[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-854-10":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":720},{"id":5,"name":6,"category":7,"favorite":8},854,"(设备安装质量)专业管理实务 岗位知识","建筑工程",0,10,50,1024,[13,34,52,67,81,95,110,125,139,153,167,181,195,208,222,236,250,264,278,292,306,319,333,347,360,373,387,402,417,431,445,459,473,487,496,510,524,539,551,565,577,591,605,619,634,649,663,677,691,706],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},1266714,1,"单选题","不属于施工准备的内容（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","技术准备",false,{"key":24,"text":25,"correct":22},"B","物资准备",{"key":27,"text":28,"correct":22},"C","组织准备",{"key":30,"text":31,"correct":32},"D","分项工程施工准备",true,"",{"id":35,"libraryId":5,"type":36,"typeLabel":37,"stem":38,"options":39,"answer":51,"analysis":33},1266715,2,"多选题","建筑工程质量是指反映建筑工程满足相关标准规定或合同约定的要求，包括其在（ ）等方面所有明显和隐含能力的特性总和。",[40,42,44,46,48],{"key":20,"text":41,"correct":32},"安全",{"key":24,"text":43,"correct":32},"使用功能",{"key":27,"text":45,"correct":32},"耐久性能",{"key":30,"text":47,"correct":32},"环境保护",{"key":49,"text":50,"correct":22},"E","经济性能","ABCD",{"id":53,"libraryId":5,"type":36,"typeLabel":37,"stem":54,"options":55,"answer":66,"analysis":33},1266716,"特种设备安装前的告知的目的（ ）。",[56,58,60,62,64],{"key":20,"text":57,"correct":32},"便于管理部门审查企业资格是否符合从事活动要求",{"key":24,"text":59,"correct":32},"审查安装的设备是否由合法企业制造",{"key":27,"text":61,"correct":32},"便于及时掌握特种设别的动态和安排现场监督和检验工作",{"key":30,"text":63,"correct":22},"便于审查施工人员是否符合要求",{"key":49,"text":65,"correct":22},"便于计算支出费用","ABC",{"id":68,"libraryId":5,"type":36,"typeLabel":37,"stem":69,"options":70,"answer":66,"analysis":33},1266717,"现行的《智能建筑工程质量验收规范》GB50339-2013要求当紧急广播系统具有火灾广播功能时，应检查（ ）的防火保护措施。",[71,73,75,77,79],{"key":20,"text":72,"correct":32},"传输线缆",{"key":24,"text":74,"correct":32},"槽盒",{"key":27,"text":76,"correct":32},"导管",{"key":30,"text":78,"correct":22},"备用电源",{"key":49,"text":80,"correct":22},"开关",{"id":82,"libraryId":5,"type":36,"typeLabel":37,"stem":83,"options":84,"answer":51,"analysis":33},1266718,"现行的《通风与空调工程施工质量验收规范》GB50243-2002要求电加热器的安装必须符合的规定包括（ ）。",[85,87,89,91,93],{"key":20,"text":86,"correct":32},"电加热器与钢结构间的绝热层必须为不燃材料",{"key":24,"text":88,"correct":32},"接线柱外露的应加设防护罩",{"key":27,"text":90,"correct":32},"电加热器的金属外壳接地必须良好",{"key":30,"text":92,"correct":32},"连接电加热器的风管的法兰垫片，应采用耐热不燃材料",{"key":49,"text":94,"correct":22},"电加热器与钢结构间的绝热层可以为可燃材料",{"id":96,"libraryId":5,"type":36,"typeLabel":37,"stem":97,"options":98,"answer":109,"analysis":33},1266719,"在安全和功能检验记录方面，给水排水与采暖工程包括（ ）",[99,101,103,105,107],{"key":20,"text":100,"correct":32},"给水管道通水试验记录",{"key":24,"text":102,"correct":32},"卫生器具满水实验记录",{"key":27,"text":104,"correct":22},"照明全负荷实验记录",{"key":30,"text":106,"correct":32},"排水干道通球实验记录",{"key":49,"text":108,"correct":22},"系统及电源检查报告","ABD",{"id":111,"libraryId":5,"type":36,"typeLabel":37,"stem":112,"options":113,"answer":124,"analysis":33},1266720,"备案管理的相关规定中规定竣工验收备案提交的文件包括（ ）。",[114,116,118,120,122],{"key":20,"text":115,"correct":32},"工程竣工验收备案表",{"key":24,"text":117,"correct":32},"工程竣工验收报告",{"key":27,"text":119,"correct":22},"工程竣工检查报告",{"key":30,"text":121,"correct":22},"工程验收评审报告",{"key":49,"text":123,"correct":22},"工程验收报审表","AB",{"id":126,"libraryId":5,"type":36,"typeLabel":37,"stem":127,"options":128,"answer":51,"analysis":33},1266721,"分项工程应按主要（ ）等进行划分。",[129,131,133,135,137],{"key":20,"text":130,"correct":32},"工种",{"key":24,"text":132,"correct":32},"材料",{"key":27,"text":134,"correct":32},"施工工艺",{"key":30,"text":136,"correct":32},"设备类别",{"key":49,"text":138,"correct":22},"楼层",{"id":140,"libraryId":5,"type":36,"typeLabel":37,"stem":141,"options":142,"answer":51,"analysis":33},1266722,"观感质量验收的检查方法有（ ）。",[143,145,147,149,151],{"key":20,"text":144,"correct":32},"观察",{"key":24,"text":146,"correct":32},"凭验收人员的经验",{"key":27,"text":148,"correct":32},"触摸",{"key":30,"text":150,"correct":32},"简单量测",{"key":49,"text":152,"correct":22},"科学仪器",{"id":154,"libraryId":5,"type":36,"typeLabel":37,"stem":155,"options":156,"answer":51,"analysis":33},1266723,"检验批的质量检验，应根据检验项目的特点在下列抽样方案中选择：（ ）。",[157,159,161,163,165],{"key":20,"text":158,"correct":32},"计量、计数的抽样方案采用一次、二次或多次抽样方案",{"key":24,"text":160,"correct":32},"对重要的检验项目，当有简易快速的检验方法时，选用全数检验方案",{"key":27,"text":162,"correct":32},"根据生产连续性和生产控制稳定性情况，采用调整型抽样方案",{"key":30,"text":164,"correct":32},"经实践检验有效的抽样方案",{"key":49,"text":166,"correct":22},"随机抽样方案",{"id":168,"libraryId":5,"type":36,"typeLabel":37,"stem":169,"options":170,"answer":51,"analysis":33},1266724,"建设单位收到工程竣工报告后，应由建设单位项目负责人组织（ ）等单位项目负责人进行单位工程验收。",[171,173,175,177,179],{"key":20,"text":172,"correct":32},"监理",{"key":24,"text":174,"correct":32},"施工",{"key":27,"text":176,"correct":32},"设计",{"key":30,"text":178,"correct":32},"勘察",{"key":49,"text":180,"correct":22},"检测",{"id":182,"libraryId":5,"type":36,"typeLabel":37,"stem":183,"options":184,"answer":109,"analysis":33},1266725,"现行的《建筑电气工程施工质量验收规范》GB50303-2002要求电气工程应试运行的项目包括（ ）。",[185,187,189,191,193],{"key":20,"text":186,"correct":32},"建筑电气工程的动力工程空载运行和负荷试运行",{"key":24,"text":188,"correct":32},"照明工程的负荷（通电）试运行",{"key":27,"text":190,"correct":22},"高压电器动力设备试运行",{"key":30,"text":192,"correct":32},"低压电器动力设备试运行",{"key":49,"text":194,"correct":22},"建筑电气工程的动力工程只需负荷试运行",{"id":196,"libraryId":5,"type":36,"typeLabel":37,"stem":197,"options":198,"answer":66,"analysis":33},1266726,"检验批可根据施工及质量控制和专业验收需要按（ ）等进行划分。",[199,200,202,204,206],{"key":20,"text":138,"correct":32},{"key":24,"text":201,"correct":32},"施工段",{"key":27,"text":203,"correct":32},"变形缝",{"key":30,"text":205,"correct":22},"专业性质",{"key":49,"text":207,"correct":22},"施工程序",{"id":209,"libraryId":5,"type":36,"typeLabel":37,"stem":210,"options":211,"answer":66,"analysis":33},1266727,"现行的《建筑给水排水及采暖工程施工质量验收规范》GB50242-2002中管道安装坡度，当设计未注明时，应符合相关规定，包括（ ）。",[212,214,216,218,220],{"key":20,"text":213,"correct":32},"气、水同向流动的热水采暖管道和气、水同向流动的蒸汽管道及凝结水管道，坡度应为3‰，不得小于2‰",{"key":24,"text":215,"correct":32},"气、水逆向流动热水采暖管道和气、水逆向流动的蒸汽管道，坡度不应小于5‰",{"key":27,"text":217,"correct":32},"散热器支管的坡度应为1%，坡向应有利于排气和泄水",{"key":30,"text":219,"correct":22},"散热器干管的坡度应为1%，坡向应有利于排气和泄水",{"key":49,"text":221,"correct":22},"气、水逆向流动热水采暖管道和气、水逆向流动的蒸汽管道，坡度不应小于3‰",{"id":223,"libraryId":5,"type":36,"typeLabel":37,"stem":224,"options":225,"answer":109,"analysis":33},1266728,"特种设备的监督检验的主要工作内容包括（ ）。",[226,228,230,232,234],{"key":20,"text":227,"correct":32},"确认核实制造、安装过程中涉及安全性能的项目",{"key":24,"text":229,"correct":32},"对出厂技术资料的确认",{"key":27,"text":231,"correct":22},"对维修人员进行资格审查",{"key":30,"text":233,"correct":32},"对受检单位质量体系运转情况抽查",{"key":49,"text":235,"correct":22},"对受检单位的执照进行抽查",{"id":237,"libraryId":5,"type":36,"typeLabel":37,"stem":238,"options":239,"answer":66,"analysis":33},1266729,"属于自动喷水灭火系统交工验收质量材料的是（ ）。",[240,242,244,246,248],{"key":20,"text":241,"correct":32},"施工现场质量管理检查记录",{"key":24,"text":243,"correct":32},"施工过程质量检查记录",{"key":27,"text":245,"correct":32},"自动喷水灭火系统工程质量控制资料检查记录",{"key":30,"text":247,"correct":22},"观感质量检查记录",{"key":49,"text":249,"correct":22},"施工人员资料",{"id":251,"libraryId":5,"type":36,"typeLabel":37,"stem":252,"options":253,"answer":66,"analysis":33},1266730,"现行的《建筑电气工程施工质量验收规范》GB50303-2002要求敞开式灯具的灯头对地面的距离为（ ）。",[254,256,258,260,262],{"key":20,"text":255,"correct":32},"室外不小于2.5m（室外墙上安装）",{"key":24,"text":257,"correct":32},"厂房内不小于2.5m",{"key":27,"text":259,"correct":32},"室内不小于2m（办公室、学校、宿舍等）",{"key":30,"text":261,"correct":22},"室内不小于2.5m（办公室、学校、宿舍等）",{"key":49,"text":263,"correct":22},"厂房内不小于1.5m",{"id":265,"libraryId":5,"type":36,"typeLabel":37,"stem":266,"options":267,"answer":51,"analysis":33},1266731,"属于自动喷水灭火系统的调试项目的是（ ）。",[268,270,272,274,276],{"key":20,"text":269,"correct":32},"水源调试",{"key":24,"text":271,"correct":32},"消防水泵调试",{"key":27,"text":273,"correct":32},"稳压泵调试",{"key":30,"text":275,"correct":32},"报警阀调试",{"key":49,"text":277,"correct":22},"消防头调试",{"id":279,"libraryId":5,"type":36,"typeLabel":37,"stem":280,"options":281,"answer":51,"analysis":33},1266732,"通风与空调工程施工交工验收用的质量资料中的工程安全和功能检验资料核查及主要功能抽查记录包括（ ）。",[282,284,286,288,290],{"key":20,"text":283,"correct":32},"通风、空调系统试运行记录",{"key":24,"text":285,"correct":32},"风量、温度测试记录",{"key":27,"text":287,"correct":32},"洁净室洁净度测试记录",{"key":30,"text":289,"correct":32},"制冷机组试运行调试记录",{"key":49,"text":291,"correct":22},"湿度测试记录",{"id":293,"libraryId":5,"type":36,"typeLabel":37,"stem":294,"options":295,"answer":66,"analysis":33},1266733,"符合下列条件之一时，可按相关专业验收规范的规定适当调整抽样复验、试验数量，调整后的抽样复验、试验方案应由施工单位编制，并报监理单位审核确认。（ ）。",[296,298,300,302,304],{"key":20,"text":297,"correct":32},"同一项目中由相同施工单位施工的多个单位工程，使用同一生产厂家的同品种、同规格、同批次的材料、构配件、设备",{"key":24,"text":299,"correct":32},"同一施工单位在现场加工的成品、半成品、构配件用于同一项目中的多个单位工程",{"key":27,"text":301,"correct":32},"在同一项目中，针对同一抽样对象已有检验成果可以重复利用",{"key":30,"text":303,"correct":22},"同一项目中，同一监理单位的监理的工程检验成果可重复利用",{"key":49,"text":305,"correct":22},"施工单位提出，监理单位认可的可重复利用的检测成果",{"id":307,"libraryId":5,"type":36,"typeLabel":37,"stem":308,"options":309,"answer":318,"analysis":33},1266734,"在观感制冷检查要点方面，建筑智能化工程包括（ ）",[310,312,313,315,317],{"key":20,"text":311,"correct":22},"系统试运行记录",{"key":24,"text":108,"correct":22},{"key":27,"text":314,"correct":32},"机房设备安装于布局",{"key":30,"text":316,"correct":32},"现场设备安装",{"key":49,"text":104,"correct":22},"CD",{"id":320,"libraryId":5,"type":36,"typeLabel":37,"stem":321,"options":322,"answer":51,"analysis":33},1266735,"建筑电气工程施工质量交工验收用的质量资料中工程安全和功能检验资料核查及主要功能抽查记录包括（ ）。",[323,325,327,329,331],{"key":20,"text":324,"correct":32},"照明全负荷试验记录",{"key":24,"text":326,"correct":32},"大型灯具牢固性试验记录",{"key":27,"text":328,"correct":32},"避雷接地电阻试验记录",{"key":30,"text":330,"correct":32},"线路、插座、开关接地检验记录",{"key":49,"text":332,"correct":22},"个别区域照明负荷试验记录",{"id":334,"libraryId":5,"type":36,"typeLabel":37,"stem":335,"options":336,"answer":109,"analysis":33},1266736,"工程资料记录的基本要求是（ ）",[337,339,341,343,345],{"key":20,"text":338,"correct":32},"真实、准确、完整、齐全、有可追溯性",{"key":24,"text":340,"correct":32},"能反应工程实体的面貌，要求及时形成，与工程进度同步填写",{"key":27,"text":342,"correct":22},"可以回忆记录",{"key":30,"text":344,"correct":32},"签字人员应是实际作业或管理人员，不能代签",{"key":49,"text":346,"correct":22},"必须项目部经理签字",{"id":348,"libraryId":5,"type":36,"typeLabel":37,"stem":349,"options":350,"answer":359,"analysis":33},1266737,"建筑电气工程施工质量交工验收用的质量资料包括（ ）。",[351,353,355,357,358],{"key":20,"text":352,"correct":32},"质量控制资料",{"key":24,"text":354,"correct":22},"技术控制资料",{"key":27,"text":356,"correct":32},"工程安全和功能检验资料核查及主要功能抽查记录",{"key":30,"text":247,"correct":32},{"key":49,"text":249,"correct":22},"ACD",{"id":361,"libraryId":5,"type":36,"typeLabel":37,"stem":362,"options":363,"answer":124,"analysis":33},1266738,"检验批合格的规定（ ）",[364,366,368,370,372],{"key":20,"text":365,"correct":32},"主控项目和一般项目的质量经抽检样检验合格",{"key":24,"text":367,"correct":32},"具有完整的施工操作依据、质量检查记录",{"key":27,"text":369,"correct":22},"质量控制质量完整",{"key":30,"text":371,"correct":22},"单位工程合格",{"key":49,"text":104,"correct":22},{"id":374,"libraryId":5,"type":36,"typeLabel":37,"stem":375,"options":376,"answer":66,"analysis":33},1266739,"电能的单位包括（ ）。",[377,379,381,383,385],{"key":20,"text":378,"correct":32},"焦耳",{"key":24,"text":380,"correct":32},"千瓦时",{"key":27,"text":382,"correct":32},"兆瓦时",{"key":30,"text":384,"correct":22},"瓦特",{"key":49,"text":386,"correct":22},"安培",{"id":388,"libraryId":5,"type":36,"typeLabel":37,"stem":389,"options":390,"answer":401,"analysis":33},1266740,"材料送检的判定范围（ ）。",[391,393,395,397,399],{"key":20,"text":392,"correct":32},"国家行政法规规定的涉及结构性安全的材料",{"key":24,"text":394,"correct":32},"技术标准或施工规范的有关条款明确规定的必须送检的材料",{"key":27,"text":396,"correct":22},"监理工程师凭经验判定需送检的材料",{"key":30,"text":398,"correct":32},"验收双方有争议是可有第三方检测机构进行检测",{"key":49,"text":400,"correct":32},"从送检的分类看，可分为强制性检测和争议性检测两种","ABDE",{"id":403,"libraryId":5,"type":36,"typeLabel":37,"stem":404,"options":405,"answer":416,"analysis":33},1266741,"特种设备的基本特征包括（ ）。",[406,408,410,412,414],{"key":20,"text":407,"correct":32},"涉及生命安全",{"key":24,"text":409,"correct":22},"制造成本高",{"key":27,"text":411,"correct":32},"危险性较大",{"key":30,"text":413,"correct":22},"环境要求高",{"key":49,"text":415,"correct":22},"需要人员多","AC",{"id":418,"libraryId":5,"type":36,"typeLabel":37,"stem":419,"options":420,"answer":66,"analysis":33},1266742,"设备验收准备的内容包括：（ ）。",[421,423,425,427,429],{"key":20,"text":422,"correct":32},"决定参与验收的人员",{"key":24,"text":424,"correct":32},"收集采购协议或合同、质量标准等技术资料",{"key":27,"text":426,"correct":32},"配备相应的检测和计量工具",{"key":30,"text":428,"correct":22},"准备供货源头资料",{"key":49,"text":430,"correct":22},"项目经理的签字确认",{"id":432,"libraryId":5,"type":36,"typeLabel":37,"stem":433,"options":434,"answer":359,"analysis":33},1266743,"消防工程施工中消防产品进场时必须具备（ ），并报现场监理审核合格后方可用在消防安装工程上。",[435,437,439,441,443],{"key":20,"text":436,"correct":32},"产品质保书",{"key":24,"text":438,"correct":22},"出厂证明",{"key":27,"text":440,"correct":32},"合格证",{"key":30,"text":442,"correct":32},"合格产品检验书",{"key":49,"text":444,"correct":22},"发票",{"id":446,"libraryId":5,"type":36,"typeLabel":37,"stem":447,"options":448,"answer":401,"analysis":33},1266744,"建筑工程质量验收应划分为（ ）。",[449,451,453,455,457],{"key":20,"text":450,"correct":32},"分部工程",{"key":24,"text":452,"correct":32},"分项工程",{"key":27,"text":454,"correct":22},"总工程",{"key":30,"text":456,"correct":32},"单位工程",{"key":49,"text":458,"correct":32},"检验批",{"id":460,"libraryId":5,"type":36,"typeLabel":37,"stem":461,"options":462,"answer":66,"analysis":33},1266745,"质量员将验收合格的检验批，填好表格后交监理（建设）单位有关人员，有关人员应及时验收，可采取（ ）来确定是否通过验收。",[463,465,467,469,471],{"key":20,"text":464,"correct":32},"抽样方法",{"key":24,"text":466,"correct":32},"宏观检查方法",{"key":27,"text":468,"correct":32},"必要时抽样检测",{"key":30,"text":470,"correct":22},"抽样检测",{"key":49,"text":472,"correct":22},"全数检测",{"id":474,"libraryId":5,"type":36,"typeLabel":37,"stem":475,"options":476,"answer":124,"analysis":33},1266746,"建设工程施工质量验收统一标准要求（ ）。",[477,479,481,483,485],{"key":20,"text":478,"correct":32},"该标准是建筑工程各专业工程施工质量验收规范编制的统一准则",{"key":24,"text":480,"correct":32},"建筑工程各专业施工质量验收规范必须与该标准配合使用",{"key":27,"text":482,"correct":22},"建筑工程各专业施工质量验收必须服从该标准",{"key":30,"text":484,"correct":22},"建筑工程各专业工程施工必须遵从这一标准",{"key":49,"text":486,"correct":22},"建筑工程各专业施工质量验收只遵从此规范",{"id":488,"libraryId":5,"type":36,"typeLabel":37,"stem":489,"options":490,"answer":359,"analysis":33},1266747,"通风与空调工程施工交工验收用的质量资料包括（ ）。",[491,492,493,494,495],{"key":20,"text":352,"correct":32},{"key":24,"text":354,"correct":22},{"key":27,"text":356,"correct":32},{"key":30,"text":247,"correct":32},{"key":49,"text":249,"correct":22},{"id":497,"libraryId":5,"type":36,"typeLabel":37,"stem":498,"options":499,"answer":51,"analysis":33},1266748,"属于自动喷水灭火系统交工验收质量材料中施工过程质量检查记录的是（ ）。",[500,502,504,506,508],{"key":20,"text":501,"correct":32},"自动喷水灭火系统试压记录",{"key":24,"text":503,"correct":32},"自动喷水灭火系统施工过程质量检查记录",{"key":27,"text":505,"correct":32},"自动喷水灭火系统管网冲洗记录",{"key":30,"text":507,"correct":32},"自动喷水灭火系统联动试验记录",{"key":49,"text":509,"correct":22},"自动喷水灭火系统安装记录",{"id":511,"libraryId":5,"type":36,"typeLabel":37,"stem":512,"options":513,"answer":51,"analysis":33},1266749,"参加单位工程质量竣工验收的单位为（ ）等。",[514,516,518,520,522],{"key":20,"text":515,"correct":32},"建设单位",{"key":24,"text":517,"correct":32},"施工单位",{"key":27,"text":519,"correct":32},"勘察、设计单位",{"key":30,"text":521,"correct":32},"监理单位",{"key":49,"text":523,"correct":22},"材料供应单位",{"id":525,"libraryId":5,"type":36,"typeLabel":37,"stem":526,"options":527,"answer":538,"analysis":33},1266750,"下列属于电线进场验收主要内容的有（ ）。",[528,530,532,534,536],{"key":20,"text":529,"correct":32},"按批查验合格证",{"key":24,"text":531,"correct":22},"紧急情况下，可以不进行电线验收",{"key":27,"text":533,"correct":32},"抽检电线绝缘层完整无损、厚度均匀",{"key":30,"text":535,"correct":32},"按制造标准抽检圆形芯线的线径和绝缘层的厚度",{"key":49,"text":537,"correct":32},"外观检查应包装完好","ACDE",{"id":540,"libraryId":5,"type":36,"typeLabel":37,"stem":541,"options":542,"answer":66,"analysis":33},1266751,"建筑工程交工验收用的质量资料包含（ ）。",[543,544,546,547,549],{"key":20,"text":352,"correct":32},{"key":24,"text":545,"correct":32},"工程安全和功能检验及主要功能抽查记录",{"key":27,"text":247,"correct":32},{"key":30,"text":548,"correct":22},"施工进程和记录",{"key":49,"text":550,"correct":22},"人员资料",{"id":552,"libraryId":5,"type":36,"typeLabel":37,"stem":553,"options":554,"answer":51,"analysis":33},1266752,"分部（子分部）工程验收合格的规定包括（ ）。",[555,557,559,561,563],{"key":20,"text":556,"correct":32},"分部（子分部）工程所含分项工程的质量均应验收合格",{"key":24,"text":558,"correct":32},"质量控制资料应完整",{"key":27,"text":560,"correct":32},"地基与基础、主体结构等分部工程有关安全及功能的检测和抽样检测结果应符合有关规定",{"key":30,"text":562,"correct":32},"观感质量应符合要求",{"key":49,"text":564,"correct":22},"人员资料应完整",{"id":566,"libraryId":5,"type":36,"typeLabel":37,"stem":567,"options":568,"answer":51,"analysis":33},1266753,"单位（子单位）工程验收合格的规定包含（ ）。",[569,571,572,574,576],{"key":20,"text":570,"correct":32},"单位（子单位）工程所包含分部（子分部）工程的质量均应验收合格",{"key":24,"text":558,"correct":32},{"key":27,"text":573,"correct":32},"单位（子单位）工程所含分部工程有关安全和功能的监测资料应完整",{"key":30,"text":575,"correct":32},"观感质量验收应符合要求",{"key":49,"text":564,"correct":22},{"id":578,"libraryId":5,"type":36,"typeLabel":37,"stem":579,"options":580,"answer":66,"analysis":33},1266754,"下列是制作支架用型钢电焊条外观质量检查内容的有（ ）。",[581,583,585,587,589],{"key":20,"text":582,"correct":32},"型钢表面无严重锈蚀（即无锈皮脱落现象）",{"key":24,"text":584,"correct":32},"无过度弯曲扭曲现象或弯折变形现象",{"key":27,"text":586,"correct":32},"电焊条包装完整、拆包抽检焊条尾部无锈斑",{"key":30,"text":588,"correct":22},"有产品出厂合格证",{"key":49,"text":590,"correct":22},"有产品生产日期",{"id":592,"libraryId":5,"type":36,"typeLabel":37,"stem":593,"options":594,"answer":66,"analysis":33},1266755,"在建筑给水排水及采暖工程施工质量检测中，检测弯制钢管时，其弯曲半径应（ ）。",[595,597,599,601,603],{"key":20,"text":596,"correct":32},"热弯，不小于管道外径的3.5倍",{"key":24,"text":598,"correct":32},"冷弯，不小于管道外径的4倍",{"key":27,"text":600,"correct":32},"焊接弯头，不小于管道外径的1.5倍",{"key":30,"text":602,"correct":22},"冲压弯头，不小于管道外径的1.5倍",{"key":49,"text":604,"correct":22},"冷弯，不小于管道外径的3倍",{"id":606,"libraryId":5,"type":36,"typeLabel":37,"stem":607,"options":608,"answer":66,"analysis":33},1266756,"按照《通风与空调工程施工质量验收规范》GB50243～2002规定制冷管道系统应做（ ）。",[609,611,613,615,617],{"key":20,"text":610,"correct":32},"强度试验",{"key":24,"text":612,"correct":32},"气密性试验",{"key":27,"text":614,"correct":32},"真空试验",{"key":30,"text":616,"correct":22},"压力试验",{"key":49,"text":618,"correct":22},"通球试验记",{"id":620,"libraryId":5,"type":36,"typeLabel":37,"stem":621,"options":622,"answer":633,"analysis":33},1266757,"下列选项符合镀锌钢板外观检查要求的有：（ ）。",[623,625,627,629,631],{"key":20,"text":624,"correct":32},"没有裂纹",{"key":24,"text":626,"correct":22},"必须有水印",{"key":27,"text":628,"correct":22},"有产品出厂证",{"key":30,"text":630,"correct":22},"有质量合格证",{"key":49,"text":632,"correct":32},"没有水印","AE",{"id":635,"libraryId":5,"type":36,"typeLabel":37,"stem":636,"options":637,"answer":648,"analysis":33},1266758,"工程建设强制性标准的监督检查内容包括（ ）。",[638,640,642,644,646],{"key":20,"text":639,"correct":32},"有关工程技术人员是否熟悉、掌握强制性标准的规定",{"key":24,"text":641,"correct":32},"工程项目采用的材料、设备是否符合强制性标准的规定",{"key":27,"text":643,"correct":32},"工程项目的安全、质量是否符合强制性标准的规定",{"key":30,"text":645,"correct":22},"工程项目的施工人员是否符合强制性标准的规定",{"key":49,"text":647,"correct":32},"工程中采用的导则、指南、手册、计算机软件的内容是否符合强制性标准的规定","ABCE",{"id":650,"libraryId":5,"type":36,"typeLabel":37,"stem":651,"options":652,"answer":109,"analysis":33},1266759,"现行的《建筑电气工程施工质量验收规范》GB50303-2002要求建筑物景观照明灯具应符合（ ）。",[653,655,657,659,661],{"key":20,"text":654,"correct":32},"A.每套灯具的导电部分对地绝缘电阻大于2兆欧姆",{"key":24,"text":656,"correct":32},"在人行道等人员往来密集场所所安装的落地式灯具，无围栏防护，安装高度距地面2.5m以上",{"key":27,"text":658,"correct":22},"建筑物景观照明灯具间隔不小于1m",{"key":30,"text":660,"correct":32},"金属构架和灯具的可接近裸露导体及金属软管的接地（P或接零（PEN）可靠，且有标识",{"key":49,"text":662,"correct":22},"建筑物景观照明灯具间隔不小于3m",{"id":664,"libraryId":5,"type":36,"typeLabel":37,"stem":665,"options":666,"answer":51,"analysis":33},1266760,"下列是材料检测报告的必备内容的有（ ）。",[667,669,671,673,675],{"key":20,"text":668,"correct":32},"报告日期",{"key":24,"text":670,"correct":32},"检测环境条件",{"key":27,"text":672,"correct":32},"依据的技术标准",{"key":30,"text":674,"correct":32},"检测方法标准",{"key":49,"text":676,"correct":22},"检测方法新技术",{"id":678,"libraryId":5,"type":36,"typeLabel":37,"stem":679,"options":680,"answer":66,"analysis":33},1266761,"现行的《自动喷水灭火系统施工及验收规范》GB50261-2005附录F中把系统工程质量缺陷分为（ ）。",[681,683,685,687,689],{"key":20,"text":682,"correct":32},"A.严重缺陷项",{"key":24,"text":684,"correct":32},"B.重缺陷项",{"key":27,"text":686,"correct":32},"C.轻缺陷项",{"key":30,"text":688,"correct":22},"无缺现象",{"key":49,"text":690,"correct":22},"重大缺陷",{"id":692,"libraryId":5,"type":36,"typeLabel":37,"stem":693,"options":694,"answer":705,"analysis":33},1266762,"竣工验收备案提交文件中的工程竣工验收报告应包括（ ）。",[695,697,699,701,703],{"key":20,"text":696,"correct":32},"工程报建日期",{"key":24,"text":698,"correct":32},"施工许可证号",{"key":27,"text":700,"correct":32},"施工图设计文件审查意见",{"key":30,"text":702,"correct":32},"备案机关认为需要提供的其他有关资料",{"key":49,"text":704,"correct":32},"市政基础设施的有关质量检测和功能性试验资料","ABCDE",{"id":707,"libraryId":5,"type":36,"typeLabel":37,"stem":708,"options":709,"answer":51,"analysis":33},1266763,"房屋建筑工程在验收竣工后在保修期限内出现质量缺陷，保修的程序包括（ ）。",[710,712,714,716,718],{"key":20,"text":711,"correct":32},"建设单位或房屋所有人在保修期内发现质量缺陷，向施工单位发出保修通知书",{"key":24,"text":713,"correct":32},"施工单位接保修通知后到现场检查确认",{"key":27,"text":715,"correct":32},"在保修书约定时间内施工单位实施保修修复",{"key":30,"text":717,"correct":32},"保修完成后，建设单位或房屋所有人进行验收",{"key":49,"text":719,"correct":22},"支付保修费用",[721,724,727,730,733,736],{"id":15,"name":722,"category":7,"favorite":723},"领导干部任职前廉政法规知识测试题",92,{"id":725,"name":726,"category":7,"favorite":15},595,"建筑结构与设备",{"id":728,"name":729,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":731,"name":732,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":734,"name":735,"category":7,"favorite":8},534,"BIM工程师",{"id":737,"name":735,"category":7,"favorite":8},535]