。",[521,523,525,527,529],{"key":20,"text":522,"correct":22},"核对各工序中所用的原材料、半成品、成品、设备质量证明文件",{"key":24,"text":524,"correct":22},"检查各工序中所用的原材料、半成品、成品、设备是否按专业规范和试验方案进行现场抽样检测，检测结果是否符合要求，检测结果不符合要求的不得用于工程",{"key":27,"text":526,"correct":22},"检查主控项目、一般项目是否符合要求，允许偏差项目实测实量",{"key":30,"text":528,"correct":76},"填写隐蔽工程质量验收记录",{"key":33,"text":530,"correct":22},"填写检验批质量验收记录",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":77,"analysis":36},1266950,"单位工程施工组织设计内容（ ）。",[535,536,537,539,541],{"key":20,"text":67,"correct":22},{"key":24,"text":69,"correct":22},{"key":27,"text":538,"correct":22},"施工进度计划",{"key":30,"text":540,"correct":22},"主要施工管理计划",{"key":33,"text":542,"correct":76},"施工要求",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":151,"analysis":36},1266951,"物资部门主要职责（ ）.",[547,548,550,551,553],{"key":20,"text":316,"correct":22},{"key":24,"text":549,"correct":22},"组织物资的进场验收，确保合格产品用到工程上，把好质量控制的管件一关",{"key":27,"text":112,"correct":22},{"key":30,"text":552,"correct":76},"组织事前质量控制是技术准备工作",{"key":33,"text":554,"correct":22},"保持检测用仪器、仪表在使用有效期内",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":106,"analysis":36},1266952,"计划部门主要职责（ ）。",[559,561,563,564,565],{"key":20,"text":560,"correct":22},"各类进度计划的安排要符合工艺技术规律，确保工程质量得到有效控制",{"key":24,"text":562,"correct":22},"安排好图纸会率、竣工验收、内外沟通、洽谈协商等各类与质量控制有关活动的时间、地点，并做好相关的准备工作",{"key":27,"text":552,"correct":76},{"key":30,"text":554,"correct":76},{"key":33,"text":116,"correct":76},{"id":567,"libraryId":5,"type":15,"typeLabel":16,"stem":568,"options":569,"answer":224,"analysis":36},1266953,"防排烟系统包括（ ）。",[570,572,574,576,578],{"key":20,"text":571,"correct":22},"正压送风系统",{"key":24,"text":573,"correct":76},"正压回风系统",{"key":27,"text":575,"correct":22},"排烟系统",{"key":30,"text":577,"correct":76},"灭火系统",{"key":33,"text":579,"correct":76},"电气系统",{"id":581,"libraryId":5,"type":15,"typeLabel":16,"stem":582,"options":583,"answer":35,"analysis":36},1266954,"质量资料的基本要求包括（ ）",[584,585,586,587,588],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":28,"correct":22},{"key":30,"text":31,"correct":22},{"key":33,"text":34,"correct":22},{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":151,"analysis":36},1266955,"属于质量管理八项原则的具体内容的有（ ）。",[593,594,596,598,600],{"key":20,"text":386,"correct":22},{"key":24,"text":595,"correct":22},"过程方法",{"key":27,"text":597,"correct":22},"与供方互利的关系",{"key":30,"text":599,"correct":76},"全面质量控制",{"key":33,"text":390,"correct":22},{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":292,"analysis":36},1266956,"质量问题主要形成原因（ ）。",[605,607,609,611,613],{"key":20,"text":606,"correct":22},"人的意识方面",{"key":24,"text":608,"correct":22},"管理混乱、机制不健全",{"key":27,"text":610,"correct":76},"建筑材料问题",{"key":30,"text":612,"correct":22},"环境条件不符合要求、防护措施不当",{"key":33,"text":614,"correct":76},"技术措施不合理",{"id":616,"libraryId":5,"type":15,"typeLabel":16,"stem":617,"options":618,"answer":626,"analysis":36},1266957,"技术部门主要职责（ ）。",[619,620,622,624,625],{"key":20,"text":552,"correct":22},{"key":24,"text":621,"correct":22},"编制事后质量控制的试运行和联动试车方案，并参加实施",{"key":27,"text":623,"correct":22},"对新技术、新工艺、新材料等的应用编制质量控制指导性文件，并参与推广",{"key":30,"text":554,"correct":76},{"key":33,"text":116,"correct":76},"ABC",{"id":628,"libraryId":5,"type":15,"typeLabel":16,"stem":629,"options":630,"answer":77,"analysis":36},1266958,"（ ）等单位工程项目负责人应对本单位工程文件资料形成的全过程负总责。建设过程中工程文件资料的形成、收集、整理和审核应符合有关规定，签字并加盖相应的资格印章。",[631,633,634,636,637],{"key":20,"text":632,"correct":22},"建设",{"key":24,"text":202,"correct":22},{"key":27,"text":635,"correct":22},"勘察、设计",{"key":30,"text":206,"correct":22},{"key":33,"text":638,"correct":76},"材料供应",{"id":640,"libraryId":5,"type":15,"typeLabel":16,"stem":641,"options":642,"answer":77,"analysis":36},1266959,"施工质量策划的结果（ ）。",[643,645,647,649,651],{"key":20,"text":644,"correct":22},"确定质量目标",{"key":24,"text":646,"correct":22},"建立管理组织机构",{"key":27,"text":648,"correct":22},"制定项目部各级部门和人员的职责",{"key":30,"text":650,"correct":22},"编制施工组织计划或质量计划",{"key":33,"text":652,"correct":76},"对资料员进行培训，以提高其业务能力好责任心",{"id":654,"libraryId":5,"type":15,"typeLabel":16,"stem":655,"options":656,"answer":151,"analysis":36},1266960,"施工准备的范围包括（ ）。",[657,659,661,663,665],{"key":20,"text":658,"correct":22},"项目开工后的施工准备",{"key":24,"text":660,"correct":22},"单位工程施工准备",{"key":27,"text":662,"correct":22},"分项工程施工准备",{"key":30,"text":664,"correct":76},"施工项目有方案准备",{"key":33,"text":666,"correct":22},"项目开工前的施工准备",{"id":668,"libraryId":5,"type":15,"typeLabel":16,"stem":669,"options":670,"answer":681,"analysis":36},1266961,"质量控制包括（ ）。",[671,673,675,677,679],{"key":20,"text":672,"correct":76},"预算质量控制",{"key":24,"text":674,"correct":22},"事前质量控制",{"key":27,"text":676,"correct":22},"事中质量控制",{"key":30,"text":678,"correct":22},"事后质量控制",{"key":33,"text":680,"correct":76},"计划质量控制","BCD",{"id":683,"libraryId":5,"type":15,"typeLabel":16,"stem":684,"options":685,"answer":77,"analysis":36},1266962,"列属于建设单位在工程档案管理中的职责有（ ）。",[686,688,690,692,694],{"key":20,"text":687,"correct":22},"设专人负责建设工程文件的收集、整理和归档工作",{"key":24,"text":689,"correct":22},"负责在工程建设过程中对工程档案进行检查并签署意见",{"key":27,"text":691,"correct":22},"负责组织竣工图的绘制工作",{"key":30,"text":693,"correct":22},"负责组织工程档案的编制工作",{"key":33,"text":695,"correct":76},"按要求在竣工前将施工文件整理汇总完毕",{"id":697,"libraryId":5,"type":15,"typeLabel":16,"stem":698,"options":699,"answer":626,"analysis":36},1266963,"质量员属项目部基层质量管理人员，直接负责（ ），消除或减少质量缺陷是其应急的职责。",[700,702,704,706,708],{"key":20,"text":701,"correct":22},"施工作业队组作业质量的指导和监督",{"key":24,"text":703,"correct":22},"积累资料，经分析整理",{"key":27,"text":705,"correct":22},"定期向领导层汇报工程质量问题的发展趋势",{"key":30,"text":707,"correct":76},"不定期向领导层汇报工程质量问题的发展趋势",{"key":33,"text":230,"correct":76},[710,714,717,720,723,726],{"id":711,"name":712,"category":7,"favorite":713},1,"领导干部任职前廉政法规知识测试题",92,{"id":715,"name":716,"category":7,"favorite":711},595,"建筑结构与设备",{"id":718,"name":719,"category":7,"favorite":711},715,"招标采购专业知识与法律法规",{"id":721,"name":722,"category":7,"favorite":711},848,"市政方向-通用基础",{"id":724,"name":725,"category":7,"favorite":8},534,"BIM工程师",{"id":727,"name":725,"category":7,"favorite":8},535]