[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-854-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":727},{"id":5,"name":6,"category":7,"favorite":8},854,"(设备安装质量)专业管理实务 岗位知识","建筑工程",0,13,50,1024,[13,38,53,68,82,97,111,126,140,155,170,185,200,215,229,242,255,269,283,297,311,325,339,354,368,382,395,409,423,435,448,462,476,488,502,517,531,544,555,570,585,599,613,628,642,656,670,684,698,712],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1266864,2,"多选题","建筑设备监控系统可靠性检测内容应包括（ ）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","报警信号响应时间",false,{"key":24,"text":25,"correct":22},"B","设备和网络通信故障的自检测功能",{"key":27,"text":28,"correct":29},"C","系统运行的抗干扰性能",true,{"key":31,"text":32,"correct":29},"D","电源切换时系统运行的稳定性",{"key":34,"text":35,"correct":22},"E","设备的复位","CD","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1266865,"安全防范综合管理系统的功能检测包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":29},"布防、撤防功能",{"key":24,"text":45,"correct":29},"监控图像、报警信息以及其他信息记录的质量和保存时间",{"key":27,"text":47,"correct":29},"安全技术防范系统中的各子系统之间的联动，安全技术防范系统与火灾自动报警系统和应急响应系统的联动、报警信号的输出接口",{"key":31,"text":49,"correct":29},"安全技术防范系统中的各子系统对监控中心控制命令的响应准确性和实时性，监控中心对安全技术防范系统中的各子系统工作状态的显示、报警信息的准确性和实时性",{"key":34,"text":51,"correct":22},"停电报警","ABCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1266866,"下面关于在建筑智能化工程施工中的供电电源的叙述，错误的是（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"对智能化工程的施工时，供电电源至少应为一路",{"key":24,"text":60,"correct":29},"对重要的设备配不间断电源UPS供电",{"key":27,"text":62,"correct":29},"UPS配置的方式可采取随设备分散供电或UPS集中供电",{"key":31,"text":64,"correct":29},"对智能化工程的施工时，供电电源至少应为两路",{"key":34,"text":66,"correct":22},"供电电源不可在末端自动切换","BCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":67,"analysis":37},1266867,"下列（ ）是出人口控制系统的检测内容。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"防破坏及故障报警功能",{"key":24,"text":75,"correct":29},"出人目标识读装置功能",{"key":27,"text":77,"correct":29},"信息处理\u002F控制设备功能",{"key":31,"text":79,"correct":29},"执行机构功能",{"key":34,"text":81,"correct":22},"和公安系统联动",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},1266868,"时钟系统检测应以（ ）功能为主，其他功能为辅。",[86,88,90,92,94],{"key":20,"text":87,"correct":29},"接收",{"key":24,"text":89,"correct":22},"同步",{"key":27,"text":91,"correct":22},"校时",{"key":31,"text":93,"correct":29},"授时",{"key":34,"text":95,"correct":22},"准时","AD",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":52,"analysis":37},1266869,"会议电视系统性能评价的检测宜包括（ ）。",[101,103,105,107,109],{"key":20,"text":102,"correct":29},"声音延时",{"key":24,"text":104,"correct":29},"声像同步",{"key":27,"text":106,"correct":29},"会议电视回声",{"key":31,"text":108,"correct":29},"图像清晰度和图像连续性",{"key":34,"text":110,"correct":22},"亮度",{"id":112,"libraryId":5,"type":15,"typeLabel":16,"stem":113,"options":114,"answer":125,"analysis":37},1266870,"智能建筑工程设备材料进场检验记录应由施工单位填写，（ ）作出检查结论。",[115,117,119,121,123],{"key":20,"text":116,"correct":22},"施工单位质检员",{"key":24,"text":118,"correct":29},"监理单位监理工程师",{"key":27,"text":120,"correct":22},"施工单位专业技术负责人",{"key":31,"text":122,"correct":29},"建设单位项目专业工程师",{"key":34,"text":124,"correct":22},"承担系统检测的检测人员","BD",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":52,"analysis":37},1266871,"数字信号的有线电视系统主观评价的项目包括（ ）。",[130,132,134,136,138],{"key":20,"text":131,"correct":29},"图像、声音质量",{"key":24,"text":133,"correct":29},"唇音同步",{"key":27,"text":135,"correct":29},"节目频道切换",{"key":31,"text":137,"correct":29},"字幕",{"key":34,"text":139,"correct":22},"紧急广播",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":154,"analysis":37},1266872,"对于要求物理隔离的网络，应进行物理隔离检测，且检测结果符合（ ）规定的应为检测合格。",[144,146,148,150,152],{"key":20,"text":145,"correct":29},"物理实体上应完全分开",{"key":24,"text":147,"correct":29},"不应存在共享的物理设备",{"key":27,"text":149,"correct":22},"应能够同时与互联网连接",{"key":31,"text":151,"correct":29},"不应有任何链路上的连接",{"key":34,"text":153,"correct":22},"网络管理员的要求","ABD",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":169,"analysis":37},1266873,"对有线电视及卫星电视接收系统进行主观评价和客观测试时，应选用标准测试点，对标准测试点的选择以下（ ）符合规范要求。",[159,161,163,165,167],{"key":20,"text":160,"correct":29},"系统的输出端口数量小于1000时，测试点不得少于2个；系统的输出端口数量大于等于1000时，每1000点应选取（2~3）个测试点",{"key":24,"text":162,"correct":22},"对于基于HFC或同轴传输的双向数字电视系统，主观评价的测试点数选择，当系统的输出端口数量小于1000时，测试点不得少于2个；系统的输出端口数量大于等于1000时，每1000点应选取1个测试点",{"key":27,"text":164,"correct":29},"对于基于HFC或同轴传输的双向数字电视系统，客观测试点的数量不应少于系统输出端口数量的5％，测试点数不应少于20个",{"key":31,"text":166,"correct":29},"测试点应至少有一个位于系统中主干线的最后一个分配放大器之后的点",{"key":34,"text":168,"correct":22},"测试点应至少有两个位于系统中主干线的最后一个分配放大器之后的点","ACD",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":184,"analysis":37},1266874,"《智能建筑工程质量验收规范》GB50399-2013中，信息化应用系统按构成要素分为（ ）。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"线路",{"key":24,"text":177,"correct":29},"设备",{"key":27,"text":179,"correct":29},"软件",{"key":31,"text":181,"correct":22},"接口",{"key":34,"text":183,"correct":22},"局域网","BC",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":199,"analysis":37},1266875,"采用融合承载通信架构的智能化设备网，计算机网络系统的检测除连通性、传输时延、丢包率、路由、容错功能、网络管理功能和无线局域网功能检测外，还应进行（ ）检测。",[189,191,193,195,197],{"key":20,"text":190,"correct":29},"组播功能",{"key":24,"text":192,"correct":22},"访问控制",{"key":27,"text":194,"correct":29},"QoS功能",{"key":31,"text":196,"correct":22},"人侵防范",{"key":34,"text":198,"correct":22},"系统电阻","AC",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":214,"analysis":37},1266876,"智能建筑工程实施的质量控制应检查（ ）。",[204,206,208,210,212],{"key":20,"text":205,"correct":29},"图纸会审记录；存在设计变更和工程洽商时，还应检查设计变更记录和工程洽商记录",{"key":24,"text":207,"correct":29},"设备材料进场检验记录和设备开箱检验记录",{"key":27,"text":209,"correct":29},"试运行记录",{"key":31,"text":211,"correct":22},"分部工程质量验收记录",{"key":34,"text":213,"correct":22},"调试人员的资格证书","ABC",{"id":216,"libraryId":5,"type":15,"typeLabel":16,"stem":217,"options":218,"answer":169,"analysis":37},1266877,"下面属于智能化工程竣工验收资料的是（ ）。",[219,221,223,225,227],{"key":20,"text":220,"correct":29},"工程合同技术文件",{"key":24,"text":222,"correct":22},"招标文件和投标文件",{"key":27,"text":224,"correct":29},"竣工图",{"key":31,"text":226,"correct":29},"设备、器件、材料等产品说明书",{"key":34,"text":228,"correct":22},"工程进度控制表",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":67,"analysis":37},1266878,"公共广播系统可包括（ ）。检测和验收的范围应根据设计要求确定。",[233,235,237,239,240],{"key":20,"text":234,"correct":22},"舞台广播",{"key":24,"text":236,"correct":29},"业务广播",{"key":27,"text":238,"correct":29},"背景音乐",{"key":31,"text":139,"correct":29},{"key":34,"text":241,"correct":22},"无线广播",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":154,"analysis":37},1266879,"当紧急广播系统具有火灾应急广播功能时，应检查（ ）的防火保护措施。",[246,248,250,251,253],{"key":20,"text":247,"correct":29},"槽盒",{"key":24,"text":249,"correct":29},"传输线缆",{"key":27,"text":177,"correct":22},{"key":31,"text":252,"correct":29},"导管",{"key":34,"text":254,"correct":22},"设备室",{"id":256,"libraryId":5,"type":15,"typeLabel":16,"stem":257,"options":258,"answer":52,"analysis":37},1266880,"公共广播系统检测时，应检测紧急广播的功能和性能，当紧急广播包括火灾应急广播功能时，还应检测下列（ ）内容。",[259,261,263,265,267],{"key":20,"text":260,"correct":29},"紧急广播具有最高级别的优先权",{"key":24,"text":262,"correct":29},"警报信号触发后，紧急广播向相关广播区播放警示信号、警报语声文件或实时指挥语声的响应时间",{"key":27,"text":264,"correct":29},"设备的热备用功能、定时自检和故障自动告警功能",{"key":31,"text":266,"correct":29},"手动发布紧急广播的一键到位功能",{"key":34,"text":268,"correct":22},"自动控制",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":169,"analysis":37},1266881,"检测时钟系统的使用可靠性时，符合（ ）条件的应判定为合格。",[273,275,277,279,281],{"key":20,"text":274,"correct":29},"母钟在正常使用条件下不停走",{"key":24,"text":276,"correct":22},"母钟在非正常使用条件下停走",{"key":27,"text":278,"correct":29},"子钟在正常使用条件下不停走",{"key":31,"text":280,"correct":29},"时间显示正常且清楚",{"key":34,"text":282,"correct":22},"显示时间",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":214,"analysis":37},1266882,"智能建筑的防雷与接地系统检测应检查接地装置及接地连接点的安装，接地电阻的阻值，（ ）和接地导体的规格、敷设方法和连接方法，结果符合设计要求的应判定为合格。",[287,289,291,293,295],{"key":20,"text":288,"correct":29},"等电位联结带的规格、联结方法和安装位置",{"key":24,"text":290,"correct":29},"屏蔽设施的安装",{"key":27,"text":292,"correct":29},"电涌保护器的性能参数、安装位置、安装方式和连接导线规格",{"key":31,"text":294,"correct":22},"接闪器的规格、敷设方式和位置",{"key":34,"text":296,"correct":22},"电容容量",{"id":298,"libraryId":5,"type":15,"typeLabel":16,"stem":299,"options":300,"answer":52,"analysis":37},1266883,"电梯和自动扶梯监测系统应检测（ ）等运行状态显示功能。检测结果符合设计要求的应判定为合格。",[301,303,305,307,309],{"key":20,"text":302,"correct":29},"启停",{"key":24,"text":304,"correct":29},"上下行",{"key":27,"text":306,"correct":29},"位置",{"key":31,"text":308,"correct":29},"故障",{"key":34,"text":310,"correct":22},"超重",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":214,"analysis":37},1266884,"对具备容错能力的计算机网络系统，应具有（ ）功能。",[315,317,319,321,323],{"key":20,"text":316,"correct":29},"错误恢复",{"key":24,"text":318,"correct":29},"故障隔离",{"key":27,"text":320,"correct":29},"出现故障时自动切换",{"key":31,"text":322,"correct":22},"自动关机",{"key":34,"text":324,"correct":22},"报警",{"id":326,"libraryId":5,"type":15,"typeLabel":16,"stem":327,"options":328,"answer":52,"analysis":37},1266885,"公共广播系统检测时，应检测公共广播系统的（ ），检测结果符合设计要求的应判定为合格。",[329,331,333,335,337],{"key":20,"text":330,"correct":29},"扬声器位置",{"key":24,"text":332,"correct":29},"声场不均匀度",{"key":27,"text":334,"correct":29},"漏出声衰减",{"key":31,"text":336,"correct":29},"系统设备信噪比",{"key":34,"text":338,"correct":22},"立体声",{"id":340,"libraryId":5,"type":15,"typeLabel":16,"stem":341,"options":342,"answer":353,"analysis":37},1266886,"下面属于建筑设备自动监控系统（BAS）的是（ ）。",[343,345,347,349,351],{"key":20,"text":344,"correct":29},"空调与通风系统的监控",{"key":24,"text":346,"correct":29},"给水排水系统的监控",{"key":27,"text":348,"correct":29},"热源及热交换系统的监控",{"key":31,"text":350,"correct":29},"电梯和自动扶梯系统的监控",{"key":34,"text":352,"correct":29},"制冷及冷交换系统的监控","ABCDE",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":52,"analysis":37},1266887,"信息化应用系统检测时，应检查设备的性能指标，结果符合设计要求的应判定为合格。对于智能卡设备还应检测（ ）。",[358,360,362,364,366],{"key":20,"text":359,"correct":29},"智能卡与读写设备间的有效作用距离",{"key":24,"text":361,"correct":29},"智能卡与读写设备间的通信传输速率",{"key":27,"text":363,"correct":29},"智能卡与读写设备间的读写验证处理时间",{"key":31,"text":365,"correct":29},"智能卡序号的唯一性",{"key":34,"text":367,"correct":22},"超出范围是否报警",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":154,"analysis":37},1266888,"智能建筑的接地系统必须保证（ ）。",[372,374,376,378,380],{"key":20,"text":373,"correct":29},"建筑内各智能化系统的正常运行",{"key":24,"text":375,"correct":29},"人身安全",{"key":27,"text":377,"correct":22},"屏蔽设施安全",{"key":31,"text":379,"correct":29},"设备安全。",{"key":34,"text":381,"correct":22},"电阻大于5M?",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":154,"analysis":37},1266889,"会议灯光系统的检测宜包括（ ）。",[386,388,390,392,394],{"key":20,"text":387,"correct":29},"照度",{"key":24,"text":389,"correct":29},"色温",{"key":27,"text":391,"correct":22},"功率密度",{"key":31,"text":393,"correct":29},"显色系数",{"key":34,"text":110,"correct":22},{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":52,"analysis":37},1266890,"智能建筑工程接口测试文件应包括（ ）等内容。",[399,401,403,405,407],{"key":20,"text":400,"correct":29},"测试链路搭建",{"key":24,"text":402,"correct":29},"测试用仪器仪表",{"key":27,"text":404,"correct":29},"测试方法",{"key":31,"text":406,"correct":29},"测试内容和测试结果评判",{"key":34,"text":408,"correct":22},"监理工程师的审核意见",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":214,"analysis":37},1266891,"信息引导及发布系统功能检测时，应检测（ ）。",[413,415,417,419,421],{"key":20,"text":414,"correct":29},"显示性能",{"key":24,"text":416,"correct":29},"系统断电后再次恢复供电时的自动恢复功能",{"key":27,"text":418,"correct":29},"系统终端设备的远程控制功能",{"key":31,"text":420,"correct":22},"图像质量主观评价",{"key":34,"text":422,"correct":22},"质量证明文件",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":36,"analysis":37},1266892,"智能建筑工程施工现场质量管理检查记录应由施工单位填写，（ ）作出检查结论。",[427,428,430,432,434],{"key":20,"text":116,"correct":22},{"key":24,"text":429,"correct":22},"施工单位技术负责人",{"key":27,"text":431,"correct":29},"项目监理机构总监理工程师",{"key":31,"text":433,"correct":29},"建设单位项目负责人",{"key":34,"text":124,"correct":22},{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":67,"analysis":37},1266893,"卫星接收电视系统客观测试应包括（ ）。",[439,441,443,445,447],{"key":20,"text":440,"correct":22},"终端输出电平",{"key":24,"text":442,"correct":29},"视频系统指标",{"key":27,"text":444,"correct":29},"音频系统指标",{"key":31,"text":446,"correct":29},"接收频段",{"key":34,"text":139,"correct":22},{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":52,"analysis":37},1266894,"智能建筑工程接口测试结果记录应由（ ）签字确认。",[452,454,456,458,460],{"key":20,"text":453,"correct":29},"接口提供单位",{"key":24,"text":455,"correct":29},"施工单位",{"key":27,"text":457,"correct":29},"建设单位",{"key":31,"text":459,"correct":29},"项目监理机构",{"key":34,"text":461,"correct":22},"工程质量监督机构",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":96,"analysis":37},1266895,"通风与空调系统安装完毕，应进行通风机和空调机组等设备的单机试运转和调试，并应进行系统的风量平衡调试。单机试运转和调试结果应符合设计要求；系统的总风量与设计风量的允许偏差不应大于（ ），风口的风量与设计风量的允许偏差不应大于（ ）。",[466,468,470,472,474],{"key":20,"text":467,"correct":29},"15％",{"key":24,"text":469,"correct":22},"5％",{"key":27,"text":471,"correct":22},"20％",{"key":31,"text":473,"correct":29},"10％",{"key":34,"text":475,"correct":22},"0.25",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":36,"analysis":37},1266896,"低压配电系统选择的电缆、电线截面不得低于设计值，进场时应对其截面和每芯导体电阻值进行见证取样送检。同厂家各种规格总数的（ ），且不少于（ ）规格。",[480,481,483,485,486],{"key":20,"text":471,"correct":22},{"key":24,"text":482,"correct":22},"3",{"key":27,"text":484,"correct":29},"2",{"key":31,"text":473,"correct":29},{"key":34,"text":487,"correct":22},"1",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":184,"analysis":37},1266897,"系统安装完成后，应在供暖期内与热源联合试运转和调试。联合试运转和调试结果应符合设计要求，供暖房间温度相对于设计计算温度不得低于（ ），且不高于（ ）。",[492,494,496,498,500],{"key":20,"text":493,"correct":22},"4℃",{"key":24,"text":495,"correct":29},"2℃",{"key":27,"text":497,"correct":29},"1℃",{"key":31,"text":499,"correct":22},"3℃",{"key":34,"text":501,"correct":22},"5℃",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":516,"analysis":37},1266898,"空调与采暖系统冷热源及管网节能工程的绝热管道、绝热材料进场时，应对绝热材料的（ ）等技术性能参数进行复验，复验应为见证取样送检。",[506,508,510,512,514],{"key":20,"text":507,"correct":29},"导热系数",{"key":24,"text":509,"correct":22},"容重",{"key":27,"text":511,"correct":29},"密度",{"key":31,"text":513,"correct":22},"厚度",{"key":34,"text":515,"correct":29},"吸水率","ACE",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":184,"analysis":37},1266899,"监测与控制系统的验收分为工程（ ）和系统（ ）两个阶段。",[521,523,525,527,529],{"key":20,"text":522,"correct":22},"验收",{"key":24,"text":524,"correct":29},"实施",{"key":27,"text":526,"correct":29},"检测",{"key":31,"text":528,"correct":22},"调试",{"key":34,"text":530,"correct":22},"模拟",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":543,"analysis":37},1266900,"在通电试运行中，应测试并记录照明系统的（ ）和（ ）值。",[535,536,537,539,541],{"key":20,"text":387,"correct":29},{"key":24,"text":391,"correct":29},{"key":27,"text":538,"correct":22},"电流",{"key":31,"text":540,"correct":22},"电压",{"key":34,"text":542,"correct":22},"接地","AB",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":36,"analysis":37},1266901,"风机盘管机组和绝热材料进场时，应对其下列技术性能参数进行复验，复验应为见证取样送检。同一厂家的风机盘管机组按数量复验（ ），但不得少于（ ）台；同一厂家同材质的绝热材料复验次数不得少于2次。",[548,549,550,551,553],{"key":20,"text":482,"correct":22},{"key":24,"text":487,"correct":22},{"key":27,"text":484,"correct":29},{"key":31,"text":552,"correct":29},"2％",{"key":34,"text":554,"correct":22},"0.03",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":569,"analysis":37},1266902,"施工机械设备管理要健全（ ）等管理制度。",[559,561,563,565,567],{"key":20,"text":560,"correct":22},"“人机不固定”制度",{"key":24,"text":562,"correct":29},"“操作证”制度",{"key":27,"text":564,"correct":29},"岗位责任制度",{"key":31,"text":566,"correct":29},"交接班制度",{"key":34,"text":568,"correct":29},"“安全使用”制度","BCDE",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":584,"analysis":37},1266903,"以下关于设备和管道保温层的质量控制正确的有（ ）。",[574,576,578,580,582],{"key":20,"text":575,"correct":29},"保温层施工不应覆盖设备铭牌",{"key":24,"text":577,"correct":29},"每节管壳的绑扎不应少于2道",{"key":27,"text":579,"correct":22},"管道上的阀门、法兰等需经常维护的部位，保温层不能做成可拆卸式结构",{"key":31,"text":581,"correct":29},"管道上的阀门、法兰等需经常维护的部位，保温层可做成可拆卸式结构",{"key":34,"text":583,"correct":29},"保温层的接触缝要用同样材料的胶泥勾缝","ABDE",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":569,"analysis":37},1266904,"质量计划应包括下列内容（ ）等。",[589,591,593,595,597],{"key":20,"text":590,"correct":22},"编制思路",{"key":24,"text":592,"correct":29},"工程概况及施工条件分析",{"key":27,"text":594,"correct":29},"质量总目标及其分解目标",{"key":31,"text":596,"correct":29},"质量管理组织机构和职责",{"key":34,"text":598,"correct":29},"施工准备及资源配置计划",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":52,"analysis":37},1266905,"材料质量控制的内容主要有（ ）等。",[603,605,607,609,611],{"key":20,"text":604,"correct":29},"材料的质量标准",{"key":24,"text":606,"correct":29},"材料的性能",{"key":27,"text":608,"correct":29},"材料的取样、试验方法",{"key":31,"text":610,"correct":29},"材料的适用范围和施工要求",{"key":34,"text":612,"correct":22},"降低采购材料的成本",{"id":614,"libraryId":5,"type":15,"typeLabel":16,"stem":615,"options":616,"answer":627,"analysis":37},1266906,"室外混凝土排水管道安装的工艺流程为：施工准备、（ ）、开挖沟槽、铺设基础、（ ）、管道与检查井等连接、（ ）、回填土、通水试验。",[617,619,621,623,625],{"key":20,"text":618,"correct":29},"测量放线",{"key":24,"text":620,"correct":29},"管道安装及连接",{"key":27,"text":622,"correct":22},"管道检漏",{"key":31,"text":624,"correct":22},"平整施工现场",{"key":34,"text":626,"correct":29},"灌水试验","ABE",{"id":629,"libraryId":5,"type":15,"typeLabel":16,"stem":630,"options":631,"answer":52,"analysis":37},1266907,"《房屋建筑工程质量保修办法》规定在正常使用条件下，建设工程的最低保修期限为（ ）。",[632,634,636,638,640],{"key":20,"text":633,"correct":29},"地基基础工程和主体结构工程，为设计文件规定的该工程的合理使用年限",{"key":24,"text":635,"correct":29},"屋面防水工程、有防水要求的卫生间、房间和外墙面的防渗漏，为5年；屋面防水工程、有防水要求的卫生间、房间和外墙面的防渗漏，为5年",{"key":27,"text":637,"correct":29},"供热与供冷系统，为2个采暖期、供冷期；电气管线、给水排水管道、设备安装和装修工程，为2年",{"key":31,"text":639,"correct":29},"装修工程为2年",{"key":34,"text":641,"correct":22},"外墙围护结构50年",{"id":643,"libraryId":5,"type":15,"typeLabel":16,"stem":644,"options":645,"answer":214,"analysis":37},1266908,"接地电阻测定的方法（ ）。",[646,648,650,652,654],{"key":20,"text":647,"correct":29},"电压电流表法",{"key":24,"text":649,"correct":29},"比率计法",{"key":27,"text":651,"correct":29},"接地电阻测定仪测量法",{"key":31,"text":653,"correct":22},"电压表法",{"key":34,"text":655,"correct":22},"电流表法",{"id":657,"libraryId":5,"type":15,"typeLabel":16,"stem":658,"options":659,"answer":154,"analysis":37},1266909,"动态考核的特点（ ）",[660,662,664,666,668],{"key":20,"text":661,"correct":29},"动设备受动力驱使而运转",{"key":24,"text":663,"correct":29},"管内有介质按要求而流动",{"key":27,"text":665,"correct":22},"线缆内电流不流通",{"key":31,"text":667,"correct":29},"线缆通电电气装置动作",{"key":34,"text":669,"correct":22},"线缆内电流易于控制",{"id":671,"libraryId":5,"type":15,"typeLabel":16,"stem":672,"options":673,"answer":214,"analysis":37},1266910,"质量计划的作用（ ）。",[674,676,678,680,682],{"key":20,"text":675,"correct":29},"对业主作出承诺",{"key":24,"text":677,"correct":29},"组织实施质量计划，并获得预期的效果",{"key":27,"text":679,"correct":29},"审核和评估相关部门或个人的绩效",{"key":31,"text":681,"correct":22},"应对上级的检查",{"key":34,"text":683,"correct":22},"应对监理工程师的检查",{"id":685,"libraryId":5,"type":15,"typeLabel":16,"stem":686,"options":687,"answer":199,"analysis":37},1266911,"施工现场的工程质量控制包括（ ）。",[688,690,692,694,696],{"key":20,"text":689,"correct":29},"对影响施工质量因素的控制",{"key":24,"text":691,"correct":22},"制定质量方针和质量目标",{"key":27,"text":693,"correct":29},"施工过程事先、事中、事后三阶段的质量控制",{"key":31,"text":695,"correct":22},"质量保证和质量改进",{"key":34,"text":697,"correct":22},"施工过程事中、事后二阶段的质量控制",{"id":699,"libraryId":5,"type":15,"typeLabel":16,"stem":700,"options":701,"answer":627,"analysis":37},1266912,"风管的出风口在走廊、大厅等公共场所要与建筑装修设计和谐协调。为什么？（ ）",[702,704,706,708,710],{"key":20,"text":703,"correct":29},"风口必须与建筑装修的效果向协调",{"key":24,"text":705,"correct":29},"要与其他专业装在一起的部件相互协调",{"key":27,"text":707,"correct":22},"风口依靠其他设备工作",{"key":31,"text":709,"correct":22},"有利于风口的装饰效果",{"key":34,"text":711,"correct":29},"有利于总体的装饰效果",{"id":713,"libraryId":5,"type":15,"typeLabel":16,"stem":714,"options":715,"answer":726,"analysis":37},1266913,"综合效果测定的中的主要检测项目包括（ ）。",[716,718,720,722,724],{"key":20,"text":717,"correct":29},"风速分布",{"key":24,"text":719,"correct":29},"温度分布",{"key":27,"text":721,"correct":29},"相对湿度分布",{"key":31,"text":723,"correct":22},"粉尘分布",{"key":34,"text":725,"correct":29},"噪音分布","ABCE",[728,732,735,738,741,744],{"id":729,"name":730,"category":7,"favorite":731},1,"领导干部任职前廉政法规知识测试题",92,{"id":733,"name":734,"category":7,"favorite":729},595,"建筑结构与设备",{"id":736,"name":737,"category":7,"favorite":729},715,"招标采购专业知识与法律法规",{"id":739,"name":740,"category":7,"favorite":729},848,"市政方向-通用基础",{"id":742,"name":743,"category":7,"favorite":8},534,"BIM工程师",{"id":745,"name":743,"category":7,"favorite":8},535]